You are on page 1of 2

CONTENT PAGE NO

ABSTRACT i
CHAPTER – 1:-

INTRODUCTION 1-2

1.1. HISTORY 1

1.2. NEED 1-2

1.3. SCOPE 2

CHAPTER – 2:-

LITERATURE REVIEW 3-5

CHAPTER – 3:-

IMPORTANCE AND BENEFITS 6-7

CHAPTER – 4:-

PALINNG AND DESING CONSIDERATION 8-15

4.1. RAINWATER HARVESTING AT CBIT CAMPUS 8

4.2. COMPONENTS OF RAINWATER HARVESTING 8-11

4.3. FILTERATION PROCESS 11-12

4.4. STORAGE TANK 12-13

4.5. RAINWATER HARVESTING TECHNIQUES 14-15

CHAPTER – 5:-

STUDY AREA AND DATA COLLECTION 16-18

5.1. STUDY AREA 16

5.2. DATA COLLECTION 17


5.3. RAINFALL AND CLIMATE 17-18

5.4. DETERMINATION OF CATCHMENT AREA 18

CHAPTER – 6:-

METHODOLGY 19-25

6.1. HYDROLOGICAL 19

6.2. RUNOFF CO-EFFICIENT 19-23

6.3. CALCULATION FOR DIAMETRE OF THE DISCHARGE


PIPE 23 -25

CHAPTER – 7:-

STUDY OF THE FILTERS 26-28

CHAPTER – 8:-

STUDY OF PIEZOELECTRIC GENERATORS 29-30

CHAPTER – 9:-

CONCLUSION 31

REFFERENCES 32

You might also like