You are on page 1of 39

DESIGN AND CONSTRUCTION OF

HOUSING FACILITY FOR THE TRIPA DE


GALLINA SOLID WASTE PROCESSING
FACILITY

PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

00
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
Doña Julia Vargas Ave, Ortigas Center, Pasig City TRIPA DE GALLINA SOLID FRONT PAGE
WASTE PROCESSING FACILITY
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
DESIGN AND CONSTRUCTION OF HOUSING
FACILITY FOR THE TRIPA DE GALLINA SOLID
WASTE PROCESSING FACILITY

(ARCHITECTURAL PLAN)

PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

A-1
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
Doña Julia Vargas Ave, Ortigas Center, Pasig City TRIPA DE GALLINA SOLID TITLE PAGE
WASTE PROCESSING FACILITY
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
TABLE OF CONTENTS
OFFICE OF THE BUILDING OFFICIAL

SHEET NO. SHEET CONTENTS


00 FRONT PAGE
ARCHITECTURAL
A-1 TITLE PAGE
CITY/MUNICIPALITY
TABLE OF CONTENTS
EXTERIOR PERSPECTIVE
GROUND FLOOR INTERIOR LAND USE AND ZONING
A B C D E A-2 PERSPECTIVE

SECOND FLOOR INTERIOR


PERSPECTIVE
EXISTING FUEL TANKS
EXISTING RETAINING
WALL VICINITY MAP
GROUND FLOOR PLAN
A-3
SECOND FLOOR PLAN
18650
A-4 ROOF PLAN
ADDITIONAL RETAINING
WALL FRONT ELEVATION
A-5 REAR ELEVATION
3 LEFT ELEVATION

FIREWALL/ PROPERTY OF LRTA


CANOPY LINE
SCHEDULE OF DOORS
A-6
LINE AND GRADE

5209
SCHEDULE OF WINDOWS

4375
STAIR DETAILS BLOW UP PLAN
A-7 STAIR DETAILS SIDE ELEVATION
STAIR DETAILS REAR ELEVATION

10166

10166
2 STRUCTURAL
S-1 TITLE PAGE
S-2 GENERAL NOTES
1 EXTERIOR PERSPECTIVE

4958
4625
FOUNDATION PLAN
SCALE: NTS S-3
A-2 TIE BEAM DETAIL
FOOTING DETAIL
SECOND FRAMING PLAN
1
1077 4000 4000 4000 4000 1574
S-4 SLAB DETAIL ARCHITECTURAL
4220 18650 CONNECTION DETAIL
22870 ROOF FRAMING PLAN
FIREWALL/ PROPERTY OF LRTA S-5
CORRUGATED G.I ROOF
BUILDING LINE PAINTED FIN.
ELEVATION PLAN
ELEVATION PLAN
S-6
TRUSS DETAIL
ROOF FRAMING PLAN
S-7 SWAY BRACE DETAIL
SPOT DETAIL
4 SITE DEVELOPMENT PLAN S-8 CONCRETE PEDESTAL SCHEDULE

SCALE: NTS
A-2
ELECTRICAL
STRUCTURAL
E-1 TITLE PAGE
GENERAL NOTES
E-2 ELECTRICAL SYMBOLS
SITE DEVELOPMENT PLAN
GROUND FLOOR LIGHTING LAYOUT
E-3
SECOND FLOOR LIGHTING LAYOUT
GROUND FLOOR POWER LAYOUT
E-4
SECOND FLOOR POWER LAYOUT
GROUND FLOOR EQUIPMENT LAYOUT
E-5
SECOND FLOOR EQUIPMENT LAYOUT
GROUND FLOOR EMERGENCY PLUMBING
2 GROUND FLOOR INTERIOR PERSPECTIVE E-6
LIGHTING LAYOUT

SECOND FLOOR EMERGENCY


SCALE: NTS
A-2 LIGHTING LAYOUT

GROUND FLOOR EQUIPMENT


GROUNDING LAYOUT
E-7
SECOND FLOOR EQUIPMENT

THIS SITE E-8


E-9
GROUNDING LAYOUT
PANEL BOARD LOCATIONS
ELECTRICAL LOAD SCHEDULE
E-10 ELECTRICAL MISCELLANEOUS DETAIL
E-11 ELECTRICAL SINGLE LINE DIAGRAM
PLUMBING
ELECTRICAL
P-1 TITLE PAGE
P-2 WATER LINE LAYOUT
P-3 SEWER & STORM DRAIN LAYOUT
P-4 ISOMETRIC VIEW
P-5 PLUMBING DETAILS
MECHANICAL
M-1 TITLE PAGE
GROUND FLOOR FIRE PROTECTION
LAYOUT
M-2
SECOND FLOOR FIRE PROTECTION
LAYOUT MECHANICAL
GENERAL NOTES
M-3 FLOOR CONTROL VALVE DETAIL
ALARM CHECK VALVE ASSEMBLY
M-4 FIRE PROTECTION DETAILS
M-5 FIRE PROTECTION DETAILS

3 SECOND FLOOR INTERIOR PERSPECTIVE 5 VICINITY MAP LEGEND


FIRE PROTECTION SCHEMATIC
SCALE: NTS SCALE: NTS M-6
A-2 A-2 DIAGRAM
BLOW UP DETAIL
M-7 FIRE WATER TANK

PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:
TABLE OF CONTENTS
EXTERIOR PERSPECTIVE
METROPOLITAN MANILA DESIGN AND CONSTRUCTION
GROUND FLOOR INTERIOR

A-2
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
TRIPA DE GALLINA SOLID PERSPECTIVE
Doña Julia Vargas Ave, Ortigas Center, Pasig City
WASTE PROCESSING FACILITY SECOND FLOOR INTERIOR
WAY MAKER OPC PERSPECTIVE
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
SITE DEVELOPMENT PLAN
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION: VICINITY MAP
1 2 3
1 2 3 FIREWALL/ PROPERTY OF LRTA
5000 137 4375 4625

FIREWALL/ PROPERTY OF LRTA ADDITIONAL RETAINING WALL


DN

11 21

A
10 12 13 14 15 16 17 18 19 20

ADDITIONAL RETAINING
WALL
D-2 D-4

1300
UP W-2
A 1 2 3 4 5 6 7 8 9

900

4000
STORAGE/
D-3 D-4

1570
UTILITY
ROOM D-5

4000
4500

W-2 1200

D-2 DESK

B D-6
OFFICE
EXISTING FUEL TANKS PALLET
W-3
B BOX 1 PALLET

FIREWALL/ PROPERTY OF LRTA


4000
EXISTING FUEL TANKS
PALLET

FIREWALL/ PROPERTY OF LRTA


BOX 1 GARBASGE STORAGE/
BIN UTILITY ROOM

4000
W-5 D-2

BIOTECH TERRA
BOX 3
C OPEN
BELOW

16000
C SORTING TABLE

4000
BIOTECH TERRA
W-1
BOX 2

MULTI-PURPOSE
11000

SHREDDER
4000
W-5

BIOTECH TERRA
BOX 1
DRAINAGE
D
CONTAINERS

BIO-WASTE CONVERTER

4000
W-1

DECORTICATOR
EQUIPMENT STORAGE
WEIGHING

4000

W-4
SCALE

W-5

EXISTING RETAINING
WALL
WASTE BINS
WASH BIN
W/ FAUCET D1
E ROLL UP
EXISTING RETAINING WALL
DRYING DRYING
DRUM DRUM

ADDITIONAL RETAINING
ADDITIONAL RETAINING PORCH
WALL 4375 4625

WALL
4791

4375 4625

1 GROUND FLOOR PLAN 2 SECOND FLOOR PLAN


SCALE: 1 : 70 SCALE: 1 : 70
A-3 A-3
PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

A-3
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
TRIPA DE GALLINA SOLID GROUND FLOOR PLAN
Doña Julia Vargas Ave, Ortigas Center, Pasig City
WASTE PROCESSING FACILITY SECOND FLOOR PLAN
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
1 2 3
10190
FIREWALL/ PROPERTY OF LRTA

1574
A

4000
B

4000
18650

18649
C FIREWALL/
PROPERTY OF LRTA

22865
4000
EXISTING FUEL TANKS

D
BUILDING LINE

4000
E

1075
CORRUGATED G.I ROOF
PAINTED FIN.

4216
CANOPY LINE

4375 4625
5209 4958
10166

1 ROOF PLAN
SCALE: 1 : 70
A-4
PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

A-4
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
Doña Julia Vargas Ave, Ortigas Center, Pasig City TRIPA DE GALLINA SOLID ROOF PLAN
WASTE PROCESSING FACILITY
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
1 2 3 3 2 1
4377 4625 4625 4377
TOP OF FIREWALL &
ROOF APEX TOP OF FIREWALL &
G.I ROOF APEX

