C O N T E N T S
E L E C T R I C A L A R C H I T E C T U R A L
DISTRICT/CITY/MUNICIPALITY
LIGHTING LAYOUT PERSPECTIVE
POWER LAYOUT VICINITY MAP
AUXILIARY LAYOUT SITE DEVELOPMENT PLAN
LAND USE & ZONING
GENERAL NOTES FLOOR PLAN
LEGENDS FRONT ELEVATION
LOAD SCHEDULE LEFT SIDE ELEVATION
SHORT CIRCUIT ANALYSIS REAR ELEVATION
VOLTAGE DROP CALCULATION RIGHT SIDE ELEVATION
IMPEDANCE DIAGRAM CROSS SECTION X-X
SINGLE LINE DIAGRAM CROSS SECTION Y-Y
FIRE ALARM RISER DIAGRAM LONGITUDINAL SECTION Z-Z
SERVICE ENTRANCE CONCRETE POST DETAILS DET. PLAN AND ELEVATION OF RAMP AT RECEPTION AREA
GROUND FAULT CIRCUIT INTERRUPTER (GFCI) DETAIL DET. PLAN OF BP344 RAMP AT MAIN ENTRANCE LINE & GRADE
240 V GFCI WIRING DIAGRAM FOR ELECTRICIAN'S REFERENCE DET. ELEVATION OF BP344 RAMP AT MAIN ENTRANCE
LUMINAIRES/LIGHTING FIXTURES DETAILS ROOF PLAN
FLOOR PATTERN LAYOUT
REAR ELEVATION PLUMBING
REFLECTED CEILING PLAN
GENERAL NOTES LEGEND AND SYMBOLS
LAV. & WATER CLOSET MOUNTING SECTION DETAIL SCHEDULE OF DOORS AND WINDOWS
CATCH BASIN DETAIL/FLOOR DRAIN DETAIL DETAILED PLAN OF MALE TOILET & BATH
DOWNSPOUT TO CATH BASIN DETAIL DET. SECTION - 1/DET. SECTION - 2/DET. SECTION - 3
WATER METER DETAILS DETAILED PLAN OF FEMALE TOILET & BATH
SEWER LINE LAYOUT DET. SECTION - 1/DET. SECTION - 2
LEGENDS & SYMBOLS DETAILED SECTION OF LAUNDRY SINK
ARCHITECTURAL
SEWER LINE ISOMETRIC LAYOUT FLOOR PLAN OF TRAINING AREA
WATER LINE LAYOUT DETAILED SECTION - 1
ISOMETRIC WATER LINE LAYOUT LAYOUT STEEL GATE DETAIL/STEEL LOUVER DETAIL
STORM DRAINAGE LAYOUT DETAILED PLAN OF KITCHEN
STORM DRAINAGE ISOMETRIC LAYOUT DETAILED SECTION - 1
SEPTIC VAULT DETAILS DET. ELEVATION OF BASKETBALL STAND/BACKBOARD DETAILS
MANHOLE DETAILS ROOF VENTILATION DETAIL
GREASE TRAP DETAILS DET. PLAN OF BASKETBALL COURT/BADMINTON COURT
DETAIL OF ANAEROBIC BAFFLED REACTOR BLEACHER DETAILS
SCHEDULE OF WALLS BADMINTON COURT DETAILS STRUCTURAL
CONNECTION DETAILS VOLLEYBALL COURT DETAILS
SECTION DETAILS
S T R U C T U R A L
67.70
60
GRD
GENERAL NOTES
RIGHT SIDE ELEVATION LEFT SIDE ELEVATION DEPRESSED SLAB & SLAB EDGE DETAILS
TYPICAL REBAR DETAIL OF DEPRESSED/SUSPENDED SLAB FOR
DIFFERENT ELEVATION
TYPICAL PIPE SLEEVE OPENING FOR SLABS
TYPICAL DETAILS SECTION OF PARAPET
TYPICAL DETAILS OF STIFFENER BEAMS & COLUMNS
TYPICAL SLAB & BEAM CONSTRUCTION JOINT DETAILS
SANITARY
TYPICAL SPLICE DET. FOR BEAMS FRAMING INTO COLUMN
CONTROL JOINT FOR SLAB-ON GRADE
TYPICAL DETAILS FOR SLEEVES THRU CONCRETE BEAM
ARCHITECTURAL GENERAL NOTES: REINFORCEMENT CONCRETE LINTEL BEAM IN CHB WALLS
CHB WALL ELEVATION & TYPICAL LINTEL BEAM DETAILS
FOUNDATION PLAN
- ALL WORKS DESCRIBED HEREIN SHALL BE EXECUTED IN FOOTING DETAILS
ACCORDANCE TO THE LATEST PROVISION OF THE
NATIONAL BUILDING CODE AND APPLICABLE LAWS, FOOTING DETAILS/FOOTING TIE BEAMS SCHEDULE
ORDINANCES, RULES AND REGULATIONS. DETAILS WALL FOOTING 2
- ALL FIXTURES/FINISHING MATERIALS SPECIFIED HERE-IN COLUMN SCHEDULE ELECTRICAL
SHALL BE OF APPROVED TYPE SUPERIOR QUALITY ENTRANCE ROOF FRAMING PLAN/DETAILS OF HT-1
ELEGANT TYPE AND SHALL BE-APPROVED PRIOR TO
INSTALLATION, CONTRACTOR SHALL SUBMIT SAMPLES DETAIL CONNECTION OF HT-1 SUPPORT
FOR ARCHITECT'S/ENGINEER'S APPROVAL. ROOF FRAMING PLAN
- CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND SCHEDULE OF R.C. BEAMS/DETAILS SECTION OF R.C. BEAM
TECHNICAL PRODUCT BROCHURES FOR ALL SPECIALTY ST1 AND ST2 DIAGRAM/ST3, ST4, ST5,ST6, AND ST7 DIAGRAM
INSTALLATIONS DESCRIBED HERE-IN AS MAY BE
REQUIRED BY THE DESIGNING ARCHITECT/ENGINEER. ST3, ST4, ST5 AND ST6 ELEVATION DETAILS
ROOF FRAMING PLAN/TRUSS DIAGRAM
- THE PLANS ARE INTENDED TO PROVIDE FOR A PLUMB
AND LEVEL STRUCTURE. ANY NOTATIONS AND/OR TUBULAR STEEL BEAM TO WIDE FLANGE STEEL COLUMN
DIMENSIONS INDICATED THAT ARE CONTRARY TO THESE CONNECTION DETAILS
PERSPECTIVES SHALL BE REFERRED TO THE ARCHITECT/ENGINEER FOR
CLARIFICATION. STEEL SECTION DETAILS/TRUSS TO RG CONNECTION
SC1 TO RG2 CONNECTION/SC1 TO RG1 CONNECTION
MECHANICAL
BASE PLATES DETAILS/RAMP DETAILS
WF-1 FOOTING DET./FRAME ELEVATION AT TRAINING AREA
SCHEDULE OF WELDS
STRUT TO TRUSS CONNECTION DETAILS
TYPICAL PURLIN CONNECTION DETAIL
MOMENT CONN. DETAILS AND NON-MOMENT CONN. DETAILS
STRUT DETAILS/SECTION/ELEVATION
COVERED COURT
PROJECT & LOCATION: SHEET CONTENT: DRAFTED/CAD ENCODED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NO.:
PERSPECTIVES
REPUBLIC OF THE PHILIPPINES CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT JUDY ANN F. ALCEDO
ENGINEERING ASSISTANT
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS -
REGIONAL OFFICE IX STARUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND PREPARED:
A-1
VETERANS AVENUE EXT., TETUAN, ZAMBOANGA CITY CONSTRUCTION OF EVACUATION CENTERS - REGION IX PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
Brgy. Dao, Pagadian City, Zamboanga del Sur ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 1
NELLY S. MUHSIN CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ARCHITECT III
DATE: DATE: DATE: DATE:
A' C
RP1
2.78
UP
CISTERN
1.20
TANK g r e e n g r e e n
RAMP
UP W A L K W A Y
(4.50m x 6.50m) RP2
3'
TAWAGAN
10.00
BOGO UP. CAMPO MATERIAL
RAMP UP
MANGA NORTE NEW
ISLAM RECOVERY
LABANGAN FACILITY
KAHAYAGAN
RAMP UP
DALAPAN 0
LENIENZA TAPODOC .0
R1 LAUNDRY AREA /
DRYING AREA
DAO
BULATOC
UP
1'
BANALE SANG-AN
TIGUMA BULANIT 0.60
g r e e n
0
.0
R2
TUBURAN TAWAGAN
SUR LO. SANG-AN
WHEEL STOP
40
P.W.D. PARKING SPACE
5.
BALINTAWAK
5.25
KAWIT
g r e e n
PA ISA
D
RK BL
IN ED
BUENAVISTA
G
BALANGASAN SEPTIC
TANK
3.
7.60m x 2.80m
50
60.0 MTRS
MURICAY
60.0 MTRS
NAPOLAN 5.60
PROPOSED
PAGADIAN CITY
52.85
MAIN
EVACUATION CENTER /
35.60
50.02
ENTRANCE UP
MULTI-PURPOSE
COVERED COURT
W A L K W A Y
LOCATION MAP
4.00
P A R K I N G
40
)
km
0
87
0.
2.00
N=
O(L
P.W.D.
SPORTS RAMP UP
I
S T
FACILITIES
S
O
(ROA R M
N
D 05 W
) AT
E
75
E R
T
X
2.
E
SAM
T
PAG
)
74 km
UIT
E
AS
TRE
0.
E
ET
(L=0
= 0.0
85
R
.454
k m)
T
GTH
S
THIS SITE
LEN
Y
I S
North
G U M A 10mm THK CONCRETE CURB
M E L A
D A
)
074 km
S T
W A L K W A Y
R E
E T
( L PROPOSED
H = 0.
