The document contains temperature and pressure readings taken every 30 seconds over a 12 hour period on August 9, 2008. The readings remained steady between 14.55-14.65 degrees and 89.69-90.81 for the first 7 readings. Then the temperature increased rapidly over 30 minutes from 640.96 to 757 degrees while the pressure rose from 91.54 to 172.85. The temperature and pressure then remained steady for the remainder of the recorded period.
The document contains temperature and pressure readings taken every 30 seconds over a 12 hour period on August 9, 2008. The readings remained steady between 14.55-14.65 degrees and 89.69-90.81 for the first 7 readings. Then the temperature increased rapidly over 30 minutes from 640.96 to 757 degrees while the pressure rose from 91.54 to 172.85. The temperature and pressure then remained steady for the remainder of the recorded period.
The document contains temperature and pressure readings taken every 30 seconds over a 12 hour period on August 9, 2008. The readings remained steady between 14.55-14.65 degrees and 89.69-90.81 for the first 7 readings. Then the temperature increased rapidly over 30 minutes from 640.96 to 757 degrees while the pressure rose from 91.54 to 172.85. The temperature and pressure then remained steady for the remainder of the recorded period.
Pressure Rate Date: Time (psi) (M3/D) Description. 8/9/2008 13:00 R/Up Lubricator. 16:00 R.I.H Sinker to 537 m Mku 16:30 Sinker reached TD # 537 m Mku - P.O.O.H 16:50 First data / PressureGauge Connected to tool string. 16:56 640 Open well to lubricator. 17:01 R.I.H 17:06 Stop@ 100 m Mku 17:17 R.I.H 17:23 Stop @ 200 m Mku. 17:28 R.I.H 17:30 Stop @ 300 m Mku 17:35 R.I.H 17:37 Stop @ 400 m Mku 17:42 R.I.H 17:46 Tool on depth @ 537 m Mku. 18:00 Put the well on production. 22:00 640 Shut in well at Wing valve for PBU. 9/9/2008 22;00 760 P.O.O.H for Static Gradients 22:10 Stop@ 400 m Mku 22:15 P.O.O.H 22:23 Stop @ 300 m Mku 22:28 P.O.O.H 22:33 Stop @ 200 m Mku. 22:38 P.O.O.H 22:42 Stop @ 100 m Mku. 22:47 P.O.O.H 22:52 Stop @ 0 m Mku. 22:57 Re run in the sensing point. @ 537 m Mku. 23:18 Tool on depth @ 537 m Mku. 10/9/2008 0:00 760 Open well on 19 mm Choke 4:00 680 Shut in well for 4 hours 8:00 760 Open well on 21 mm Choke 12:00 675 Shut in well for 4 hours 16:00 760 Open well on 23mm Choke 20:00 655 Shut in well for 4 hours. 11/9/2008 0:00 760 Open well on 25mm choke. 4:00 635 Switched choke to 23 mm for extended flow test, 8 Hours.. 12:00 P.O.O.H, Bhp survey completed. Rig Down SRO. arangtritis 4
Daftar Belanja 53 Akun Kode Nup No SPM Nilai sp2d Tanggal 533111 B 9 296 217,722,820 180822401000020 11/23/2018 533111 A 8 322 472,024,540 180822401000021 12/10/2018