2154

2154
TOP OF
ROOF BEAM TOP OF
3000 W-4 ROOF BEAM

3000
D-4
9154

9154
SECOND FLOOR LINE
SECOND FLOOR LINE
BOTTOM OF
EXHAUST FAN BOTTOM OF
EXHAUST FAN
4000

4000
3090

D-1

3090
EXISTING FUEL TANKS

D-4
GFL 4502 FUEL TANK RETAINING WALL
NGL

1 FRONT ELEVATION 2 REAR ELEVATION


SCALE: 1 : 60 SCALE: 1 : 60
A-5 A-5

A B C D E
4000 4000 4000 4000
TOP OF FIREWALL &
ROOF APEX
2154

TOP OF
ROOF BEAM
W-3

D-5
3000

W-2
9154

W-1 W-1
SECOND FLOOR LINE

BOTTOM OF
EXHAUST FAN
4000

W-2
3090

W-5 W-5 W-5

3 LEFT ELEVATION
SCALE: 1 : 60
A-5
PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

A-5
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE FRONT ELEVATION
Doña Julia Vargas Ave, Ortigas Center, Pasig City TRIPA DE GALLINA SOLID REAR ELEVATION
WASTE PROCESSING FACILITY LEFT ELEVATION
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
MARK ILLUSTRATION DESCRIPTION QTY LOCATION MARK ILLUSTRATION DESCRIPTION QTY LOCATION
2400
150 2100 150

1000 1000
ALUMINUM SLIDING

300
WINDOW W/

1000
1/4" THK. TINTED
W-1 GLASS PANEL 2 SETS FACILITY ROOM
ROLL UP DOOR

2100
3490
3190
D-1 1 SET FACILITY ROOM (ANALOK FINISH)

1100
F.F.L.
G.F.L.

600 PVC PANEL DOOR 400

W/ LOUVER AT THE ALUMINUM AWNING

400
BOTTOM WINDOW W/
D-2
112 PAIRS OF 2 SETS TOILET W-2 1/4" THK. TINTED
L.P.B. HINGES, 2 SETS TOILET
2100

2100
PROVIDE LOCKSET BY GLASS PANEL

1700
YALE (ANALOK FINISH)
G.F.L.

F.F.L.
800
WOODEN PANEL
DOOR 2''X4'' STEEL
DOOR JAMB,
1 SET
STORAGE/UTILITY 940 940
ALUMINUM SLIDING
D-3 112 PAIRS OF ROOM WINDOW W/
2100

L.P.B. HINGES,
1/4" THK. TINTED

1000
PROVIDE LOCKSET BY
W-3 1 SET OFFICE
G.F.L. YALE GLASS PANEL

2100
(ANALOK FINISH)

1100
1000 F.F.L.

STEEL DOOR
D-4 2 SETS FACILITY ROOM
ON 2''X5'' STEEL
2100

DOOR JAMB
1000 1000 1000
ALUMINUM SLIDING
WINDOW W/

1000
1/4" THK. TINTED 1 SET
W-4 GLASS PANEL FACILITY ROOM

2100
1520

760 760
WOODEN PANEL (ANALOK FINISH)
DOOR 2''X4'' STEEL

1100
DOOR JAMB,
MAID'S G.F.L.
112 PAIRS OF 2 SETS
ROOM,OFFICE
D-5 L.P.B. HINGES,
2100

PROVIDE LOCKSET BY 2000


YALE 200 200 200 200 200
G.F.L.
200 200 200 200 200

600
W-5 WHAT TYPE OF
3 SETS FACILITY ROOM

2500
WINDOW?

1900
D-6

F.F.L. F.F.L.

1 SCHEDULE OF DOORS 2 SCHEDULE OF WINDOWS


SCALE: NTS SCALE: NTS
A-6 A-6
PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

A-6
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
TRIPA DE GALLINA SOLID SCHEDULE OF DOORS
Doña Julia Vargas Ave, Ortigas Center, Pasig City
WASTE PROCESSING FACILITY SCHEDULE OF WINDOWS
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
1

2 UP

SECOND FLOOR LINE SECOND FLOOR LINE

21
22
21 20

10 19
20
18
19
11
BOTTOM OF EXHAUST FAN BOTTOM OF EXHAUST FAN 17
18
12 17 16

16 15
13 14
15
14 13
14
13 12
15 11
12
10
16 11
9
10
17 8
9 STEEL STAIR
PAINTED FIN. 7
18 8
6
7
19 5
6
4
20 5
3
4
21 2
3
1
22 2
1
FINISHED FLOOR LINE FINISHED FLOOR LINE

STEEL STAIR
PAINTED FIN.

2 STAIR DETAILS SIDE ELEVATION 3 STAIR DETAILS REAR ELEVATION


SCALE: 1 : 20
A-7 SCALE: 1 : 20 A-7

1 STAIR DETAILS BLOW UP PLAN


SCALE: 1 : 20
A-7

PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

STAIR DETAILS BLOW UP


METROPOLITAN MANILA DESIGN AND CONSTRUCTION PLAN

A-7
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
TRIPA DE GALLINA SOLID STAIR DETAILS SIDE
Doña Julia Vargas Ave, Ortigas Center, Pasig City
S-1

WASTE PROCESSING FACILITY ELEVATION


WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT, STAIR DETAILS REAR
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
DATE: DATE: LOCATION:
ELEVATION
792 F. Manalo St., Bambang, Pasig City
DESIGN AND CONSTRUCTION OF HOUSING
FACILITY FOR THE TRIPA DE GALLINA SOLID
WASTE PROCESSING FACILITY

(STRUCTURAL PLAN)

PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

S-1
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
Doña Julia Vargas Ave, Ortigas Center, Pasig City TRIPA DE GALLINA SOLID FRONT PAGE
WASTE PROCESSING FACILITY
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
20 mm LESS THAN Ø12 @ 300
WIDTH OF FLANGE SHEAR BARS BENT CAST IN PLACE CONCRETE
BEAM 1 ALTERNATELY
2146

1073

SLAB 1
BEAM 2

12 mm PLATE 40 40

METAL DECKING

BUTT WELD

STEEL BEAM
BEAM SPLICE DETAIL

FOR ISOLATED FOUNDATION SOIL


BEARING CAPACITY BASED ON
GEOTECHNICAL REPORT. PLEASED STEEL BEAM TO SLAB
RECHECK FOUNDATION DESIGN OR CONNECTION DETAIL
PROVIDED CALCULATION REPORT.

28-DAY CYLINDER STRENGTH MAX. SIZE OF


STRUCTURAL CLASS COARSE AGGREGATE
MEMBER PSI MPa mm (in.)

FOOTINGS AA 4000 27.60 20

PEDESTALS AA 4000 27.60 20

SLABS AA 4000 27.60 20

FILLET WELD TABLE 45°


SCALLOP
NOTCH R

35
WELD SIZE, S SCALLOP SIZE WELD ALL AROUND
PLATE THICKNESS (MM) (MM)

35
(MM)
T JOINTS LAP JOINTS RADIUS R 26

BELOW - 6 S=t S=t 25


6-8 6 4 25 45°

WELD ALL AROUND


9 - 11 6 6 25

35
35
45°

35
12 - 15 9 9 35
26
15 - 18 9 9 35
TYP. CHAMBERING
19 - ABOVE 12 12 35 t=t1 OR 12, WHICHEVER IS THINNER and COMPLETE PENETRATION WELD SET

NOTE: UNLESS OTHERWISE SPECIFIED, SIZE OF FILLET WELDS SHALL NOT EXCEED THE THICKNESS OF THE THINNER MATERIAL BEING JOINT
TABLE OF LAP SPLICE & ANCHORAGE LENGTH MAX. SIZE AGGREGATE

STANDARD HOOK (m) LAP SPLICE (m) UNIT MAX. LAP SPLICE LENGTH OF COL.
BAR DIAMETER ANCHORAGE
TENSION BAR COMP. BAR WEIGHT REINF. NOMINAL BARS
(mm) LENGTH (mm)
90 DEG. 180 DEG. 136 DEG. TOP BOT TOP BOT (KG./m.) W/ TIES W/ SPIRAL
VERIFY
10 0.60 0.15 0.13 0.10 0.42 0.30 0.42 0.30 0.017 0.30 0.30