= 3
7 3 EVACUATION
. 7 UP
T
5 CENTER
7'
LENG
k m
)
WA
LIN
G -WA
AD
RO
LIN
GS
NG
TRE
ISTI
E
EX
T (L
=0.2
70 k
R3.
m)
y Street 2
5.12
African Dais
9.5
L = 0.044 km
MAGUINDANAO
16
FARMERS TRAINING
HALL
(BIO-ORGANIC BLDG.) LAUNDRY AREA /
PROPOSED ROAD
POCKET
CENTER
00
R2.
R
M
W
Farmer's Hall
A
PROPOSED ROAD
9'
WALKWAY
S
13.12
T
1.70
O
W A L K W A Y
R
00
CHAPEL
M
.
FOREST
W
R1
cr
3.00
AT
RAMP
9.35
cr
E
Dep Ed
R
S T O R M W AT E R
Prov'l. office
yon
UP
mega
stage
6.00
POCKET
FOREST SERVICE VEHICLE ANAEROBIC BAFFLED
slaug
E
TAG IAL
en
REACTOR (ABR)
hter
kitch
NS
cr
PARKING SPACE
POWER
en ing
Cante build
YO RENC km) (5.00m x 7.00m)
GA
CANAL 5
ME UMFE 0.193
C
HOUSE
4
3
CIR D (L = )
2
1
STAGE BLEACHERS
0 km
FEMALE
T&B
6
5
4
3
2
1
A 5
RO
4
=0.8
T (L
TEAM BENCH AREA
BAT
AREA
E ent
TEAM BENCH
TEAM BENCH
PROPOSED BLEACHERS
TEAM BENCH
COM TS um
R E
mon
SPOR A P se
CAM
hou
AREN
tree
T
SCORER'S TABLE
SCORER'S TABLE
tree
BSP
POCKET
S FOREST
TEAM BENCH AREA
TEAM BENCH AREA
L
TEAM BENCH
TEAM BENCH
A
K flags
Y A
BSP REG. HALL
km )
PROPOSED ARC
AREA
HERY
3 S 42° 23' 31.00" E 60.0 MTRS 2
A .432
(L=0
6
ARE
Quarter
E T
FIEL
D
MAIN
GROUTED RIPRAP
P A T H W A Y
Balay R E
P A T H W A Y
Y (2.00 M)
CER
Athletes
T
Y
E
L
A
I
P O
W
cr
W
A T
T
H
H
T H
W
A
P
A H
P A
Y T
SOC S T
A
B
arter
km)
es Qu
ENTRANCE
Athlet
Y
C O N C. P A V E M E N T
A
A
W
T H
Receiving
P A
R R
0.256
P A T H W A Y
male s
P A T H W A Y
Y
N A
A
ER
W
gazeb
T H
te
P A
ACH athle
2.90
C O N C. P A V E M E N T
5
MINI BAR
s Quarter
BLE ATHLETES
K (L =
P
A
RIPRAP
T
H
W
Y
GROUTED
Y A
A
Y
A
W
road
W
Receiving
H
T H
T
A
P
P A
W A Y
P A T H
A Y
Athlete
W
AA P A T H
GROUTED RIPRAP
UP DN
VILLAGE
LINE
TENNIS COURT GROUND
NATU RAL
TRAC
EXISTING
DN. Receiving
UP
E
A
G
4
arter
UP T
S
es Qu
Athlet
o
gazeb
ACK
VAL
L TR
T
B
cr O
A
I
T
L
H
OVA
hall
T
mess
. TO O
gazeb
o
3
arter
L ST
REC
9'
OMM
R
es Qu
END
ED
Athlet
FOU
L LINE
2OO
FT. Receiving
MIN.
YAKA
AREA
SKIN
JCT.
A' C'
PROJECT & LOCATION: SHEET CONTENT: DRAFTED/CAD ENCODED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NO.:
LOCATION MAP
REPUBLIC OF THE PHILIPPINES CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT JUDY ANN F. ALCEDO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOT PLAN ENGINEERING ASSISTANT
REGIONAL OFFICE IX STARUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND SITE DEVELOPMENT PLAN PREPARED:
A-2
VETERANS AVENUE EXT., TETUAN, ZAMBOANGA CITY CONSTRUCTION OF EVACUATION CENTERS - REGION IX PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
Brgy. Dao, Pagadian City, Zamboanga del Sur ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 2
CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
NELLY S. MUHSIN
ARCHITECT III DATE: DATE: DATE: DATE:
3' 2' 1' 1 2 X 3 4 Y 5 6 7 7' 8' 9'
50.02
7.95 1.50 5.45 5.45 4.55 4.55 5.55 5.55 1.50 7.95
1.20 3.98 3.98 3.20 3.20 4.50 1.35 6.40 1.35 1.80 3.75 3.65 1.90 3.975 3.975 1.20
2.20 2.40 1.50 2.25 2.25
1.10 1
ELEV. up ELEV. ELEV. up
0.19 0.03 A-14 0.03
LAUNDRY AREA/DRYING AREA ELEV.
LAUNDRY AREA/DRYING AREA
ELEV.
0.19 0.19
W W A L K W A Y ELEV. W W
2 0.15 1 1
D
C D W W D
1
D W W W D
C
sho. sho. sho. 7 sho. sho. sho.
1.32
STO./ ELEV. 7
1.70
ss 3 3 3 up 1 1 1 ss
JAN. 0.20 up BACKSTAGE AREA 1
ELEV. PROVIDE PVC
25 25 25
25 25 25
0.70 ACCORDION
ELEV. D D W DOOR
0.20 3 3 3 (SHE) PARTITION W
ELEV.
1.53
W TOILET & BATH ELEV. (SHE) TOILET TOILET D STO. TOILET & BATH 0.175 3
(HE) (SHE)
1.59
3
5.05
5.05
ELEV. 3
(HE) 0.175 ELEV. T&B ELEV. CLINIC PRAYER (SHE)
0.175
T&B
ELEV.
0.175 ELEV.
(HE) 0.175 ELEV. ROOM 0.20 sho. 25 sho.
D 0.175
TOILET (HE) 0.20 25
sho. 25 25
sho. 3 25 25 D ELEV.
ELEV. TOILET 3 0.20
W 0.175
1.76
2
HALLWAY D sho. sho. EXISTING STAGE/
ELEV. sho. 25 sho.
ELEV. 3 0.175 25 W
W A L K W A Y
sho. 25 25
sho. 0.20
TRAINING AREA D D 2
1 1
B' W W
ELEV.
0.70 2 1 W D W W sho. 25 25 sho. B'
1.35
1.35
sho. 25 25
sho. 3 3 up up 2 1 1 1
W
B 2
sho. 25 25
sho. PWD
sho. 25 25
sho.
W
2
B
TOILET
W
PWD sho. 25 25
sho. 2
TOILET
3.25
3.95
3 D 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16
3
W
ELEV. D 3
0.18 3
G'
up
20 D
2
DELIVERY/
SERVICE AREA
REF REF
ELEV. H'
2.35
KITCHEN 0.15
W A L K W A Y
.80
W D ELEV. CONJUGAL
2.50
2 4 0.20 ROOM-1
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
4.80
D CONJUGAL
25 4 BREAST ELEV.
1.40
4.10
FEEDING ROOM-2 0.20
REF
DRY RM. ELEV. D
WET 4
2.45
REF 0.20 W W
RAMP STO. STO. ELEV.
5 D
5
1.60
UP 0.20 2
ELEV. ELEV.
0.175 0.20 D
TABLE 4
28.90
33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
F' W
D
6
D
4
W
F'
7 5 W
W
1 1
2.60 2.60 2.76
4.80
4.80
W
4 PLAY AREA
2
22.10
ELEV.
A-3 0.20 Z
g r e e n
49 50 51 52 53 54 55 56 57 58 59 60 61 62
D W
1 1
E' E'
Z 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 2.60m X 2.90m GA. 24 OVERHEAD
ROLLING STEEL SERVICE DOOR
2.90
ELEV. RAMP UP WITH COLD-ROLL FORMED
MESS HALL 0.20 CHANNEL AND ANGLE; MANUAL
OPERATION
4.80
4.80
W 4.40m X 2.90m GA. 24 OVERHEAD
ROLLING STEEL SERVICE DOOR STORAGE
1.20
4
WITH COLD-ROLL FORMED ELEV.
CHANNEL AND ANGLE; MANUAL 0.20
OPERATION 3.95 2.50 1.50
D D
2 W 2
79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 6
g r e e n
D' sofa
D
4
W
D'
D RECORD 2
1 ELEC.
2.35
PROVIDE PVC ROOM
ACCORDION RM
DOOR 1.50 ELEV. ELEV.
D
0.20 D 0.20 ELEV.
PARTITION 4 0.20 3
4.45
4.45
W ADMIN.
4 OFFICE ELEV.
RECEPTION AREA 1.90 1.90 D 0.15
95 96 97 98 99 100 101 102 103 104 105 106 5
ELEV. CONSULT. W
2.50
0.20 .15 ELEV. ROOM 1
0.20 ELEV.
0.20
A sofa
A
0.40
0.40
.35
1
1.00
g r e e n g r e e n ELEV. W W W W
1.20
ELEV.
0.03 W A L K W A Y 1 1 1 1
1.05
0.15
A' A'
2.40
UP
3.60
MAIN
3.20
WHEEL STOP
ENTRANCE
3.50m X 2.90m GA. 24 OVERHEAD
ROLLING STEEL SERVICE DOOR ELEV. 1.80 2.40
WITH COLD-ROLL FORMED 0.00
CHANNEL & ANGLE; MANUAL RAMP UP RAMP UP
4.00
OPERATION
P A R K I N G
2- 4.55m X 1.80m GA. 24 OVERHEAD
DISABLED ROLLING STEEL SERVICE DOOR
L I C WO
FLOOR PLAN
PROPOSED CONSTRUCTION OF
B R
S
O F
A N
A-03
ME
H I
REGIONAL OFFICE IX
T
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
(STANDARD PLAN)
NELLY S. MUHSIN ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 18 47
ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: JULY 2019 DATE: DATE: DATE: DATE:
0.50mm THK. LONGSPAN PRE-PAINTED
CORRUGATED G.I. ROOFING SHT.
