PRODUCED BY AN AUTODESK STUDENT VERSION
TUBE VENT
SOIL
15 100 15
30 30 15 100 100 100 15
46
PRODUCED BY AN AUTODESK STUDENT VERSION
7 7 7
R65
PRODUCED BY AN AUTODESK STUDENT VERSION
5
7
15 ABSORPTION
43 15 15
WELL 3% TUBE VENT
PEND. 3 % 65
75 OXIDATION
30
FERMENTATION CHAMBER 1
CHAMBER CONCRETE
FERMENTATION SLAB ENTRANCE EXIT
CHAMBER 57 100
IS 1500 cms. FERMENTATION OXIDATION
10 100 FERMENTATION 1
25
NAVY AREA AREA ABSORPTION
15
AREA
STAIRS WELL
100
CONCRETE IS 1000 CMS.
15 15
TO ALTER ACCORDING TO HEIGHT R50
SAND 30
GRAVEL 30
LOOSE GRAVEL 30
CATCH BASIN AND SEPTIC TANK DETAILS
SCALE 1:100 METERS
CIVIL ENGINEER PROJECT TITLE: OWNER:
PROPOSED 2-STOREY RESIDENTIAL
ENGR. CYRUS ROM P. RIVAS BUILDING
CYRUS CONSTRUCTION
MR. & MRS. RIVAS
DEVELOPMENT GROUP
PRC NO.: 20894 DATE: October 10, 2018
LOCATION:
Datu-Loho Subdivision, Maa, Davao DATE:
P-15
PRC NO.:
P.T.R. NO.: 5306772 TIN: 930-194-829
City P.T.R. NO.: TIN:
PRODUCED BY AN AUTODESK STUDENT VERSION