12 0.60 0.20 0.15 0.12 0.42 0.30 0.42 0.30 0.30 0.30

16 0.60 0.25 0.15 0.14 0.73 0.52 0.87 0.62 0.52 0.47

20 0.60 0.30 0.20 0.20 0.91 0.65 1.10 0.75 0.52 0.47
UPPER COLUMN
25 0.65 0.40 0.28 0.25 1.15 0.82 1.40 1.00
1073
28 0.68 0.46 0.38 1.45 1.05 1.53 1.00

32 1.12 0.58 0.43 1.80 1.25 1.74 1.24

36 1.43 0.61 0.48 2.40 1.70 2.00 1.40


12 mm PLATE
BUTT WELD
2146

20 mm LESS THAN
WIDTH OF FLANGE

LOWER COLUMN

COLUMN SPLICE DETAIL

PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

S-2
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
Doña Julia Vargas Ave, Ortigas Center, Pasig City TRIPA DE GALLINA SOLID GENERAL NOTES
WASTE PROCESSING FACILITY
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
A B C D
380 3620 380 3620 380 3620 380
A
TOP BAR

2-#10EF
4000

BOT BAR 3-#10 2-#10 3-#10 2-#10


910 910 910
42-2L-#10 42-2L-#10 42-2L-#10
@90 C/C @90 C/C @90 C/C
B for b1 beams check the Asmin required for
B5:250x250 beams as per NSCP 2015(see 409.6), if
not change 2-#10 to 3#12
B6:250x250 B7:250x250
P2 P3 P4 P5
4000

b
b b b
MINIMUM VALUE OF:
2-#10
2-#10 3-#10 3-#10 STP 2L-#10
STP 2L-#10 STP 2L-#10 STP 2L-#10

h
SFR 2-#10EF
2-#10 2-#10 3-#10 2-#10

C B1 B2 B3 B4

TYPICAL TIE BEAM DETAILS


4000

NATURAL GRADE LINE

Y-BARS Y- BARS
D
LESS THAN MINIMUM
4000

X- BARS

LD
REQUIRED WHICH IS
NOT APPLICABLE AS

COLUMN LINKS
DELETE
PER CODE

D
W
E
X- BARS
4375 4625
X- BARS

2 3

t
1

50
Y-BARS 50MM THK PCC

FOUNDATION PLAN
L

1 L

CL
SCALE: 1:65 TYPICAL FOOTING DETAIL 50
S-3 SECTION
PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

S-3
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE FOUNDATION PLAN
Doña Julia Vargas Ave, Ortigas Center, Pasig City TRIPA DE GALLINA SOLID TIE BEAM DETAIL
WASTE PROCESSING FACILITY FOOTING DETAIL
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
CHECK IF IT IS ONE WAY OR TWO
WAY SLAB? REINFORCEMENTS OF SLAB
PARALLEL TO SHORT SPAN PARALLEL TO LONG SPAN

MARK THICKNESS TOP BARS @ SUPPORT BOTTOM BARS @ MIDSPAN TOP BARS @ SUPPORT BOTTOM BARS @ MIDSPAN REMARKS
A S1
CONTINUOUS DISCONTINUOUS CONTINUOUS DISCONTINUOUS CONTINUOUS DISCONTINUOUS CONTINUOUS DISCONTINUOUS
S1
TWO WAY
SECOND FLOOR SLAB
S-1 100 Ø10 @ 300 Ø10 @ 300 Ø10 @ 200 Ø10 @ 200 ONE-WAY

4000
2313 MIDSPAN/ COLUMN STRIP
TOP BARS LONG DIRECTION
L/4 L/4
4/2.313=1.72 WHICH IS
LESS THAN TO TWO

B S1
S1

4000

D
STEEL DECK

2313 B L/6
BOTTOM BARS SHORT DIR,
MIDSPAN/ COLUMN STRIP
TOP BARS LONG DIRECTION
L/4 L/4

C S1
S1
4000

STEEL DECK
2313
BOTTOM BARS SHORT DIR,

D S1
S1

TYPICAL STEEL DECK SLAB SECTION DETAIL


4000

TOP VIEW

Lateral view Front view


2313 STEEL_GR50
W12X120

BEAM-COLUMN WEB
Top view Anchor detailing CONNECTION DETAILS
E 50
5/16
430 5/16 5
8''

53.24

111.44
LATERAL VIEW FRONT VIEW

453.24
450

430

400
4375 4625 5/8"

5/16
HOLE TYPE (BEAM): STANDARD (STD)
40 5/16 HOLE TYPE (CONNECTOR): STANDARD (STD)
450 4 BOLTS: 58" A325 N

1 2 3

91

91
A36

40
PL 430x430x18

18

155

75
BASE PLATE DETAILS
2 SECOND FLOOR FRAMING PLAN STEEL_GR50
W12X120
165
STEEL_GR50
W10X54
A36
PL 12X165X155
12

SCALE: 1:65
S-4 TOP VIEW TOP VIEW

SCHEDULE OF SECTIONS 40
BEAM-COLUMN
CONNECTION DETAILS BEAM-COLUMN
CONNECTION DETAILS
LATERAL VIEW
FRONT VIEW
50

FRONT VIEW
4/16
40 4/16
HOLE TYPE (BEAM): STANDARD (STD)
LATERAL VIEW
HOLE TYPE (CONNECTOR): STANDARD (STD)
2 BOLTS: 34" A325 N 135 3/16
HOLE TYPE (BEAM): STANDARD (STD)

73

73
3/16

35
40 HOLE TYPE (CONNECTOR): STANDARD (STD)
2 BOLTS: 34" A325 N

30
180

110

88

88
45
170

80
STEEL_GR50
80 W10X54 10
A36 STEEL_GR50 STEEL_GR50
PL 10X80X180 W10X54
90 W10X54 6
STEEL_GR50 A36
W12X120
PL 6X90X170

PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

S-4
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE SECOND FRAMING PLAN
Doña Julia Vargas Ave, Ortigas Center, Pasig City TRIPA DE GALLINA SOLID SLAB DETAIL
WASTE PROCESSING FACILITY CONNECTION DETAIL
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
A
3 2 1

4000
4625 4375

B
TOP OF

4000
ROOF BEAM

3000

3000
4000

SECOND FLOOR LINE


D
4000

4000
E

NGL

4375 4625

1 2 3

3 ROOF FRAMING PLAN 4 ELEVATION ON GRID A


SCALE: 1:80 SCALE: 1:40
S-5 S-5

SCHEDULE OF SECTIONS SCHEDULE OF SECTIONS

PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

S-5
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
TRIPA DE GALLINA SOLID ROOF FRAMING PLAN
Doña Julia Vargas Ave, Ortigas Center, Pasig City
WASTE PROCESSING FACILITY ELEVATION PLAN
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
3 2 1
PLEASE PROVIDE CONNECTION
DETAILS FOR BRACING TO STEEL
4625 4375
BEAM AND BRACING TO STEEL
COLUMN

E D C B A
4000 4000 4000 4000
925 925 925 925 925 875 875 875 875 875

TOP OF
ROOF BEAM
3000

3000

3000

3000

3000
2000
SECOND FLOOR LINE
4000

6 TRUSS DETAILS
SCALE: 1:30
S-6
NGL

SCHEDULE OF SECTIONS

5 ELEVATION ON GRID 2
SCALE: 1:60
S-6

SCHEDULE OF SECTIONS

PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

S-6
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE ELEVATION PLAN
Doña Julia Vargas Ave, Ortigas Center, Pasig City TRIPA DE GALLINA SOLID TRUSS DETAIL
WASTE PROCESSING FACILITY SPOT DETAIL
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
A

4000

B
4000

C
4000

D
4000

4375 4625

1 2 3

3 ROOF FRAMING PLAN


SCALE: 1:65
S-5
PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

S-7
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE ROOF FRAMING PLAN
Doña Julia Vargas Ave, Ortigas Center, Pasig City TRIPA DE GALLINA SOLID SWAY BRACE DETAIL
WASTE PROCESSING FACILITY SPOT DETAIL
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
PEDESTAL ELEV. MARK P1 P2 P3 P4 P5

C30 : Fy275.8 , COVER = 50mm C30 : Fy275.8 , COVER = 50mm C30 : Fy414 , COVER = 50mm C30 : Fy275.8 , COVER = 50mm C30 : Fy414 , COVER = 50mm
CONFINING ZONE = 450 MM CONFINING ZONE = 450 MM CONFINING ZONE = 450 MM CONFINING ZONE = 450 MM CONFINING ZONE = 450 MM

0.3 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO
#10 @ 125 --- #10 @ 125 #10 @ 125 #10 @ 125 #10 @ 175 #10 @ 125 #10 @ 125 #10 @ 175 #10 @ 125 #10 @ 125 #10 @ 175 #10 @ 125 #10 @ 125 #10 @ 175

PLEASE
CONFIRMED IF
THE HEIGHT OF 2.2 M
THE PEDESTAL
IS UP TO 3M?