1.00 1.00
1.40
.50
WITH 25mm ACCENT GROOVE SPACED
.45
.80
TOP OF ROOF BEAM (G2)
6.00
TOP OF GROOVE
3.30
3.51
2.90
2.55
2.10
W W W W
1 1 1 1
FINISH FLOOR LINE TOP OF WALKWAY
.20
.15
ELEV. ELEV.
0.00 FINISH GROUND LINE 0.00
STEEL LOUVER
PAINTED FINISH
1.00
TOP OF STEEL BEAM (RG -1) TOP OF STEEL BEAM (RG -1)
2.62
2.60
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
FRONT ELEVATION
PROPOSED CONSTRUCTION OF
B R
A N
A-04
ME
H I
REGIONAL OFFICE IX
T
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
(STANDARD PLAN)
NELLY S. MUHSIN ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 18 47
ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: JULY 2019 DATE: DATE: DATE: DATE:
0.50mm THK. LONGSPAN PRE-PAINTED
CORRUGATED G.I. ROOFING SHT.
TOP OF STEEL BEAM (RG -1) TOP OF STEEL BEAM (RG -1)
1.00 1.00
(DOWNSPOUT)
2.90
2.60
D W W W
W W W 1 2 3 3 100mm THK. R.C.
1 1 1 COUNTERTOP
D D
.30
0.85
8 8
FINISH FLOOR LINE
.20
ELEV. ELEV.
0.00 FINISH GROUND LINE 0.00
STEEL LOUVER
PAINTED FINISH
1.20
2.82
TOP OF STEEL BEAM (RG -1) TOP OF STEEL BEAM (RG -1)
2.60
W D W D W W D W W W W W 150mm THK. EXTERIOR WALL IN PLAIN
3 2 2 2 3 2 2 2 3 CEMENT PLASTERED PAINTED FINISH
1 1 1
ELEV. ELEV.
0.00 FIN. GROUND LINE FINISH GROUND LINE 0.00
2.60m X 2.90m GA. 24 OVERHEAD
1.00 ROLLING STEEL SERVICE DOOR
WITH COLD-ROLL FORMED 100mmØ PVC PIPE (DOWNSPOUT)
CHANNEL AND ANGLE; MANUAL
OPERATION
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
REAR ELEVATION
PROPOSED CONSTRUCTION OF
B R
A N
A-05
ME
H I
REGIONAL OFFICE IX
T
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
(STANDARD PLAN)
NELLY S. MUHSIN ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 18 47
ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: JULY 2019 DATE: DATE: DATE: DATE:
STEEL LOUVER PAINTED FINISH 0.50mm THK. LONGSPAN PRE-PAINTED
CORRUGATED G.I. ROOFING SHT.
1.55
2.82
1.00
EXPOSED TRUSS & PURLINS WITH
TOP OF STEEL BEAM (RG -1) SINGLE FOIL ROOFING HEAT INSULATION TOP OF STEEL BEAM (RG -1)
0.50mm THK. x 150mm WIDE
.40
1.40
1.40
PRE-PAINTED SPANDREL
BOTTOM LINE OF STEEL LOUVER
.45
TOP OF ROOF BEAM (G-1A)
1.02
3.25
2.90
2.88
STEEL LOUVER PAINTED FINISH
2.10
D D D D
3 1 2 1
1.00
3 SHE 2
2 1 W
FIN. FLOOR LINE 1 T&B 1
.20
ELEV. ELEV.
0.00 FIN. GROUND LINE 0.00
1.55 1.20
APEX LINE OF TRUSS APEX LINE OF TRUSS
3.50
3.50
1.00
EXPOSED TRUSS & PURLINS WITH
SINGLE FOIL ROOFING HEAT INSULATION
.60
TOP OF STEEL BEAM (RG -2) BETWEEN GRID LINE 3 & 5
TOP OF ROOF BEAM (G-2A)
2.26 2.26
.50
.80
1.02
2.03
3.50
2.70
3.70
3.25
2.62
BACK D D D D
STAGE 3 1 2 1
STAGE
1.00
ELEV. AREA
W
.50
0.70
FIN. FLOOR LINE 1 MAIN ENTRANCE
.20
.20
ELEV. ELEV.
0.00 FIN. GROUND LINE 0.00
.35
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
CROSS SECTION X-X
PROPOSED CONSTRUCTION OF
B R
A N
A-06
ME
H I
REGIONAL OFFICE IX
T
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
(STANDARD PLAN)
NELLY S. MUHSIN ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 18 47
ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: JULY 2019 DATE: DATE: DATE: DATE:
3' 1 2 3 4 5 6 7 9'
6mm THK. FIBER CEMENT CEILING
1.65 BOARD ON 19mmX 50mm X .40mm THK.
METAL FURRING NAILER
0.50mm THK. x 150mm WIDE
PRE-PAINTED SPANDREL
APEX LINE OF TRUSS APEX LINE OF TRUSS
2.82
3.50
EXPOSED TRUSS & PURLINS WITH
SINGLE FOIL ROOFING HEAT INSULATION
TOP OF STEEL BEAM (RG -1)
TOP OF STEEL BEAM (RG -2) BETWEEN GRID LINE 3 & 5
9.02
.80
TOP OF ROOF BEAM (G2) TOP OF ROOF BEAM (G2)
6.00
0.20
5.32
FIN. CEILING LINE
FIN. CEILING LINE
3.50
3.30
3.30
3.25
3.10
2.90
1.50
W W W D D D
7 W
3 3 2 1 1 1
D STAGE W W D
1 1
.60
MESS HALL 8 8 STORAGE
.50
FIN. FLOOR LINE
0.20
.20
ELEV. ELEV.
0.00 FIN. GROUND LINE 0.00
.40 .40
.20
.20
.20
.90
.20
ELEV.
.90
.90
0.03
.10
ELEV.
.90
.20
.10
0.20 ELEV.
.10
ELEV.
0.20
.20
0.20
.10
ELEV.
0.20
1.95
2.40 .10
DET. ELEVATION OF BP344
DET. ELEVATION OF RAMP 4 RAMP AT MAIN ENTRANCE
2 AT RECEPTION AREA A-07 SCALE 1:50 M
A A
.10
.35
1
.05
ELEV.
1.20
ELEV. ELEV.
1.20
UP 0.03 WALKWAY
A' 0.20 0.15
A'
1.05
MAIN
2.40
ENTRANCE
.10
ELEV. ELEV.
0.00 0.00
.10
.20
1.80 2.40 1.60
.10
.20
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
LONGITUDINAL SECTION Z-Z
PROPOSED CONSTRUCTION OF
B R
A N
A -07
ME
H I
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY DET. PLAN & ELEVATION OF BP344 RAMP PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
(STANDARD PLAN)
NELLY S. MUHSIN ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 18 47
AT RECEPTION AREA ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: JULY 2019 DATE: DATE: DATE: DATE:
3' 1 3 4 5 0.50mm THK. PRE-PAINTED
SPANISH G.I. GUTTER 7 9'
50.02
9.45 10.90 4.55 4.55 11.10 7.95 1.00
1.00 1.00
1.00
C RD BUILDING LINE RD C
6.40
6.40
0.50mm THK. PRE-PAINTED
SPANISH G.I. GUTTER
(TYPICAL)
RD RD RD RD RD RD RD
RD RD
1.55
BUILDING LINE
B CENTER LINE OF
COVERED COURT
BUILDING LINE
B
STEEL BEAM
0.50mm THK. PRE-PAINTED
COVERED COURT
SPANISH G.I. GUTTER
(TYPICAL)
BUILDING LINE
RD RD
BUILDING LINE
28.90
RD RD
22.50
0.50mm THK. LONGSPAN
RD RD PRE-PAINTED CORRUGATED
G.I. ROOFING SHT.
COVERED COURT
RD RD
BUILDING LINE
CENTER LINE OF
STEEL BEAM
A RD RD
.40
1.55
COVERED COURT
1.00
1.00
BUILDING LINE
RD RD RD
A' A'
RD RD RD RD
RD RD
1 ROOF PLAN
A-08 SCALE 1:100 MTS
L I C WO
ROOF PLAN
PROPOSED CONSTRUCTION OF
B R
S
O F
A N
A -08
ME
H I
REGIONAL OFFICE IX
T
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
(STANDARD PLAN)
NELLY S. MUHSIN ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 18 47
ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: JULY 2019 DATE: DATE: DATE: DATE:
3' 2' 1' 1 2 3 4 5 6 7 7' 8' 9'
50.02
7.95 1.50 5.45 5.45 4.55 4.55 5.55 5.55 1.50 7.95
C C
FF-03
up BACKSTAGE AREA up
FF-03 3 2 1
1 2 3
(SHE)
TOILET STO.
5.05
5.05
FF-01 CLINIC PRAYER FF-03 FF-03
TRAINING AREA TOILET FACILITY FF-02 ROOM
FF-01
FF-02
(HE)
FF-08 STAGE/TRAINING AREA TOILET
FF-03 FF-03 FF-01
W A L K W A Y
B' 1 2 2 1 B'
1.35
1.35
up up
B B
W A L K W A Y
3.25
3.95
(HE)
FF-01 FF-03 TOILET & BATH
(SHE)
FF-05
FF-01
G'
H'
FF-08
CONJUGAL
ROOM-1
4.80
4.10
FF-07 FF-03
FEEDING ROOM-2
FF-04 FF-02
RM.
FF-06
2.25 1.05 .90 .90 .70
28.90
F' F'
IDE FF-03
82
INS .60
4.80
4.80
FF-03
1.
R PLAY AREA
R
FF-05 FF-06
IDE
U TS .82
O R1
E' FF-05
E'
FF-07
MESS HALL
FF-03
4.80
4.80
THREE-POINT STORAGE
LINE R 7.30 FROM FF-03
CENTER OF GOAL
D' D'
RECORD ELEC.
ROOM RM
FF-05 FF-02 FF-03
ADMIN.
