Professional Documents
Culture Documents
Equipment
Equipment
equipment/Motor
SI.No. Equipment Name Grapics Work description
Hp/Ton/KW/
(Km/Hr)
2 Excavator(Backhoe)
3 Bulldozers
5 Graders(SDLG Volvo)
6 Loaders
7 Pavers
7.2 BC Paver
8 Compactors
Smooth wheeled
8.3 roller/Tandem Roller
9 Dump Trucks
12 Vehicles(Non construction)
13 Crane
14 Transit mixers
16 Boom placer
17 Generators
18 Water pumps
15 Vibrators
Needle vibrator
Fuel
Equipment Maintenance Operator Storage Equipment Operator consumpti Output of
Fuel cost
cost cost cost cost employed Employed Equipment
on
Cum/ Km/
Rs Rs Rs Rs Hr Hr Ltr/Hr Rs Hr Hr
10 8
10 8
10 8
10 8
10 8
10 8
10 8
10 8
10 8
10 8
10 8
10 8
10 8
10 8
10 8
10 8
10 8
10 8
10 8
10 8
10 8
10 8
Output of Tax Overheads Total cost
Equipment
Sqm/ % % Rs/Cum
Hr
Capacity
of Equipmen Maintena Operator Storage
equipmen t cost nce cost cost cost
Work t/Motor
Plant/Machiner Grapics
SI.No. descriptio
y Name n
Hp/Ton/K
W/ Rs Rs Rs Rs
(Km/Hr)
1 WMM Plant
2 Hot mix plant
Concrete batch
3 mix
4 Crusher
5
6
7
8
9
10
Equipmen Operator Fuel
t consumpti Fuel cost Output of Equipment Tax Overheads Total cost
employed Employed on