380

380

380

380
#20 #20
250

IF NOT TRY TO
USED FROM #16 #16 #16 #16 #16
FOUNDATION TO
XX HEGHT OF 250 380 380 380 380
THE PEDESTAL
4-#16 8-#16 4-#20 + 4-#16 8-#16 4-#20 + 4-#16
C30 : Fy275.8 , COVER = 50mm C30 : Fy275.8 , COVER = 50mm C30 : Fy414 , COVER = 50mm C30 : Fy414 , COVER = 50mm C30 : Fy275.8 , COVER = 50mm
CONFINING ZONE = FULL HEIGHT CONFINING ZONE = FULL HEIGHT CONFINING ZONE = FULL HEIGHT CONFINING ZONE = FULL HEIGHT CONFINING ZONE = FULL HEIGHT

2.2 M

Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS
TO
#10 @ 125 --- --- #10 @ 125 #10 @ 125 --- #13 @ 150 #13 @ 150 --- #13 @ 150 #13 @ 150 --- #10 @ 125 #10 @ 125 ---

3.0 M
380

380

380

380
250

#16 #16 #20 #20 #16


250 380 380 380 380

4-#16 8-#16 8-#20 8-#20 8-#16

COLUMN PEDESTAL SCHEDULE


(SCALE 1:25)
NOTES:
1. BE = BOUNDARY ELEMENT AS PER ACI 318M - 11. PROVIDE CONFINING REINFORCEMENT ACROSS ENTIRE HEIGHT OF WALL IN THE BOUNDARY ELEMENT
2. Z1 = SPECIAL CONFINING ZONE AS PER ACI 318M - 11, Z2 = REMAINING ZONES AS PER ACI 318M - 11

PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

S-8
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
TRIPA DE GALLINA SOLID CONCRETE PEDESTAL
Doña Julia Vargas Ave, Ortigas Center, Pasig City
WASTE PROCESSING FACILITY SCHEDULE
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
DESIGN AND CONSTRUCTION OF HOUSING
FACILITY FOR THE TRIPA DE GALLINA SOLID
WASTE PROCESSING FACILITY

(ELECTRICAL PLAN)

PREPARED BY: RECOMMENDING APPROVAL APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

E-1
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
Doña Julia Vargas Ave, Ortigas Center, Pasig City TRIPA DE GALLINA SOLID TITLE PAGE
WASTE PROCESSING FACILITY
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
GENERAL NOTES 1 2 3

FIREWALL/ PROPERTY OF LRTA

MDP
B

FIREWALL/ PROPERTY OF LRTA


C

ELECTRICAL SYMBOLS
M
3Sabi

ECB-5 2Sab

Sa

SERVICE ENTRANCE
GB
230V, 60Hz, 3PH, 3W+G

1 SITE DEVELOPMENT PLAN


SCALE: 1 : 75
E-2
PREPARED BY: RECOMMENDING APPROVAL APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

E-2
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE GENERAL NOTES
Doña Julia Vargas Ave, Ortigas Center, Pasig City TRIPA DE GALLINA SOLID ELECTRICAL SYMBOLS
WASTE PROCESSING FACILITY SITE DEVELOPMENT PLAN
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
1 2 3 1 2 3

FIREWALL/ PROPERTY OF LRTA FIREWALL/ PROPERTY OF LRTA

i
3Sabi
A A

y
2gh
f
Sf

a
Sy
g
Se

y
e

b
Sd
d
B B

a
FIREWALL/ PROPERTY OF LRTA

FIREWALL/ PROPERTY OF LRTA


Sc
c

b
h
C C

a
b

b
D D

h
g

a
E E

h
1 GROUND FLOOR LIGHTING LAYOUT 2 SECOND FLOOR LIGHTING LAYOUT
SCALE: 1 : 70 SCALE: 1 : 70
E-3 E-3
PREPARED BY: RECOMMENDING APPROVAL APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION


GROUND FLOOR LIGHTING

E-3
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
TRIPA DE GALLINA SOLID LAYOUT
Doña Julia Vargas Ave, Ortigas Center, Pasig City
WASTE PROCESSING FACILITY SECOND FLOOR LIGHTING
WAY MAKER OPC LAYOUT
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
1 2 3 1 2 3

FIREWALL/ PROPERTY OF LRTA FIREWALL/ PROPERTY OF LRTA

A A

B B

FIREWALL/ PROPERTY OF LRTA


FIREWALL/ PROPERTY OF LRTA
C C

D D

E E

1 GROUND FLOOR POWER LAYOUT 2 SECOND FLOOR POWER LAYOUT


SCALE: 1 : 70 SCALE: 1 : 70
E-4 E-4
PREPARED BY: RECOMMENDING APPROVAL APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION


GROUND FLOOR POWER

E-4
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
TRIPA DE GALLINA SOLID LAYOUT
Doña Julia Vargas Ave, Ortigas Center, Pasig City
WASTE PROCESSING FACILITY SECOND FLOOR POWER
WAY MAKER OPC LAYOUT
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
1 2 3 1 2 3

FIREWALL/ PROPERTY OF LRTA FIREWALL/ PROPERTY OF LRTA

A A

ECB-6
B B

ECB-BTB-3

FIREWALL/ PROPERTY OF LRTA


FIREWALL/ PROPERTY OF LRTA
ECB-3
C C

ECB-BTB-2

ECB-7
ECB-5
D ECB-2 D

ECB-6
1HP
ECB-BTB-1

ECB-4
ECB-1

ECB-7
E E

ECB-6
10HP

5HP
1 GROUND FLOOR EQUIPMENT LAYOUT 2 SECOND FLOOR EQUIPMENT LAYOUT
SCALE: 1 : 70 SCALE: 1 : 70
E-5 E-5
PREPARED BY: RECOMMENDING APPROVAL APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION


GROUND FLOOR EQUIPMENT

E-5
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
TRIPA DE GALLINA SOLID LAYOUT
Doña Julia Vargas Ave, Ortigas Center, Pasig City
WASTE PROCESSING FACILITY SECOND FLOOR EQUIPMENT
WAY MAKER OPC LAYOUT
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
1 2 3 1 2 3

FIREWALL/ PROPERTY OF LRTA FIREWALL/ PROPERTY OF LRTA

A EXIT A EXIT

B B

FIREWALL/ PROPERTY OF LRTA


FIREWALL/ PROPERTY OF LRTA
C C

D D

E E

1 GROUND FLOOR EMERGENCY LIGHTING LAYOUT 2 SECOND FLOOR EMERGENCY LIGHTING LAYOUT
SCALE: 1 : 70 SCALE: 1 : 70
E-6 E-6

PREPARED BY: RECOMMENDING APPROVAL APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

GROUND FLOOR
METROPOLITAN MANILA DESIGN AND CONSTRUCTION
EMERGENCY LIGHTING

E-6
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
TRIPA DE GALLINA SOLID LAYOUT
Doña Julia Vargas Ave, Ortigas Center, Pasig City
WASTE PROCESSING FACILITY SECOND FLOOR
WAY MAKER OPC EMERGENCY LIGHTING
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
LAYOUT
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
1 2 3 1 2 3

FIREWALL/ PROPERTY OF LRTA FIREWALL/ PROPERTY OF LRTA

A A

GB
B B

FIREWALL/ PROPERTY OF LRTA

FIREWALL/ PROPERTY OF LRTA


C C

D D

E E

1 GROUND FLOOR EQUIPMENT GROUNDING LAYOUT 2 SECOND FLOOR EQUIPMENT GROUNDING LAYOUT
SCALE: 1 : 70 SCALE: 1 : 70
E-7 E-7

PREPARED BY: RECOMMENDING APPROVAL APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION


GROUND FLOOR EQUIPMENT

E-7
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
TRIPA DE GALLINA SOLID GROUNDING LAYOUT
Doña Julia Vargas Ave, Ortigas Center, Pasig City
WASTE PROCESSING FACILITY SECOND FLOOR EQUIPMENT
WAY MAKER OPC GROUNDING LAYOUT
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
1 2 3

FIREWALL/ PROPERTY OF LRTA

FIREWALL/ PROPERTY OF LRTA


C

1 PANEL BOARD LOCATIONS


SCALE: 1 : 70
E-8
PREPARED BY: RECOMMENDING APPROVAL APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

E-8
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
Doña Julia Vargas Ave, Ortigas Center, Pasig City TRIPA DE GALLINA SOLID PANEL BOARD LOCATIONS
WASTE PROCESSING FACILITY
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
1 ELECTRICAL LOAD SCHEDULE
SCALE: NTS
E-9
PREPARED BY: RECOMMENDING APPROVAL APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

E-9
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
TRIPA DE GALLINA SOLID ELECTRICAL LOAD
Doña Julia Vargas Ave, Ortigas Center, Pasig City
WASTE PROCESSING FACILITY SCHEDULE
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
GRAVEL FILLING

EQUIPMENT ECB MOUNTING DETAILS

NON COMBUSTIBLE

NOTE : MORE THAN


THREE (3) PLATES ON
SWITCHES MUST
ARRANGE IN
ECB-NEMA 3R
ROWS/LAYER.