4.45
OFFICE
FF-03
FF-02 LEGEND AND SYMBOLS
CONSULT. FLOOR FINISH SCHEDULE
ROOM
FF-02 CODE DESCRIPTION
A A
0.40
0.40
FF-1 300mm X 300mm CERAMIC TILES
1
W A L K W A Y FF-08 FF-2 600mm X 600mm CERAMIC TILES
FF-07
A' FF-07 UP
A' FF-3 CONCRETE SLAB ON GRADE
PAINTED FINISH
CONCRETE SLAB ON GRADE
FF-4 WITH POWER FLOOR PAINT
FINISH
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
FLOOR PATTERN LAYOUT
PROPOSED CONSTRUCTION OF
B R
S
O F
A N
A -09
ME
H I
REGIONAL OFFICE IX
T
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
(STANDARD PLAN)
NELLY S. MUHSIN ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 18 47
ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: JULY 2019 DATE: DATE: DATE: DATE:
3' 2' 1' 1 2 3 4 5 6 7 7' 8' 9'
50.02
7.95 1.50 5.45 5.45 4.55 4.55 5.55 5.55 1.50 7.95
C CEIL.HT.
C
CF-1 2.88
EF EXPOSED
EF CEIL.HT. INCLINED STO.
2.80 CLINIC CF-1
CEIL.HT. CEIL.HT. CF-1 BEAM
CF-1
5.05
5.05
2.80 2.80 CF-1
EF EF CEIL.HT. EF
EF EF
2.80 CF-1 CF-1
CF-2 STAGE/TRAINING AREA PRAYER
CEIL.HT. CF-1 EF EF (INCLINED CEILING) CF-1 ROOM
2.80 CEIL.HT.
CEIL.HT. CF-1 3.00 CF-1
CEIL.HT. 2.80
3.25 EF CEIL.HT.
2.80
B' CEIL.HT.
B'
1.35
CEIL.HT.
CF-1 CF-1 3.25
3.25 CEIL.HT. CEIL.HT.
3.50 2.80
B TOILET & BATH
(HE)
CF-1
TOILET & BATH CF-2
B
EF CF-1 EF (SHE)
5.30
EF CF-1 EF
3.25
G'
CEIL.HT.
H'
2.90
BREAST
FEEDING RM.
4.80
4.10
3.10 CF-1 CONJUGAL ROOM-1
2.80 ROOM-2 CF-1
CEIL.HT. CF-1
2.90 CEIL.HT.
2.90 CF-1
CF-1 CF-1
28.90
F' F'
CEIL.HT.
3.25
CF-4 CEIL.HT.
3.25
PLAY AREA
CEIL.HT. CF-1
4.80
4.80
3.10
CF-1 CF-1 CEIL.HT.
2.90
E' E'
EXPOSED
BEAM LEGEND AND SYMBOLS
STORAGE CEILING FINISH SCHEDULE
CF-1
CEIL.HT.
4.80
CODE DESCRIPTION
3.10
CF-2 CEIL.HT. 6MM THK.FIBER CEMENT CEILING
2.90 CF-2
CF-1 BOARD ON 19MM x 50MM x .40MM
THK. METAL FURRING SPACED @
600MM O.C.
CF-2 PVC EAVES IN CUSTOM COLOR
D' RECORD CEIL.HT.
D' .50MM THK. x 150MM WIDE
EXPOSED ROOM 2.90 CF-3
BEAM PRE-PAINTED SPANDREL
CEIL.HT.
CEIL.HT. 2.90 EXPOSED TRUSS AND PURLINS
2.90 CF-1 CF-4 WITH SINGLE FOIL ROOFING HEAT
CF-1 INSULATION
4.45
CEIL.HT. ADMIN.
3.10 OFFICE
CONSULT. VENTILATION SLATS WITH INSECT
CF-1 SCREEN ( SEE DETAIL)
ROOM
CF-1
CEIL.HT. EF EXHAUST FAN
2.90
A A CEIL.HT. CEILING HEIGHT
0.40
L I C WO
REFLECTED CEILING PLAN
PROPOSED CONSTRUCTION OF
B R
A N
A -10
ME
H I
REGIONAL OFFICE IX
T
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
(STANDARD PLAN)
NELLY S. MUHSIN ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 18 47
ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: JULY 2019 DATE: DATE: DATE: DATE:
.90 .85 .85 .75 .75 .85
.50 .65
.15
.15
L/5
.85
.85
F F
L/5
2.10
2.10
2.10
2.10
2.10
2.10
L/5
.70 .65
L/5
.10 .30
.20 .20
L/5
FINISH FLOOR LINE
50MM THK. SINGLE-LEAF, SINGLE-ACTION 50MM THK. SINGLE-LEAF, SINGLE-ACTION 50MM THK. SINGLE-LEAF, SINGLE-ACTION 50MM THK. SINGLE-LEAF, SINGLE-ACTION 50MM THK. SINGLE-LEAF, SINGLE-ACTION 50MM THK. SINGLE-LEAF, SINGLE-ACTION
D SOLID WOOD PANEL TYPE SWING DOOR D HOLLOW CORE FLUSH TYPE SWING DOOR D HOLLOW CORE FLUSH TYPE SWING DOOR D HOLLOW CORE FLUSH TYPE SWING DOOR D HOLLOW CORE FLUSH TYPE SWING DOOR D HOLLOW CORE FLUSH TYPE SWING DOOR
WITH 10MM GROOVE (AS SHOWN) ON WITH 6MM THK. MARINE PLYWOOD FACINGS WITH 6MM THK. MARINE PLYWOOD FACINGS WITH 6MM THK. ORD. PLYWOOD FACINGS WITH 6MM THK. ORD. PLYWOOD FACINGS WITH 6MM THK. ORD. PLYWOOD FACINGS
1 50MM X 100MM WOODEN DOOR JAMB 2 ON 50MM X 100MM WOODEN DOOR JAMB. 3 ON 50MM X 100MM WOODEN DOOR JAMB. 4 ON 50MM X 100MM WOODEN DOOR JAMB. 5 ON 50MM X 100MM WOODEN DOOR JAMB. 6 ON 50MM X 100MM WOODEN DOOR JAMB.
PROVIDE STAINLESS STEEL KICKPLATE ON PROVIDE LOUVER (AS SHOWN) PROVIDE 6MM THK. CLEAR VIEWING GLASS PROVIDE 6MM THK. CLEAR VIEWING GLASS
PUSH SIDE (AS SHOWN) (AS SHOWN)
LOCATION : ADMIN. AREA, PLAY AREA, BACKSTAGE, CLINIC, STORAGE, DELIVERY, TOILET AT CLINIC STORAGE, DELIVERY, TOILET AT CLINIC KITCHEN, BREAST FEEDING RM., CONJUGAL RM. ADMIN. OFFICE KITCHEN
PRAYER ROOM, STORAGE
SET : 6 SETS 4 SETS 10 SETS 7 SETS 1 SET 1 SET
HARDWARE : a. LOCKSET: STAINLESS STEEL LEVER TYPE a. LOCKSET: STAINLESS STEEL LEVER TYPE a. LOCKSET: STAINLESS STEEL LEVER TYPE a. LOCKSET: STAINLESS STEEL LEVER TYPE a. LOCKSET: STAINLESS STEEL LEVER TYPE a. LOCKSET: STAINLESS STEEL LEVER TYPE
LOCKSET LOCKSET LOCKSET LOCKSET LOCKSET LOCKSET
b. HINGE: 4 PCS. 89MM X 89MM STAINLESS STEEL b. HINGE: 4 PCS. 89MM X 89MM STAINLESS STEEL b. HINGE: 4 PCS. 89MM X 89MM STAINLESS STEEL b. HINGE: 4 PCS. 89MM X 89MM STAINLESS STEEL b. HINGE: 4 PCS. 89MM X 89MM STAINLESS STEEL b. HINGE: 4 PCS. 89MM X 89MM STAINLESS STEEL
WITH FIXED PIN, 2 BALL BEARINGS WITH FIXED PIN, 2 BALL BEARINGS WITH FIXED PIN, 2 BALL BEARINGS WITH FIXED PIN, 2 BALL BEARINGS WITH FIXED PIN, 2 BALL BEARINGS WITH FIXED PIN, 2 BALL BEARINGS
.10
.10
.60
.85
1.50
2.10
2.10
2.10
2.00
2.00
1.80
1.80
.65
F
1.50
.60
.10
.10
50MM THK. SINGLE-LEAF, SINGLE-ACTION 35MM THK. FLOOR-MOUNTED PVC 35MM THK. FLOOR-MOUNTED PVC 6MM THK. CLEAR GLASS ON POWDER 6MM THK. CLEAR GLASS ON POWDER
D IN COLD-ROLLED STEEL SHEET WITH STEEL D PARTITION AND DOOR WITH STAINLESS D PARTITION AND DOOR WITH STAINLESS W COATED ALUMINUM FRAME SLIDING W COATED ALUMINUM FRAME AWNING
FRAME. PROVIDE PANIC DEVICE STAINLESS STEEL SUPPORT STEEL SUPPORT WINDOW WITH 6MM THK. CLEAR VIEWING WINDOW
7 STEEL PUSH BAR. 8 9 1 FIXED GLASS (AS SHOWN) 2
LOCATION : EMERGENCY EXIT PWD TOILET TOILET AND SHOWER CUBICLE ADMIN. OFFICE, PLAY AREA, CLINIC, KITCHEN, ELECTRICAL ROOM, TOILET
PRAYER ROOM, STORAGE
SET : 2 SETS 4 SETS 50 SETS 15 SETS 9 SETS
HARDWARE : a. HINGE: 4 PCS. STAINLESS STEEL a. LOCKSET: STAINLESS STEEL SLIDE LATCH a. LOCKSET: STAINLESS STEEL SLIDE LATCH
b. DOOR CLOSER: HYDRAULIC TYPE SELF-
CLOSING DEVICE b. HINGE: 2 PCS. BUTT HINGES b. HINGE: 2 PCS. BUTT HINGES
c. PANIC DEVICE: STAINLESS STEEL PUSH BAR
.30
.60
.60
.60
F
1.20
1.20
F
.60
OPEN
2.10
2.10
2.10
2.10
2.10
1.80
1.50
1.50
.90
.90
FINISH FLOOR LINE
6MM THK. CLEAR GLASS ON POWDER 6MM THK. CLEAR GLASS ON POWDER COATED ALUMINUM FRAME 6MM THK. CLEAR GLASS 6MM THK. CLEAR GLASS ON POWDER 6MM THK. CLEAR GLASS ON FRAMELESS
W COATED ALUMINUM FRAME AWNING W AWNING WINDOW W ON POWDER COATED W COATED ALUMINUM FRAME FIXED W FIXED WINDOW WITH RECEPTION OPENING
3 WINDOW 4 5 ALUMINUM FRAME AWNING 6 WINDOW 7
WINDOW
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
SCHEDULE OF DOORS AND WINDOWS
PROPOSED CONSTRUCTION OF
B R
S
O F
A N
A -11
ME
H I
REGIONAL OFFICE IX
T
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
(STANDARD PLAN)
NELLY S. MUHSIN ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 18 47
ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: JULY 2019 DATE: DATE: DATE: DATE:
1' 2' 3'
2.70
3.30
COUNTERTOP PAINTED FINISH
3.50
100mm THK. CHB SHOWER .80 x .50 .80 x .50 .80 x .50 SUPPORT BELOW
2.80
.60
PARTITION (2.025M HEIGHT
FROM FIN. FLR.) WITH 6
LAYERS OF 300MM X 300MM REINFORCED CONCRETE
.30
WALL TILES LAVATORY
LAUNDRY AREA/DRYING AREA
.80
.80
.65
PVC TOILET
ELEV.
