You are on page 1of 3
Bidding Documents Part II - Requirements ‘Malolos ~ Clark Railway Project (Blumentritt Extension) Section 6 ~ Part 14 Package CP S-01: Viaduct Structure and 1 Station Volume 1 ~The General Specification 118.10 The Contractor shall respond to the environmental complaints received from the complaints procedure and provide written reports to the Engineer of said complaints and of the corrective actions taken. A record of all complaints, responses and follow up actions shall be included within the Contractor's Monthly Progress Report under “Other Matters” (GS 111.12 (m)). 1189.5 Environmental Guarantee Fund ‘The Contractor shall arrange with the Environmental Management Bureau for the setting up of the Environmental Guarantee Fund as per DENR Administrative Order (DAO) No. 2000-05 (Revising DAO No. 94-11, Supplementing DAO No. 96-37, Series Of 1996, and Providing for Programmatic Compliance Procedures within the Environmental Impact Statement [EIS] System) in the form of commercial insurance, surety bond, trust fund, or a combination thereof, in the amount to be specified by the DENR EMB and callable upon demand. The fund shall be used for the immediate cleaning up or rehabilitation of areas affected by damages in the environment and the resulting deterioration of environmental quality as a direct consequence of the project's construction activites. 1189.6 Temporary Facilities. This CEEMP shall apply to all facilities and shall be considered minimum requirements for those with separate EIS/ECC. The contractor shall submit the plan for the temporary facilities outlined in 103.2 Contractor's Mobilization Program as an appendix of the CEMMP for review by the Engineer/ Employer. Monthly Progress Report Reporting requirements are contained in GS 111 Measurement and Payment 118.111 Method of Measurement a) “Environmental Management” shall be measured as a Lump Sum item; b) “Environmental Management” shall be measured under the following items: i, General Environmental items not included elsewhere; ii, Preparation and submission of Contractor's Environmental ‘Management and Monitoring Plan (CEMMP); iii. Operation and Management of the CEMMP; iv, Historie PNR Station Protection Survey and Report v. Works instructed for protection and/or remedial works to Old PNR Stations vi Special Provisions vii, Environmental Guarantee Fund Payment; viii. All Monthly Progress Report Activities, ©) The payment schedule for “Environmental Management” shall be: Bidding Documents Part II - Require Malolos ~ Clark Railway Project (Blumentritt Extension) Section 6 — Part Package CP S-01: Viaduct Structure and 1 Station ‘Volume 1 ~ The General S} i. 20% upon approval of the Contractor Environmental Management Monitoring Plan ji, 60% made in equal instalments, proportionately over the construction subject to certification by the Engineer that the Contractor has complied with: environmental obligations, through monthly interim payments, commencs from the Date of Commencement until the Contract Completion Date; iii 20% when all areas have been reinstated to their original condition. iv Any work instructed by the Engineer to be carried out under pay item G 118 shall be paid under the provisions of Clause 13.5 of the GCC 118.11.2 Basis of Payment a) The general requirements for Basis of Payment are described in the Bill of (BOQ); and b) The Lump Sum for General Environmental items not included elsewhere include, inter alia: i ad hoc monitoring because of complaints received from the agreed compl process or from the Engineer. Coordinating with the agreed complaints process ‘Communication with stakeholders Together with any other items that are not included elsewhere within Environmental Management Section; ©) The item for Preparation and submission of Contractor's Envir ‘Management and Monitoring Plan (CEMMP) shall include, inter alia: i Production of an approved plan; i Any licenses or other sundry expenses 4) The item for Operation and Management of the CEMMP shall include, inter alia: Administration of Environmental Management Impacts Management; iii Environmental Monitoring ¢) The item for Special Provisions shall include the items not listed separately {) The item for Environmental Guarantee Fund shall include: i Allnecessary commercial insurance, surety bond, trust fund, or a comt ‘thereof, in the amount to be specified by the DENR EMB and callable demand as required to meet the requirements of the Guarantee Fund; ii All administration and financing costs; ) The item for the Monthly Progress Report shall include: i All costs related to the production and distribution of the Monthly Ps Report Unless expressly covered under other discrete Pay Items, the item of “ Environmental Items” (G118.1) shall be deemed to include all implementation ‘operational requirements of the Contractor’s Environmental Management and Monit Plan including any mitigation requirements thereto. Bidding Documents Part IT — Requirements ‘Malolos — Clark Railway Project (Blumentritt Extension) Section 6 — Part 14 Package CP S-01: Viaduct Structure and I Station ‘Volume 1 ~The General Specification Pay Item Description Unit G118 (1) | General Environmental items not included elsewhere | Lump Sum ae Preparation and submission of Contractor's G118(2)__ | Environmental Management and Monitoring Plan Lump Sum (CEMMP), G118 (3) | Operation and Management of the CEMMP; Lump Sum G118 4) _| Historic PNR Station Protection Survey and Report Lump Sum Gite (3) _| Works instructed Tor protestion andlor remedial works to | Provisional (Old PNR Stations Sum G118(6) | Special Provisions Lump Sum G118 (7) | Environmental Guarantee Fund Payment Lamp Sum -— END OF SECTION 118 —

You might also like