BOLTED BASE

DUPLEX (FOR SPLIT PACKAGE A/C)

TO EQUIPMENT

1 ELECTRICAL MISCELLANEOUS DETAIL


SCALE: NTS
E-10
PREPARED BY: RECOMMENDING APPROVAL APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION


OF HOUSING FACILITY FOR THE
DEVELOPMENT AUTHORITY
Doña Julia Vargas Ave, Ortigas Center, Pasig City

WAY MAKER OPC


CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
TRIPA DE GALLINA SOLID
WASTE PROCESSING FACILITY
ELECTRICAL
MISCELLANEOUS DETAIL E-10
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
1 ELECTRICAL SINGLE LINE DIAGRAM
SCALE: NTS
E-11
PREPARED BY: RECOMMENDING APPROVAL APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION


OF HOUSING FACILITY FOR THE

E-11
DEVELOPMENT AUTHORITY ELECTRICAL SINGLE LINE
Doña Julia Vargas Ave, Ortigas Center, Pasig City TRIPA DE GALLINA SOLID
WASTE PROCESSING FACILITY DIAGRAM
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
DESIGN AND CONSTRUCTION OF HOUSING
FACILITY FOR THE TRIPA DE GALLINA SOLID
WASTE PROCESSING FACILITY

(PLUMBING PLAN)

PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

P-1
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
Doña Julia Vargas Ave, Ortigas Center, Pasig City TRIPA DE GALLINA SOLID FRONT PAGE
WASTE PROCESSING FACILITY
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
1 2 3 1 2 3
4375 4625 4375 4625

RELOCATE TO
FIREWALL/ PROPERTY OF LRTA FIREWALL/ PROPERTY OF LRTA

ADDITIONAL RETAINING FROMWATERSOURCE ADDITIONAL RETAINING


WALL TAPTOTHENEAREST WALL
WATERSOURCE

UP

UP

UP

UP
11

11
20

20
10

12

13

14

15

16

17

18

19

10

12

13

14

15

16

17

18

19
1

1
2

6
3

9
A A

STORAGE/
299.54562

UTILITY
ROOM

1300
900
4000

4000

1570
DESK
1200

PALLET
BOX 1

PALLET
B B

OFFICE
EXISTING FUEL TANKS

PALLET

GARBASGE
BOX 1
EXISTING FUEL TANKS

FIREWALL/ PROPERTY OF LRTA

FIREWALL/ PROPERTY OF LRTA


BIN
4000

4000
BIOTECH TERRA

UTILITY ROOM
STORAGE/
BOX 3

SORTING TABLE

BELOW
OPEN
C C

BIOTECH TERRA
BOX 2
4000

4000
BIOTECH TERRA
BOX 1

MULTI-PURPOSE
CONTAINERS

SHREDDER
D D
EQUIPMENT STORAGE

BIO-WASTE CONVERTER
WEIGHING
SCALE
4000

4000

DECORTICATOR
WASTE BINS
W/ FAUCET
WASH BIN

E EXISTING RETAINING ROLL UP E EXISTING RETAINING


WALL WALL
DRYING
DRUM

ADDITIONAL RETAINING ADDITIONAL RETAINING


WALL WALL

PORCH

AVAILABLE WATER
SOURCE TAPPING
POINT GOING
SOUTH., ADD
GATE VALVE AND
METER ASSEMBLY.

1 GROUND FLOOR WATER LINE LAYOUT 2 SECOND FLOOR WATER LINE LAYOUT
P-2 SCALE: 1 : 70 P-2 SCALE: 1 : 70

PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

P-2
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
TRIPA DE GALLINA SOLID
WATER LINE
Doña Julia Vargas Ave, Ortigas Center, Pasig City

WAY MAKER OPC


WASTE PROCESSING FACILITY LAYOUT
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
1 2 3 1 2 3
4375 4625 4375 4625

FIREWALL/ PROPERTY OF LRTA FIREWALL/ PROPERTY OF LRTA

ADDITIONAL RETAINING 4"ØPVCPPIE ADDITIONAL RETAINING


WALL TAPTONEARESTSTORM WALL

ST
DRANILNI E

UP

UP

UP

UP
11

11
20

20
10

12

13

14

15

16

17

18

19

10

12

13

14

15

16

17

18

19
1

1
2

6
3

9
A A

CB

STORAGE/
299.54562

UTILITY
ROOM
ADD REQUIRED

1300
FLOOR DRAIN AND
PROVIDE GREASE
OIL TRAP AS PER 900
4000

4000
BASIS OF DESIGN

1570
REPORT.

DESK
FCO
GT
1200

PALLET
BOX 1

PALLET
B B

CB

OFFICE
EXISTING FUEL TANKS EXISTING FUEL TANKS

PALLET

GARBASGE
BOX 1
FLOOR

FIREWALL/ PROPERTY OF LRTA

FIREWALL/ PROPERTY OF LRTA


BIN
DRAIN
4000

4000
BIOTECH TERRA

UTILITY ROOM
STORAGE/
BOX 3

SORTING TABLE

BELOW
OPEN
C C
CB

BIOTECH TERRA
BOX 2
4000

4000
BIOTECH TERRA
BOX 1

MULTI-PURPOSE
CONTAINERS

SHREDDER
D D
CB

FLOOR
DRAIN
EQUIPMENT STORAGE

BIO-WASTE CONVERTER
WEIGHING
SCALE
4000

4000

DECORTICATOR
WASTE BINS
W/ FAUCET
WASH BIN

E E
CB

EXISTING RETAINING ROLL UP EXISTING RETAINING


WALL WALL
DRYING
DRYING

DRUM
DRUM

ADDITIONAL RETAINING ADDITIONAL RETAINING


WALL WALL

SEWER AND STORM PREFERABLY


PORCH

ON SEPARATE SHEET, AS THIS IS


SEPARATE LINE REFER TO BASIS
OF DESIGN REPORT.

1 GROUND FLOOR SEWER & STORM DRAIN LAYOUT 2 SECOND FLOOR SEWER & STORM DRAIN LAYOUT
P-3 SCALE: 1 : 70 P-3 SCALE: 1 : 70

PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

P-3
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
TRIPA DE GALLINA SOLID
SEWER & STORM
Doña Julia Vargas Ave, Ortigas Center, Pasig City

WAY MAKER OPC


WASTE PROCESSING FACILITY DRAIN LAYOUT
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
AD
DI
TI
A ON
AL
RE
WATAIN
LL IN
G
AD
DI
TIO
B 00
1
A NA
LR
E
40
WATAIN
LL IN FIR 43
G EW 75
1 C 00
0 AL
L/ 2
B 40
0 0 4 EX
IST UP
PR
OP
IN ER
G 1

FIR FU
EL
2
3
4 TY
EW 43 TA
5
6 OF 46
75 25
D 00
7

C 40
00
EX
AL
L/
PR
2 40
NK
S 15
70
13
00
8
9

10
11
LR
TA 3
12
IST UP OP 90
0 13
14 UP
IN ER 15
G 1 16
FU
EL
2
3
4 TY 00 17
18
19
OF 46
E 12 20

00
5
T 6
25
D 00 AN
40
7
LR
3
13 8
KS
40
9

15
00 TA
10
7 11
12
EX EN W E
IST FIC
0 00 OPELO
13
14 OF
9 15
16
UP
ING B
17
00 18 RE
WATAIN
19
E/ M

E 12 20

00 AG OO
ORITY R
40 LL ING T
S IL
UT

EX EN W E AD A
FIC
IST
ING OPELO
B
OF
WA D
LL ITIO L RT
RE NA F
WATAIN E/ M
AG OO
L RE TYO
LL ING OR Y R TA R
ST ILIT
UT
IN
IN O PE
G
AD OS
E
/ PR
WA D RT
A -
RP R
PU DDE
ALL
LL ITIO I
FL
LT RE
EW
OR MU SH
AT
N TIC
AL
RE TY
O
DE
C OR
ER
FIR
TA
IN E R VE
RT