PARTITION
.20
ELEV. 0.175
C C 0.00
FD FD FD SS FD FD
2
1.32
1.50
D D D .60
9
25 25
9 9
25
2 2 DET. SECTION - 1
D D D D A-12 SCALE 1:50 MTS
9 9 9 9
W TOILET & BATH
1.53
1.62
10.10
.90
1.10
.80
FD FD
9 9 FD URINAL
W FD
FIN. CEILING LINE
2 D
.90
SHOWER SHOWER
9
.80
FD URINAL
1.10
25 D D 25
9 9 FD TOP OF CHB PARTITION AT SHOWER
B' D
.90
3.50
SHOWER SHOWER
9
2.80
FD
.80
1.10
URINAL
25 D D
2.025
25
2.00
1.90
RECESSED FD
SOAP HOLDER FD 9 9 FD
W SS
2
.80
1.80
.60
.50
FD PWD SHOWER SHOWER SHOWER
1.10
.10
ELEV.
25
D D 25 FD TOILET ELEV. 0.175
9 9 300MM X 300MM 0.00
9.20
5.60
A-12 SCALE 1:50 MTS D
2.60
1.90
LAUNDRY AREA/
3
1.20
DRYING AREA
.30
.80
.85
.30
.10
ELEV.
ELEV. 0.175
0.00 .60
.65
4 DET. SECTION - 3
A-12 SCALE 1:50 MTS
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
DET. PLAN OF MALE TOILET & BATH
PROPOSED CONSTRUCTION OF
B R
DET. SECTION - 1
O F
A N
A -12
ME
H I
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
DET. SECTION - 3 NELLY S. MUHSIN REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 18 47
ENGINEER IV DISTRICT ENGINEER
(STANDARD PLAN)
ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: JULY 2019 DATE: DATE: DATE: DATE:
C B' H'
5-LAYERS 300MM X 300MM 100MM THK. CHB PARTITION
GLAZED WALL TILES AT (2.20M HEIGHT FROM FIN.
TOILET CUBICLE (TYP.) FLOOR LINE)
PVC TOILET
PARTITION
4
7' 8' 9' A-13
.20
1
100mm THK. CHB
3.98 3.98 COUNTERTOP
SUPPORT BELOW FIN. CEILING LINE
1.00 .90 .90 .90 ±.70 1.10 1.10 2.10
W W
.80mX.50m SINGLE BOWL 2.50 2.50 2.50
CONCRETE SINK IN 100mm THK
3 3
.80 x .50 .80 x .50 .80 x .50 100mm THK CHB SHOWER
REINFORCED CONCRETE
COUNTER WITH PLAIN CEMENT PARTITION WITH 6 LAYER OF TOP OF CHB PARTITION AT SHOWER
PLASTER SMOOTH FINISH 300MM X 300MM WALL TILES
3.50
.10 .50
2.80
.60
LAUNDRY AREA/DRYING AREA .85
2.20
PWD
2.00
PVC TOILET LAUNDRY AREA/ TOILET
.30
PARTITION DRYING AREA
.65
.30
C
.80
.80
SS
.50
.85
.10
FD FD FD ELEV. ELEV.
ELEV. 0.175 0.175
SS SHOWER SHOWER SHOWER
1.225
FD FD 0.00
1.50
25 25 25
.65 .65 50mmØ TEXTURED STAINLESS
D D D D D D D
9 9 9 9 ELEV. 9 9 9
W 2 DET. SECTION - 1 STEEL GRAB BAR
2.20
25
D 25 GLAZED WALL TILES AT
9 FD D D FD SHOWER CUBICLE (TYP.)
D
.90
9 9 9
FD
D SHOWER SHOWER
FD
2.20
25 25 FIN. CEILING LINE
D 9
D D FD 2
1.07
FD
2 9 W PVC TOILET
9 9 2 PARTITION
D
9
SHOWER B' ℄ OF SHOWER HEAD
2.20
25 25 SHOWER
1.07
D FD
FD D D FD
2.80
9 D 9 9
9
℄ OF RECESSED SOAP
1.95
SHOWER SHOWER HOLDER
FD
℄ OF FAUCET
2.20
25 25
D
1.15
W
.90
FD FD D D FD
9 2
.60
9 9
PWD ELEV.
1.80
FD SHOWER 0.175
D TOILET SHOWER W
.90
2.20
25 25
9 2 ELEV.
FD D D FD
9 9
0.150 C
300MM X 300MM D
RC COUNTER IN
UNGLAZED VITRIFIED
CERAMIC FLOOR TILE
8 100MM THK CHB
COUNTER SUPPORT,
3 DET. SECTION - 2
D W IN PLAIN CEMENT A-13 SCALE 1:50 MTS
PLASTERED SMOOTH 1.00
3 1.70 1.20
3 FINISH
FD FD FD
100MM THK. CHB PARTITION
(2.20M HEIGHT FROM FIN.
slope slope slope slope slope slope FLOOR LINE)
.60
H'
RC LAVATORY IN 100MM THK
CHB COUNTER SUPPORT, IN 100MM THK R.C. CANOPY WITH
PLAIN CEMENT PLASTERED 25MM X 25MM DRIP GROOVE
SMOOTH FINISH WITH 100MM
STAINLESS STEEL DRAIN
1 .65 HOSE BIBB
2.60
A-13 SCALE 1:250 M
1 DET. PLAN OF FEMALE TOILET & BATH
A-13
.30
SCALE 1:50 MTS
.20
.30
.85
.55
100mm THK. CHB
COUNTERTOP
ELEV. SUPPORT, PLAIN CEMENT
0.00 PLASTER PAINTED FIN.
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
DET. PLAN OF FEMALE TOILET & BATH
PROPOSED CONSTRUCTION OF
B R
DET. SECTION - 1
O F
A N
A -13
ME
H I
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
DET. SECTION OF LAUNDRY SINK NELLY S. MUHSIN REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 18 47
ENGINEER IV DISTRICT ENGINEER
(STANDARD PLAN)
ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: JULY 2019 DATE: DATE: DATE: DATE:
3 5
1 3 4 5 6 7 8.60
10.90 4.55 4.55 5.55 5.55
(VERIFY ACTUAL DIMENSION)
3.20 3.20 4.50 1.35 6.40 1.35 1.80 3.75 3.65 1.90
1.89 1.08 1.93 1.15 2.25 2.25
.55 1.10
.15
W W W W W W W W W
3 3 2 3 1 1 1 1 1
D
C 1 C
1.20
STO./ D ELEV. D
1.70
up
1.81
JAN.
3 0.20 up BACKSTAGE AREA ELEV.
0.70
3 2 1
1
PROVIDE PVC
1
1 2 3 ACCORDION
D D DOOR
3.65
D D D D
3 3 PARTITION
1.70
8 9 8 9
ELEV. ELEV. D STO.
1.59
0.175 HE SHE 0.175 SHE 3 CLINIC UP
SHE
1.84
HE
3.35
D 0.175 D D TRAINING AREA 0.20
3 9 D ELEV. CEMENT PLASTERED
9
PLAN
25 25
ELEV. ELEV. 3 0.20
2.15
0.175 HE PAINTED FINISH
1.76
D sho. 0.70
sho.
1
1.40
ELEV.
0.20
HALLWAY 3
D D D
B' W W
1 2 2 1 W
1
W W
1 1 B'
3
1.35
up up
.20 .20
3 3 2 1 1
5
B .40 .40
1.10 1.05 B SIDE-FOLDING STEEL PANEL
WITH 50MM X 50MM X 3MM THK.
4 - .85 X 2.10M SIDE-FOLDING
STEEL PANEL WITH 1.6MM THK
TUBULAR FRAME EPOXY SHEET PANEL ON 50MM X 50MM
ELEV.
PAINTED FINISH X 3MM THK. TUBULAR PIPE.
0.20 EPOXY PAINTED FINISH
.20 .35
.55
1 2 3 5 6 7
.50
2.10
℄
1 FLOOR PLAN OF TRAINING AREA
1.05
A-14 SCALE 1:100 MTS
3
ELEVATION 40MM X 40MM X 3MM
HORIZONTAL ANGLE
1 BAR (TYP.)
W W .10 .10
3 3 50MM X 100MM ALUMINUM
TUBULAR FRAME IN
AUTOMOTIVE LACQUER PAINT
FINISH (VERIFY COLOR)
RECESSED
2.80
2.10
.10
SOAP HOLDER
D
2.025
45
1.90
3
1.20
°
EXTRUDED BAR FULL
WELD IN AUTOMOTIVE
EXTERIOR SIDE
INTERIOR SIDE
LACQUER PAINT FINISH
.85
.60
(VERIFY COLOR)
.60
.40
.40
.30
ELEV.