OP
ON
IN EC
G R ST
/P
A
SE -W
BIO
PO
UR DER LL
WA
I - P D
R LT RE
TO MU SH
ICA E
FIR
T
C OR
DE TE
R
R
N VE
CO
TE
AS AD
-W
BIO DI
TI
A ON
AL
RE
WATAIN
LL IN
G
AD
DI
TIO
B 40
00 1
A NA
LR
E TAPTON 4Ø"P
EARES VCPIE
WATAIN DRANILNIETSTORM
LL IN FIR 43
G EW 75
FR
TAPTOTHOMWATERSOU 1 C 40
00 AL
L/ 2
B 40
0 0 EN R
WATERSEAREST CE
OURCE
EX
IST CB UP
PR
OP
ING 1 ER
FIR FU
EL
2
3
4 TY
EW 43 TA
5
6 OF 46
75 00 25
2 D
7
LR
40 NK
3
8

C 0 AL 9

0 L/ S TA
40 P CB 10 ST
EX UP
RO E/
AG Y
11
12
13

IST 1
P ER OR LIT M
ST UTI OO
14
15
16
UP

R
IN
G
2
3
4 TY 17
18
19
FU OF 46 00
E
5 20

40
6
EL 25
D 00
7
LR
3
8
T
40 ET
9
AN TA CB LL 1
PABOX
KS
2
56
9.54
29

10
11
12
EX ET
E/ 13 IST LL 1
AG Y 14 UP PABOX
T ORTILITOM
S U O
15
16
ING
R 17 A SK
18 RE TE
RR DE
WATAIN
19
H 3

E
20

00 T EC OX
LL
ET
40 LL ING IO B PA
ET CB B
LL 1 RA GE
PA BOX 2
56

TE
R AS
RBBIN
9.54
29

H 2 A
AD EC OX
ET T G
A
WA
RT
LL 1 BIO B
PABOX D
EX LL ITIO RA LE L
IST A ES
K
NA ER TA
B F
YO
RR D HT1 G
ING TE LR EC X
OT BO RT
IN
RE E
T B
CH X 3
O LL
E T ET CB BI SO
R T
AIN
WATAIN RR
A
BIO
GE
PA
I NG RA
GE
O PE
LL ING TE
CH X 2 A
AS
RBBIN NT
S TO
RS / PR
AD E
T B O G
A ME INE LL
WA D
LL ITIO
BIO
LRT EQ
UIP
NT
A
A
RA CO
EW
E
N ER TA
BL
O F BINET
FIR
AL HT1 G SH UC
WA / FA
TY
C IN G
RE TE BOX RT YIN M
BIO SO DRDRU
W
TA
IN E P ER HIN
IG ALE
G
IN
RO
AG
G OR WE SC
ST P RO S
L/
T
EN RS LL BIN
INE
AL
E
IPM A UP ST
QU NT WA
EW
E
CO
BINET
SH UC
WA / FA
W FIR
G
HIN
IG ALE PO G
YIN M
RO WE SC DRDRU
RC
LL INS H
UP EB
ST
WA

G
PO YIN M
RC DRDRU
H

1 WATERLINE LAYOUT ISOMETRIC DIAGRAM 2 SEWER & STORM DRAIN LINE ISOMETRIC DIAGRAM
P-4 SCALE: 1 : 85 SCALE: 1 : 85
P-4

PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

P-4
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
Doña Julia Vargas Ave, Ortigas Center, Pasig City TRIPA DE GALLINA SOLID ISOMETRIC VIEW
WASTE PROCESSING FACILITY
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
GENERAL NOTES AND SPECIFICATION LEGEND:
1. ALL PLUMBING WORKS TO BE DONE AND SIZES OF THE PIPES TO BE SEWER LINE
FAUCET
GENERAL NOTES

USED SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF POLYSTYRENE 600


UNIFORM PLUMBING CODE OF THE PHILIPPINES AND LOCAL STORM DRAIN LINE PANEL 600
REGULATIONS AND ORDINANCES CAPPED
WATER LINE
50mm Ø WATER CLOSET
2. ALL PIPES SHALL BE INSTALLED AS INDICATED IN THE WORKING
DRAWINGS. ANY RELOCATION REQUIRED FOR PROPER EXECUTION OF
VENTILATION LINE VENT PIPE LAVATORY 4" THK. CHB STEEL GRILLS COVER
OTHER TRADES SHALL BE UPON THE APPROVAL OF ENGINEER F FAUCET 4" THK. CHB
50mm Ø VENT PIPE
3. ALL PIPES SHALL BE PROVIDED BY PROPER HANGER AND SUPPORT. WC WATER CLOSET 13mm Ø COLD ANGLE VALVE SLOPE
WATER LINE PIPE 13mm Ø COLD 4"Ø PVC PIPE (INLET) 4"Ø PVC PIPE (OUTLET)

600
LAV. LAVATORY WATER LINE PIPE

VARIES
4. ALL FIXTURES SHALL BE VENTED INDIVIDUALLY AND WATER LINES 10mmØ HORZ. BARS
4"Ø PVC PIPE (INLET) @ 0.40 M. 0.C
SHALL BE VALVE BY GROUP. FD FLOOR DRAIN P-TRAP CHB WALL
5. ALL PLUMBING FITTINGS SHALL BE ACCESSIBLE FOR MAINTENANCE KS KITCHEN SINK FLOOR FLANGE REFER TO ARCH'L DWG. 10mmØ VERT. BARS
P-TRAP @ 0.40 M. 0.C SLOPE
PROVIDE MANHOLE IF SUCH INSTALLATION ARE INSIDE THE CEILING. 10mmØ VERT. BARS
CO CLEAN OUT CLEAN OUT @ 0.40 M. 0.C

0.50
6. ALL CHANGES IN DIRECTION SHALL BE MADE BY THE APPROPRIATE USE
OF FORTY FIVE (45) WYE LONG SWEEP QUARTER BEND. ONE EIGHT
FCO FLOOR CLEAN OUT PLAN 4"Ø PVC PIPE (OUTLET)

100
WHEN THE CHANGE OF FLOW IS FROM HORIZONTAL TO VERTICAL A VTR VENT. THRU ROOF
SINGLE BEND COMBINATION MAY BE USED ONLY ON VENT PIPE.
CB CATCH BASIN 50mm Ø CONCRETE SLAB
7. NO DOUBLE HUB OR DOUBLE TEE BRANCH SHALL BE USED ON VENT PIPE
HORIZONTAL SOIL AND WASTE LINES.
ST SEPTIC TANK SECTION
DS DOWN SPOUT
8. PROVIDE PIPE SLEEVES AT WALL COLUMNS OR SLAB TO PROTECT
FROM BREAKAGE. SH SHOWER HEAD 9 CATCH BASIN DETAIL
9. ALL SLOPES FROM HORIZONTAL DRAINAGE PIPES SHALL MAINTAIN 1% HB HOSE BIBB P 5 NTS
UNLESS OTHERWISE SPECIFIED. GV GATE VALVE
10. THE BRAND AND OTHER DETAILED PLUMBING FIXTURES SHALL BE IN WM M WATER METER
ACCORDANCE WITH THE SCHEDULE FURNISHED BY THE ARCHITECT.
ANGLE VALVE 1 WATER CLOSET MOUNTING SECTION DETAIL 2 LAVATORY MOUNTING SECTION DETAIL 2800
11. GATE VALVE SHALL BE BRONZE BODY, SOLID WEDGE TYPE, SCREWED
OR FLANGED END. WYE PVC PIPE P 5 NTS P 5 NTS

45 DEG. PVC PIPE


12. USE UPLASTICISED POYVINYL CHLORIDE (uPVC) FOR ALL WATER PIPING 150 1000 150 600 150 600 150
SYSTEM.
13. USE uPVC SANITARY PIPING SYSTEM SERIES 1000 FOR 100Ø AND
SMALLER AND SBR-34 GRAVITY SEWER MAIN uPVC PIPING SYSTEM FOR 600
150Ø AND BIGGER.
14. ENGINEER-IN-CHARGE TO VERIFY ACTUAL LOCATION AND ELEVATION
OF STREET DRAINAGE, STREET SEWER AND STREET WATER MAINS FOR