ELEV. 0.175
SHOWER FIN.
0.00 FLOOR LINE
50MM X 100MM
ALUMINUM TUBULAR
.10
.30 FRAME IN AUTOMOTIVE
LACQUER PAINT FINISH
(VERIFY COLOR)
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
FLOOR PLAN OF TRAINING AREA
PROPOSED CONSTRUCTION OF
B R
DETAILED SECTION - 1
O F
A N
A -14
ME
H I
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
STEEL LOUVER DETAIL NELLY S. MUHSIN REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 18 47
ENGINEER IV DISTRICT ENGINEER
(STANDARD PLAN)
ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: JULY 2019 DATE: DATE: DATE: DATE:
3' 2' 1' 1100MM X 1830MM
COMMERCIAL 12MM HEAVY
1.20 3.98 3.98 DUTY FIBERGLASS
BACKBOARD WITH 50MM X
3.30 50MM ANGULAR STEEL FRAME.
PROVIDE 460MM Ø SNAP BACK
.60 RING.
0.75
DOUBLE BOWL STAINLESS
1.10
STEEL KITCHEN SINK STANDARD
DIAMETER OF RING
ELEV.
G' 0.18
PROVIDE STEEL PLATE
FOR CONNECTION (VERIFY
0.35
DIMENSION UPON
.60
INSTALLATION)
REF REF
D DELIVERY/ FD
2 SERVICE 25MM Ø ROUND BAR
2.35
2 ELEV.
0.20 150MM Ø B.I. PIPE PAINTED
D D FINISHED (VERIFY COLOR)
4.55
4.80
2.65
4 4
1.40
FD
DOUBLE BOWL
3.05
3.05
REF STAINLESS STEEL
KITCHEN SINK
2.70
WET DRY
STO. REF 1
2.45
RAMP STO.
UP
ELEV. ELEV.
ELEV. 0.175 0.20
0.00
1 TABLE 0.91 1.20
PART OF PLAYING COURT
D
F' 6
W 400MM X 400MM X 4.5MM
7 THK STEEL PLATE WITH
0.20 0.20
4-12MM Ø BOLT WITH NUTS
0.40
400MM X 400MM CONCRETE
PEDESTAL
1.70 1.60 4.66
3' 1'
3' 1'
1.83
0.75
300mm X 300mm THK.
1.10
GLAZED VITRIFIED 25MM Ø ROUND BAR
CERAMIC TILE
PROVIDE STEEL PLATE
FOR CONNECTION
GOOSENECK (VERIFY DIMENSION
0.35
3.50
3.10
SINK FAUCET UPON INSTALLATION)
D D
4 4 150MM Ø B.I. PIPE PROVIDE STEEL PLATE FOR
CONNECTION (VERIFY DIMENSION
460MM Ø SNAP BACK RING UPON INSTALLATION)
.85
1100MM X 1830MM
ELEV. COMMERCIAL 12MM HEAVY
ELEV. 0.20 DUTY FIBERGLASS 1100MM X 1830MM
0.00 BACKBOARD WITH 50MM X COMMERCIAL 12MM HEAVY
50MM ANGULAR STEEL FRAME. DUTY FIBERGLASS
BACKBOARD WITH 50MM X
50MM ANGULAR STEEL
PLAN FRAME.
SECTION
2 DET. SECTION - 1 DOUBLE BOWL STAINLESS
STEEL KITCHEN SINK 4 BACKBOARD DETAILS
A-15 SCALE 1:50 MTS
A-15 SCALE 1:25 MTS
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
DETAILED PLAN OF KITCHEN
PROPOSED CONSTRUCTION OF
B R
DETAILED SECTION - 1
O F
A N
A -15
ME
H I
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
BACKBOARD DETAILS NELLY S. MUHSIN REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 18 47
ENGINEER IV DISTRICT ENGINEER
(STANDARD PLAN)
ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: JULY 2019 DATE: DATE: DATE: DATE:
INSECT SCREEN
1' 1 2 3 5 6 7 7'
25MM X 25MM WD
SLATS SPACED
AS SHOWN
FINISH CEILING
600 LINE
72 72 72 72 72 72
B
2.25
15
UNOBSTRUCTED SPACE
47 47
25MM X 50MM
SOLID WOOD
FRAMES
SECTION
6.00
600
UNOBSTRUCTED SPACE
UNOBSTRUCTED SPACE
3.35
25MM X 50MM SOLID
WOOD FRAMES
25MM X 25MM WD
SLATS SPACED
AS SHOWN
6.00
1200
INSECT SCREEN
1.50
3.00
1.50
AREA OF BLEACHER AREA OF BLEACHER
.70
A
PLAN
12.00 2.75 12.00
1' 1 3 5 7 7'
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
ROOF VENTILATION DETAIL
PROPOSED CONSTRUCTION OF
B R
A N
A -16
ME
H I
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
(STANDARD PLAN)
NELLY S. MUHSIN ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 18 47
ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: JULY 2019 DATE: DATE: DATE: DATE:
.60 .60 .30
37 X 37 X 2.5MM THK
25MM X 2.00MM FLAT BAR ANGLE BAR
.45
WALK
.60
1.50
SEAT
1.35
.45
WALK
.60
.45
SEAT
PLAN SECTION
1.20 1.20
37 X 37 X 2.5MM THK
ANGLE BAR
.45
0
37 X 37 X 2.5MM THK 1.2
ANGLE BAR
ELEVATION .30
.60
0
1.2
.60
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
BLEACHER DETAILS
PROPOSED CONSTRUCTION OF
B R
S
O F
A N
A -17
ME
H I
REGIONAL OFFICE IX
T
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
(STANDARD PLAN)
NELLY S. MUHSIN ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 18 47
ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: JULY 2019 DATE: DATE: DATE: DATE:
9.00 24.00
UNOBSTRUCTED
3.00 9.00 9.00 3.00
1.50 6.00 1.50
SPACE
25MM Ø EYE BOLT UNOBSTRUCTED UNOBSTRUCTED
0.10
SPACE 6.00 3.00 3.00 6.00 SPACE
0.45M 2.55M 2.55M 0.45M
0.40
EDGE OF PAVEMENT
EDGE OF PAVEMENT
UNOBSTRUCTED
ROPE CLEAT
0.80M
1.50
50MM THK BORDER
SPACE
LINE WHITE PAINT H A L F C O U R T
3.00
BACK BOUNDARY LINE
0.40
0.75M
1.47
0.76
LONG SERVICE LINE
25MM Ø EYE BOLT
DOUBLE
DOUBLE
1.55
SINGLE
SINGLE
SERVING
0.57
4.00
6.00
0.15
0.764
50MM SPIKING LINE
15.00
9.00
0.60 FINISH FINISH
2.00
NET
0.026
NET
16.50
50MM GAUGE 40
G.I. PIPE
2.00
0.60
3.00
AREA
0.60
EDGE OF PAVEMENT
ALL LINE 50MM WIDE
50MM GAUGE 40
6.75M
DOUBLE
SINGLE
SINGLE
AT 200MM O.C.
UNOBSTRUCTED
4.00
SPACE
75MM NET POST
0.60
3.00
LONG SERVICE LINE
STAND POST, NET DETAILS 12MM Ø BARS SPACED
0.75M
AT 200MM O.C.
.05 .35 .05 BOTHWAYS
BACK BOUNDARY LINE
PLAN
1.50
5
EDGE OF PAVEMENT A-11 SCALE 1:100M
STAND POST, NET DETAILS
UNOBSTRUCTED
.05
SPACE
24.00
.20
.15
.05
1.50 6.00 1.50
.10
PLAN
.50
.20
SPIKING SPIKING
.90
A-11 SCALE 1:100M
.70
AREA AREA
.20
.05
.70
1.50 0.75M 4.00 2.00 2.00 4.00 0.75M 1.50
.45 75mm GAUGE
.20
40 G.I. PIPE
2.30
UNOBSTRUCTED UNOBSTRUCTED
2.60
SPACE SPACE
3.35
SHORT SERVICE LINE
2.45
LONG SERVICE LINE
0.30
+ 0.10m COURT F.F.L. PLAIN CEMENT FIN.
0.10
BORDERLINE 100mm THK. CONC. SLAB
0.10 1.62M
1.72M
SIDELINE DETAILS
.20
+ 0.10m COURT F.F.L.
CONCRETE STAND
PLAIN CEMENT FIN.
5.40 2.10
SIDELINE DETAILS
A-11 SCALE 1:10M
A-11 SCALE NTS
6.90
0.90 9M 0.90
4.50
PLAYING AREA
1.50 3.00
8 DETAIL OF NET
.15
AREA
DOUBLE
DOUBLE
CONCRETE STAND
SINGLE
SINGLE
.10 .62
1.50
5.10
6.00
.45 .45 1.05M
1.50
3 ELEVATION-2 75mm GAUGE 40 G.I. PIPE
CONCRETE STAND
STANDARD
VOLLEYBALL NET
7 ELEVATION-2
A-11 SCALE NTS SCALE 1:10M
UNOBSTRUCTED UNOBSTRUCTED PLAIN CEMENT FIN. A-11
SPACE SPACE
9.00 100mm THK. CONC. SLAB
L I C WO
BADMINTON COURT DETAILS
PROPOSED CONSTRUCTION OF
B R
A N
A -18
ME
H I
REGIONAL OFFICE IX
T
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
(STANDARD PLAN)
NELLY S. MUHSIN ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 18 47
ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: JULY 2019 DATE: DATE: DATE: DATE:
³
³
³
PROJECT & LOCATION: SHEET CONTENT: CAD ENCODED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
I C
GENERAL NOTES
PROPOSED CONSTRUCTION OF
WO
BL R
U K
P
A N
S - 01
E
H I
TM
REGIONAL OFFICE IX
G
DESIGNED:
A A
P Y S
DE
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN) ENGINEER IV DISTRICT ENGINEER 19 47
CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA MICHAEL D. TORINO
DATE: ENGINEER II DATE: DATE: DATE: DATE:
PROJECT & LOCATION: SHEET CONTENT: CAD ENCODED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
I C
DEPRESSED SLAB & SLAB EDGE DETAILS
PROPOSED CONSTRUCTION OF
WO
BL R
U K
P
A N
H I
TM
REGIONAL OFFICE IX
G
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN) TYP. DETAILS SECTION OF PARAPET ENGINEER IV DISTRICT ENGINEER 20 47
TYP. DETAILS OF STIFFENER BEAM & COLUMNS MICHAEL D. TORINO CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
TYP. SLAB & BEAM CONST. JOINT DETAILS
DATE: ENGINEER II DATE: DATE: DATE: DATE:
℄
PROJECT & LOCATION: SHEET CONTENT: CAD ENCODED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
TYP. SPLICE DETAILS FOR BEAM FRAMING INTO COLUMN
I C
A N
H I
TM
REGIONAL OFFICE IX
G
DESIGNED:
A A
P Y S
DE
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN) CHB WALL ELEVATION & TYP. LINTEL BEAM DETAILS ENGINEER IV DISTRICT ENGINEER 21 47
CHB WALLSECTION MICHAEL D. TORINO CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: ENGINEER II DATE: DATE: DATE: DATE:
1
C1-F1 C1-F1 C1-F1 C1-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C1-F2 C1-F1 C1-F1 C1-F1
FTB-1 FTB-1 FTB-2 FTB-2 FTB-2 FTB-2 FTB-2 FTB-2 FTB-2 FTB-1 FTB-1
WF-2
WF-2
WF-2
WF-2
WF-2
WF-2
WF-2 WF-1 WF-2
FTB-2
FTB-2
FTB-2
FTB-2
FTB-2
FTB-2
FTB-2
WF-2
FTB-1
FTB-1
FTB-1
WF-2
WF-2 WF-2
WF-2 WF-2
WF-2
WF-2
WF-2 WF-2 WF-2 WF-2
C2-F2A
WF-2
WF-2 WF-2 C1-F2A
WF-2
C1-F1 C1-F1 C1-F2A C1-F1 C1-F1
FTB-2 FTB-2 C2-F2A C2-F2A C2-F2A C2-F2A WF-2
100mm THK R.C. SLAB ON FILL WITH FTB-1
WF-2 10mmØ TEMP. BARS SPACED @ 0.40m O.C.
BOTH WAYS PROVIDE 100mm THK
WF-2
FTB-2 FTB-2 FTB-2
WF-2
FTB-1 WELL COMPACTED GRAVEL BED.
WF-2 WF-2
WF-2 WF-2 FTB-3
FTB-3 FTB-3 FTB-3 FTB-3 WF-2 WF-2
FTB-1
FTB-1
WF-2
WF-2 WF-2
FTB-1
FTB-1
WF-1
SC1-PDC1-F3 SC1-PDC1-F3 WF-2 WF-2
SC1-PDC1-F4 SC1-PDC1-F4 SC1-PDC1-F4 SC1-PDC1-F4
C1-F1 C1-F1 C1-F1
C1-F1 C1-F1 C1-F1
FTB-1 FTB-1 FTB-1 FTB-1
FTB-1
FTB-1
WF-2
FTB-5
FTB-5
FTB-4
FTB-4
FTB-4
FTB-4
FTB-1
FTB-1
WF-2
WF-2
WF-2
WF-2
C1-F1 C1-F1 C1-F1 C1-F1 C1-F1
FTB-1 FTB-1
FTB-1 FTB-1
C1-F1
FTB-1
FTB-1
FTB-1
FTB-1
C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2
FTB-3
FTB-3 FTB-3 FTB-3 FTB-3
C1-F1 C1-F1 C1-F1 C1-F1
FTB-1 FTB-1
125mm THK R.C. SLAB ON FILL WITH
10mmØ TEMP. BARS SPACED @ 0.40m O.C.
BOTH WAYS PROVIDE 100mm THK
FTB-1
FTB-1
FTB-1
FTB-1
WELL COMPACTED GRAVEL BED.
FTB-5
FTB-5
FTB-4
FTB-4
FTB-4
FTB-4
100mm THK R.C. SLAB ON FILL WITH 100mm THK R.C. SLAB ON FILL WITH
10mmØ TEMP. BARS SPACED @ 0.40m O.C. 10mmØ TEMP. BARS SPACED @ 0.40m O.C.
C1-F1 BOTH WAYS PROVIDE 100mm THK C1-F1 C1-F1 BOTH WAYS PROVIDE 100mm THK C1-F1
WELL COMPACTED GRAVEL BED. WELL COMPACTED GRAVEL BED.
FTB-1 FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
SC1-PDC1-F4 SC1-PDC1-F4 SC1-PDC1-F4 SC1-PDC1-F4
SC1-PDC1-F3 SC1-PDC1-F3
C1-F1 C1-F1
0.15
C1-F1 C1-F1 C1-F1 C1-F1
0.15
FTB-1 FTB-1 FTB-3 FTB-3 FTB-3 FTB-3 FTB-3 FTB-1 FTB-1
C3-F5 C3-F5
IMPORTANT NOTE:
IN CASE THE ACTUAL SITE LOCATION/CONDITION IS FOUND NOT
IN ACCORDANCE WITH THE ASSUMED MAXIMUM WIND VELOCITY OF
340 KPH (ALONG EASTERN SEABOARD), SEISMIC SOURCE WITHIN
2 KM AND SOIL BEARING CAPACITY OF 96 KPA, THE STRUCTURAL
DESIGNER/ENGINEER SHALL BE NOTIFIED IN WRITING FOR
PROPER REVISION OF THE STRUCTURAL PLAN.
PROJECT & LOCATION: SHEET CONTENT: CAD ENCODED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
I C
FOUNDATION PLAN
PROPOSED CONSTRUCTION OF
WO
BL R
U K
P
A N
S - 04
E
H I
TM
REGIONAL OFFICE IX
G
DESIGNED:
A A
P Y S
DE
7-25mmØ
EACH WAYS
PLAN FOOTING 3
IMPORTANT NOTE:
IN CASE THE ACTUAL SITE LOCATION/CONDITION IS FOUND NOT
IN ACCORDANCE WITH THE ASSUMED MAXIMUM WIND VELOCITY OF
340 KPH (ALONG EASTERN SEABOARD), SEISMIC SOURCE WITHIN
2 KM AND SOIL BEARING CAPACITY OF 96 KPA, THE STRUCTURAL
DESIGNER/ENGINEER SHALL BE NOTIFIED IN WRITING FOR
PLAN FOOTING 4 @ GRID - A PLAN FOOTING 4 @ GRID - B PROPER REVISION OF THE STRUCTURAL PLAN.
PROJECT & LOCATION: SHEET CONTENT: CAD ENCODED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
I C
FOOTING DETAILS
PROPOSED CONSTRUCTION OF
WO
BL R
U K
P
A N
S - 05
E
H I
TM
REGIONAL OFFICE IX
G
DESIGNED:
A A
P Y S
DE
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN) ENGINEER IV DISTRICT ENGINEER 23 47
MICHAEL D. TORINO CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: ENGINEER II DATE: DATE: DATE: DATE:
8-16mmØ 7-20mmØ 7-20mmØ
EACH WAYS Y-Bars EACH WAYS Y-Bars EACH WAYS Y-Bars
X-Bars X-Bars X-Bars
7-20mmØ 7-20mmØ
EACH WAYS EACH WAYS
8-16mmØ
EACH WAYS
PLAN FOOTING 2 PLAN FOOTING 2A
COLUMN SCHEDULE
PLAN FOOTING 1
PROJECT & LOCATION: SHEET CONTENT: CAD ENCODED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
I C
FOOTING DETAILS
PROPOSED CONSTRUCTION OF
WO
BL R
U K
A N
H I
TM
REGIONAL OFFICE IX
G
DESIGNED:
A
COLUMN SCHEDULE
P A
Y S
DE
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN) ENGINEER IV DISTRICT ENGINEER 24 47
MICHAEL D. TORINO CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: ENGINEER II DATE: DATE: DATE: DATE:
1
G-3 HT-1 G-3 G-1A G-1A G-1A G-1A G-1A G-3 HT-1 G-3
12mmØ STEEL SAGRODS @
THIRD POINT (STAGGERED)
*G1A
*G1A
*G1A
*G1A
*G1A
*G1A
*G1A
L75X75X5mm SEAT ANGLE
ST-3
ST-3
G-1
G-1
G-1
G-1
WITH 12mmØ ANCHOR
BOLT SPACED @
600mm O.C.
16mmØ STEEL CROSS BRACING
G-1A G-1A G-1A WITH STD. TURNBUCKLES G-1A G-1A
G-3 G-3 G-3 G-3
ST-3
ST-3
G-2
G-2
G-2
G-2
CHANNEL PURLINS @ 600mm O.C. WITH
1L-75X50X6MM THK. CLIP ANGLE
*CG1A
*CG1A
CG1A
ST-3: HSS 150X50X4mm
TUBULAR STRUTS
G-3 G-3 (TYPICAL) G-3 G-3
HT-1 G-1A G-1A HT-1
12mmØ STEEL SAGRODS @
THIRD POINT (STAGGERED) L75X75X5mm SEAT ANGLE
WITH 12mmØ ANCHOR
ST-3
ST-3
BOLT SPACED @
*G1A
*G1A
G-2
G-2
G-2
G-2
G-1A
600mm O.C.