150
ROOF LINE
CONNECTION BEFORE CONSTRUCTION. CONCRETE INLET
ADJUSTABLE STRAINER HEAD 100 MM Ø co co
FURNISHING CLAMP FOR ATTACHING PIPE
WATERPROOFING MEMBRANE OR METAL
CAP ROOF GUTTER
FLASHING TO SEEPAGE PANS
FINISHED FLOOR

1500

1200
INSTALLED AT 2° or 20mm SLOPE
PER METER RUN 75mm Ø ELBOW MH MH MH
SEEPAGE PAN WATERPROOF MEMBRANE (90° BEND)
WEEP HOLES
AIR OUTLET
CHAMBER
75mm Ø ELBOW co co 100 MM Ø
(90° BEND) PIPE

150
WASTE LINE
2° P-TRAP
75mm Ø PVC
DOWNSPOUT
PLAN

3 PITCH OF PIPE LINE PIPE SUPPORT


MH MH MH
P 5 NTS
4 FLOOR CLEAN OUT DETAIL (EVERY 1.50m)
P 5 NTS

350
INCREASER
INLET

300
FINISHED WALL LINE 100 MM Ø
PIPE OUTLET
4" Ø PVC PIPE PIPE SUPPORT 100 MM Ø

300
PIPE

300
POURED CONCRETE PAD (EVERY 1.50m)

300
CLEANOUT COVER

2000
CLEANOUT COVER
FINISHED FLOOR LINE
TO FIXTURE

1350
FINISHED FLOOR LINE

CATCH BASIN
COLD WATER 6 WALL CLEAN OUT DETAIL
SUPPLY P 5 NTS

4"Ø PVC BEND


8 DOWNSPOUT TO CATCH BASIN DETAIL
P 5 NTS SECTION
5 AIR CAPPED CHAMBER DETAIL 7 FLOOR DRAIN DETAIL 10 SEPTIC TANK DETAIL
P 5 NTS
P 5 NTS
P 5 NTS

PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

P-5
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
Doña Julia Vargas Ave, Ortigas Center, Pasig City TRIPA DE GALLINA SOLID PLUMBING DETAILS
WASTE PROCESSING FACILITY
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
DESIGN AND CONSTRUCTION OF HOUSING
FACILITY FOR THE TRIPA DE GALLINA SOLID
WASTE PROCESSING FACILITY

(MECHANICAL PLAN)

PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

M-1
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
Doña Julia Vargas Ave, Ortigas Center, Pasig City TRIPA DE GALLINA SOLID TITLE PAGE
WASTE PROCESSING FACILITY
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
1 2 3 1 2 3
4375 4625 4375 4625

FIREWALL/ PROPERTY OF LRTA FIREWALL/ PROPERTY OF LRTA

UP

UP

UP

UP
13

15

16

17

18

19
10

12

14

15
20

10

12

13

14

16

17

18

19
11

20
11
3

9
2

9
1

4
1
A F.E. A

STORAGE/
UTILITY
ROOM
S

FHC

FHC
4000

4000
ADDITIONAL RETAINING

ADDITIONAL RETAINING
WALL

WALL
DESK
F.E. F.E.
EXISTING FUEL TANKS

EXISTING FUEL TANKS


S S S

PALLET
BOX 1

PALLET
B B S

OFFICE
PALLET

GARBASGE
BOX 1

FIREWALL/ PROPERTY OF LRTA

FIREWALL/ PROPERTY OF LRTA


BIN
4000

4000
BIOTECH TERRA
F.E.

UTILITY ROOM
S

STORAGE/
BOX 3

SORTING TABLE

BELOW
OPEN
C C

BIOTECH TERRA
F.E.

BOX 2
4000

4000
BIOTECH TERRA
BOX 1

MULTI-PURPOSE
CONTAINERS

SHREDDER
STD RESPONSE FIRE SPRINKLER (K=5.6)
TYPICAL TO 50 NOS.

D S S
D S
EQUIPMENT
STORAGE

BIO-WASTE CONVERTER
WEIGHING
SCALE
4000

4000
STD RESPONSE FIRE SPRINKLER (K=5.6)
TYPICAL TO 50 NOS.

DECORTICATOR
RISER

RISER
WASTE BINS
FCV

FCV
W/ FAUCET
WASH BIN

F.E. F.E.
E E
ACV

ROLL UP
EXISTING RETAINING

EXISTING RETAINING
WALL

WALL
DRYING
DRYING

DRUM
DRUM

UNDERGROUND FIRE WATER TANK


TOTAL CAPACITY: 2000 GALLONS
ADDITIONAL RETAINING

ADDITIONAL RETAINING
PORCH
KINDLY SHOW
CALCULATION FOR
CV

THIS TANK,
FOR TANK VOLUME
FDC

ESTIMATE, REFER
TO NFPA 13, FOR
WALL

WALL
HOSE STREAM
FLOW RATE, 1
ACTIVE HYDRANT
AND SPRINKLER
DEMAND.

1 GROUND FLOOR FIRE PROTECTION LAYOUT 2 SECOND FLOOR FIRE PROTECTION LAYOUT
M-2 SCALE: 1 : 70 M-2 SCALE: 1 : 70

PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION


GROUND FLOOR FIRE

M-2
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
TRIPA DE GALLINA SOLID PROTECTION LAYOUT
Doña Julia Vargas Ave, Ortigas Center, Pasig City
WASTE PROCESSING FACILITY SECOND FLOOR FIRE
WAY MAKER OPC PROTECTION LAYOUT
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
DRAIN RISER TO LEVEL ABOVE

GENERAL NOTES COMBINATION STANDPIPE/RISER TO LEVEL ABOVE

CONTROL VALVE
1. THE FIRE PROTECTION SYSTEM HAS BEEN DESIGNED IN ACCORDANCE WITH
THE FOLLOWING CODES & STANDARDS PRESSURE GAUGE

PRESSURE REDUCING VALVE


· THE FIRE CODE OF THE PHILIPPINES CAPPED OUTLET

· NATIONAL BUILDING CODE OF THE PHILIPPINES CHECKED VALVE


FLOW SWITCH
· NFPA 10 - STANDARD FOR PORTABLE FIRE EXTINGUISHER
· NFPA 13 - STANDARD FOR INSTALLATION OF FIRE SPRINKLER SYSTEM
· NFPA 14 - STANDARD FOR INSTALLATION OF STANDPIPE AND HOSE SYSTEM TO SPRINKLER SYSTEM

· NFPA 20 - STANDARD FOR INSTALLATION OF FIRE PUMP PRESSURE RELIEF VALVE


· NFPA 5000 - BUILDING CONSTRUCTION AND SAFETY CODE UNION
· PSME - PHILIPPINES SOCIETY OF MECHANICAL ENGINEERS
· ASTM - AMERICAN SOCIETY OF TESTING MATERIALS AUXILARY DRAIN VALVE

SIGHT GLASS

INSPECTORS TEST VALVE


2. DESIGN CRITERIA
TYPE OF OCCUPANCY: BUILDING TO LEVEL BELOW

HAZARD CLASSIFICATION: LIGHT HAZARD


CAPPED OUTLET ON DRAIN RISER
DESIGN/AREA DENSITY: 0.1 GPM/FT²
MAXIMUM AREA OF COVERAGE PER SPRINKLER:
MAXIMUM SPACING BETWEEN SPRINKLERS :
225 FT² (20M²)
15 FT (4.6M)
1 FLOOR CONTROL VALVE DETAIL
SCALE: NTS
M-3
MINIMUM SPACING BETWEEN SPRINKLERS: 6FT (1.8M)
FIRE WATER SUPPLY DURATION: 30 MINUTES
SPRINKLER TEMPERATURE RATING: 165°F (74°C) TO FIRE SPRINKLER SYSTEM

3. ALL VALVES SHALL BE SECURED BY A PADLOCK AND STRAP IN THE CORRECT


OPERATIONAL POSITION.
WATER MOTOR ALARM

4. PROVIDE FLEXIBLE CONNECTORS OR EXPANSION JOINTS FOR ALL SERVICES ALARM PRESSURE SWITCH
PASSING THRU TO ALL BUILDING EXPANSION JOINTS.
CHECK VALVE RETARD CHAMBER
5. ALL PIPE PENETRATIONS THRU FIRE RATED WALLS SHALL BE PROVIDED WITH
FIRE STOPPING MATERIALS.
ALARM LINE STRAINER MAIN DRAIN VALVE

6. PROVIDE FLANGE CONNECTION FOR EVERY 6 METERS OF PIPE LENGTH. ALARM TEST SHUT-OFF VALVE
FIRE DEPARMENT CONNECTION ALARM VALVE TRIM
MAIN DRAIN PIPING
7. PROVIDE INSPECTOR TEST AND FLUSHING CONNECTION AT THE FARTHEST
SPRINKLER ON EVERY FLOOR. ALARM CHECK VALVE
AUTOMATIC DRIP VALVE

8. THE FIRE PROTECTION PIPING INSTALLATION MUST BE SUPERVISED AND CHECKED UNDERGROUND SUPPLY
SYSTEM SIDE WATER GAUGE
BY A REGISTERED OR PROFESSIONAL MECHANICAL ENGINEER.

9. THE AS-BUILT PLAN FOR THE FIRE PROTECTION LAYOUT MUST BE SIGNED AND DRY
SEALED BY A PROFESSIONAL MECHANICAL ENGINEER.
2 ALARM CHECK VALVE ASSEMBLY
10. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETENESS OF THE SYSTEM. M-3 SCALE: NTS

PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION GENERAL NOTES

M-3
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE FLOOR CONTROL VALVE
Doña Julia Vargas Ave, Ortigas Center, Pasig City TRIPA DE GALLINA SOLID DETAIL
WASTE PROCESSING FACILITY ALARM CHECK VALVE
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
ASSEMBLY
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
38Ø ANGLE HOSE VALVE
250 mm (1500mm) FROM FINISHED FLOOR)

2 MM THK.
CLEAR GLASS GLASS
ACCESS HANDLE
30m HOSE

500 mm
FIRE EXTINGUISHER
25X50 MM ANODIZED 10 LBS DRY CHEMICAL
ALUM. FRAME FOR (ABC TYPE)
SURFACE CABINET
FIRE HOSE VALVE

Ø75mm BLACK IRON


TUBULAR PIPE

FINISHED FLOOR LINE

10 LBS ABC
DRY CHEM. PFE FLANGE ANCHOR BOLTED

1 FIRE EXTINGUISHER DETAIL 2 FIRE HOSE CABINET DETAIL


M-4 SCALE: NTS SCALE: NTS
M-4
BRANCHLINE

90 DEGREE ELBOW

DROP NIPPLE WALL FASTENER (TYPICAL)


RISE NIPPLE
25Ø X 15Ø mm PRESSURE GAUGE

RANGE PIPE COUPLING REDUCER


SIGHT GLASS

INSPECTOR'S TEST
VALVE NOT OVER
1.8 M (6FT) ABOVE FLOOR

PENDENT TYPE
SPRINKLER HEAD
DEFLECTOR
FLOOR LINE

3 FIRE SPRINKLER (PENDENT TYPE) DETAIL 4 INSPECTOR'S TEST CONNECTION & FLUSHING DETAIL
SCALE: NTS SCALE: NTS
M-4 M-4
PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

FIRE EXTINGUISHER DETAIL


METROPOLITAN MANILA DESIGN AND CONSTRUCTION FIRE HOSE CABINET DETAIL

M-4
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE FIRE SPRINKLER (PENDENT
Doña Julia Vargas Ave, Ortigas Center, Pasig City TRIPA DE GALLINA SOLID TYPE) DETAIL
WASTE PROCESSING FACILITY INSPECTOR'S TEST
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT, CONNECTION & FLUSHING
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS DETAIL
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
BLACK IRON/ GALVANIZED IRON PIPE SLEEVE

PROVIDED W/ ROCK WOOL MINERAL WOOL OR CONCRETE WALL OR BEAM


APPROVED EQUAL

45°
FILLED W/ FIRE RATED SEALANT FIRE 22Ø IN BOLT
FILLED W/ FIRE RATED SEALANT STOPPING OR APPROVED EQUAL
FIRE STOPPING OR APPROVED WELD (TYPICAL) EXPANSION SHIELD
EQUAL BLACK IRON/ GALVANIZED
IRON PIPE SLEEVE
65 X 65 X 7mm
PROVIDED W/ ROCK
SPRINKLER RISER STEEL ANGLE
WOOL MINERAL WOOL
OR APPROVED EQUAL PIPE PASSING THROUGH
R.C. FLOOR SLAB
BLACK IRON/ GALVANIZED
IRON PIPE SLEEVE
15Ø U-BOLT

1 PIPE SLEEVE DETAIL 2 PIPE RISER BRACKET DETAIL


SCALE: NTS SCALE: NTS
M-5 M-5

EXPANSION SHIELD

HANGER ROD
ADJUSTABLE
ADJUSTABLE RING HANGER
RING HANGER (CARBON STEEL
(CARBON STEEL FLAT BAR)
FLAT BAR)

SPRINKLER PIPE SPRINKLER PIPE

3 PIPE HANGER DETAIL


SCALE: NTS
M-5
PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION

M-5
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE PIPE SLEEVE DETAIL
Doña Julia Vargas Ave, Ortigas Center, Pasig City TRIPA DE GALLINA SOLID PIPE RISER BRACKET DETAIL
WASTE PROCESSING FACILITY PIPE HANGER DETAIL
WAY MAKER OPC
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
A B C D E

TOP OF BEAM
LEGEND
S S S S CEILING LINE
FCV
BUTTERFLY VALVE
FHC

FLOOR CONTROL VALVE


TOP OF BEAM
S S S CEILING LINE
Y - STRAINER
FCV

FLEXIBLE JOINT

FHC GV (FLUSHING)
GV (ITC)
CV PRESSURE RELIEF VALVE
FDC

ACV
PRESSURE GAUGE

UNDERGROUND FIRE WATER TANK CHECK VALVE

ALARM CHECK VALVE

GATE VALVE
1 FIRE PROTECTION SCHEMATIC DIAGRAM FLOAT VALVE
SCALE: 1 : 55
M-6

GV
GV
INDOOR FIRE HOSE CABINET
100 L
CV
STD RESPONSE FIRE SPRINKLER (K=5.6)
GV
CV GV PG
YS FJ FJ YS FJ FJ
WATER SUPPLY
GV GV GV PG PG OSV PG PG PRV OSV F.E. FIRE EXTINGUISHER

FIRE DEPARTMENT CONNECTION

S SMOKE DETECTOR

UNDERGROUND FIRE WATER TANK

2 BLOW UP DETAIL
SCALE: NTS
M-6
PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION


LEGEND

M-6
DEVELOPMENT AUTHORITY OF HOUSING FACILITY FOR THE
TRIPA DE GALLINA SOLID FIRE PROTECTION SCHEMATIC
Doña Julia Vargas Ave, Ortigas Center, Pasig City
WASTE PROCESSING FACILITY DIAGRAM
WAY MAKER OPC BLOW UP DETAIL
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City DATE: DATE: LOCATION:
2900 2900
2600
2600 600
MAN HOLE

WATER LEVEL (FULL)


1800
1500

2500

2000
PUMP HOUSE

1 FIRE WATER TANK TOP VIEW 2 FIRE WATER TANK ELEVATION VIEW
M-7 SCALE: NTS SCALE: NTS
M-7

1800

3 - 10 mm Ø TOP BARS
B - 1 (230 X 300)

PLASTER (1:3) WITH


WATER PROOFING
8 mm Ø BARS STIRRUP
2500

1500
150 mm THK RCC WALL

10 mm Ø VER. BARS @ 0.15 O.C


8 mm Ø HOR. BARS @ 0.15 O.C
3 - 10 mm Ø BOTTOM BARS

3 FIRE WATER TANK SECTION VIEW 4 B-1 DETAIL (230 X 300)


M-7 SCALE: NTS M-7 SCALE: NTS

PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.:

METROPOLITAN MANILA DESIGN AND CONSTRUCTION FIRE WATER TANK TOP VIEW
OF HOUSING FACILITY FOR THE FIRE WATER TANK ELEVATION
DEVELOPMENT AUTHORITY
Doña Julia Vargas Ave, Ortigas Center, Pasig City

WAY MAKER OPC


CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
DATE: DATE:
TRIPA DE GALLINA SOLID
WASTE PROCESSING FACILITY

LOCATION:
VIEW
FIRE WATER TANK SECTION
VIEW
B-1 DETAIL (230 X 300)
M-7
792 F. Manalo St., Bambang, Pasig City

You might also like