LC 175X50X20X2mm THK. STEEL LIGHT GAUGE
CHANNEL PURLINS @ 600mm O.C. WITH
1L-75X50X6MM THK. CLIP ANGLE
G-2A G-2A
*CG1A
*CG1A
G-3 G-3 G-3 G-3
CG1A
HT-1 HT-1
12mmØ STEEL SAGRODS @
THIRD POINT (STAGGERED)
LC 175X50X20X2mm THK. STEEL LIGHT GAUGE
ST-3
ST-3
G-2
G-2
G-2
G-2
CHANNEL PURLINS @ 600mm O.C. WITH
1L-75X50X6MM THK. CLIP ANGLE
16mmØ STEEL CROSS BRACING
WITH STD. TURNBUCKLES ST-3: HSS 150X50X4mm
TUBULAR STRUTS
LEGEND: (TYPICAL)
* - INCLINED BEAM
G-3 HT-1 G-3 (SEE FRAME ELEVATION) G-3 HT-1 G-3
ST-3
CHANNEL PURLINS @ 600mm O.C. WITH
G-2
G-2
G-2
G-2
1L-75X50X6MM THK. CLIP ANGLE
ST-3
16mmØ STEEL CROSS BRACING
G-2
G-2
G-2
G-2
WITH STD. TURNBUCKLES
IMPORTANT NOTE:
IN CASE THE ACTUAL SITE LOCATION/CONDITION IS FOUND NOT
IN ACCORDANCE WITH THE ASSUMED MAXIMUM WIND VELOCITY OF
340 KPH (ALONG EASTERN SEABOARD), SEISMIC SOURCE WITHIN
2 KM AND SOIL BEARING CAPACITY OF 96 KPA, THE STRUCTURAL
DESIGNER/ENGINEER SHALL BE NOTIFIED IN WRITING FOR
PROPER REVISION OF THE STRUCTURAL PLAN.
PROJECT & LOCATION: SHEET CONTENT: CAD ENCODED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
BL
I C WO
ROOF FRAMING PLAN
U R
K
P
A N
H I
TM
REGIONAL OFFICE IX
G
R
DESIGNED:
A A
P
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV
ENGINEER IV DISTRICT ENGINEER 25 47
MICHAEL D. TORINO CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DATE: ENGINEER II DATE: DATE: DATE: DATE:
SCHEDULE OF R.C. BEAMS
G-1/G-1A
CG-1A
G-2/G-2A
G-3
IMPORTANT NOTE:
IN CASE THE ACTUAL SITE LOCATION/CONDITION IS FOUND NOT
IN ACCORDANCE WITH THE ASSUMED MAXIMUM WIND VELOCITY OF
340 KPH (ALONG EASTERN SEABOARD), SEISMIC SOURCE WITHIN
2 KM AND SOIL BEARING CAPACITY OF 96 KPA, THE STRUCTURAL
DESIGNER/ENGINEER SHALL BE NOTIFIED IN WRITING FOR
PROPER REVISION OF THE STRUCTURAL PLAN.
PROJECT & LOCATION: SHEET CONTENT: CAD ENCODED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
I C
DETAILS OF HT-1
PROPOSED CONSTRUCTION OF
WO
BL R
U K
A N
H I
TM
REGIONAL OFFICE IX
G
DESIGNED:
A A
P Y S
DE
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN) ENGINEER IV DISTRICT ENGINEER 26 47
MICHAEL D. TORINO CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: ENGINEER II DATE: DATE: DATE: DATE:
1
1 2 3 4
NOTE:
THICKNESS OF GUSSET
CONNECTION PLATE SHALL NOT BE
LESS THAN CONNECTION
THICKNESS OF CONNECTED
ELEMENT (WHICHEVER IS GREATER)
PROJECT & LOCATION: SHEET CONTENT: CAD ENCODED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
I C
ROOF FRAMING PLAN
PROPOSED CONSTRUCTION OF
WO
BL R
U K
TRUSS DIAGRAM
P
A N
H I
TM
REGIONAL OFFICE IX
G
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN) ST1 AND ST2 DIAGRAM ENGINEER IV DISTRICT ENGINEER 27 47
MICHAEL D. TORINO CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: ENGINEER II DATE: DATE: DATE: DATE:
IMPORTANT NOTE:
IN CASE THE ACTUAL SITE LOCATION/CONDITION IS FOUND NOT
IN ACCORDANCE WITH THE ASSUMED MAXIMUM WIND VELOCITY OF
340 KPH (ALONG EASTERN SEABOARD), SEISMIC SOURCE WITHIN
2 KM AND SOIL BEARING CAPACITY OF 96 KPA, THE STRUCTURAL
DESIGNER/ENGINEER SHALL BE NOTIFIED IN WRITING FOR
PROPER REVISION OF THE STRUCTURAL PLAN.
PROJECT & LOCATION: SHEET CONTENT: CAD ENCODED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
I C
STEEL SECTION DETAILS
PROPOSED CONSTRUCTION OF
WO
BL R
U K
TRUSS TO RG CONNECTION
P
A N
H I
TM
REGIONAL OFFICE IX
G
DESIGNED:
A A
P Y S
DE
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN) BASE PLATE DETAILS ENGINEER IV DISTRICT ENGINEER 28 47
ZAMBOANGA PENINSULA FRAME ELEVATION AT TRAINING ARE MICHAEL D. TORINO CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
NOTE2: PRE-WELDED
STIFFENER
PLATESSHALLMATCH
COLUMNS WEB THICKNESS BE MINIMUM OF 12MM THK.
NOTE1: GUSSETPLATEDIMENSION
SHALLBE DICTATED
BY MINIMUM REQUIRED LENGTH OF WELD.
PROJECT & LOCATION: SHEET CONTENT: CAD ENCODED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
I C
TYP. SAGROD CON N. DETAIL
PROPOSED CONSTRUCTION OF
WO
BL R
U K
SECTION
P
A N
H I
TM
REGIONAL OFFICE IX
G
DESIGNED:
A
DETAILS
P A
Y S
DE
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN) ANGULAR BUCKLE DETAILS ENGINEER IV DISTRICT ENGINEER 29 47
ZAMBOANGA PENINSULA STRUT DETAILS MICHAEL D. TORINO CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
TR1 - W8x35
X-Bars
ELEVATION
NGL
DETAILS A
PLAN
8-16mmØ
EACH WAYS
NGL
PLAN FOOTING 5
ELEVATION
PROJECT & LOCATION: SHEET CONTENT: CAD ENCODED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
I C
ENTRANCE ROOFING PLAN & DETAILS
PROPOSED CONSTRUCTION OF
WO
BL R
U K
FOOTING 5
P
A N
H I
TM
REGIONAL OFFICE IX
G
DESIGNED:
A
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN) ENGINEER IV DISTRICT ENGINEER 30 47
MICHAEL D. TORINO CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA
DATE: ENGINEER II DATE: DATE: DATE: DATE:
3' 2' 1' 1 3 4 5 6 7 7' 8' 9'
3.98
50.02
s t u w x c d d
Syz Swx y z a a b b c Sab Scd
C Sstu
q
j j
STO./ Sabc Sde
c
S4-5 S1-2-3
b
C
o o JAN. LPA up k
up
o C-4 a b BACKSTAGE d e k h h e
C-2
S LPA AREA
e e f f EF TOILET C-3 S LPA PRAYER e e f f
Sqr Shi Sfg LPA EF
CLINIC ROOM
TOILET (HE)
(SHE) k k h h f f TOILET
e f r p p k (SHE) j j g g d
a e f
TOILET & BATH 1 2 3 4 5
1.97
r EF EF i f EF EF e
(HE) (HE) (SHE) TOILET
1.63
Sop Sjkl EF
EXISTING STAGE/ (HE) STO. TOILET & BATH
EF Sab
EF
TRAINING AREA 1.91 C-1 (SHE)
m Smn n 1.08
LPA
l l
i i g g S c
EF i i f f
1 2 3 4 5
c c d d Sijk Sfgh Scde c c d d
B' B'
1.75
Sab S2(6-7) S2(8-9) Scd
1.88 2.12
1.35
1.35
a b c d e
q
1.97
B Sef
Scd
1 2 3 4 5
B
Sab Sst s c
a b a b
EF EF Scde Sef EF EF
3.25
3.25
Scd
a a b b Sab a a b b
6.83 C-4
C-4 C-6 LPC
2.12 LPA
LPB
p 6
CONJUGAL
g Sefg
ROOM-1
Sgh i k
DELIVERY/
FEEDING RM.
CONJUGAL
Smno SERVICE AREA
ROOM-2
BREAST
5.35
4.80
Spqr
4.80
t d
S S Sij
h
KITCHEN S f
Sjk
o j j j
g j C-3
WET STO. DRY STO. LPC S
Sghi
28.90
28.90
F' Smn 2.60
F'
7 7 7 7 7
C-2 f f f
n LPB n n
PLAY
n
AREA g
4.80
4.80
u e
e e e
1.70
Sdef
d d d
m m m
E' m
C-5
LPA g
E'
c c c
l l l
8 8 8 8 8
MESS HALL STORAGE
Skl
4.80
4.80
v f
b b b
S2abc S2abc Sh
k k k C-2
l LPC h
a a a
D' s
C-1
LPB
q o
RECORD ELEC. D'
c d ROOM RM.
LPC
Sjkl S
C-1 LPD
Sfg Scd LPC
9 9 9 9 9 Sef MDP
4.55
4.55
k
RECEPTION
w g ADMIN. i
AREA C-5 OFFICE Sij
LPC
Sqrs
Snop a b
r p n e f Sab
S2(8-9)
S2(6-7) CONSULT.
A Suvw
Sghi Sdef Sabc
ROOM
A
j g g h i i f e d c c b a a j
A' A'
f e d
LIGHTING LAYOUT
SCALE 1:100 MTS
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NO.:
B
L I C WO
R
LIGHTING LAYOUT
REPUBLIC OF THE PHILIPPINES
U K
P
PROPOSED
S
O F
A N
H I
REGIONAL OFFICE IX
T
G
R
W
A A
P Y S
D E
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY MULTI-PURPOSE COVERED COURT JOCELYN T. BRUCES PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN)
ENGINEER II ENGINEER IV DISTRICT ENGINEER 31 47
REGISTERED ELECTRICAL ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
C wp C-7
C
STO./ LPA LPA C-9
LPA
JAN. BACKSTAGE
TOILET AREA GFCI
TOILET (HE) CLINIC PRAYER
TOILET
(SHE) (SHE) ROOM STO.
TOILET & BATH
(HE) (HE) (SHE) Countertop
wp
EXISTING STAGE/ wp
Receptacle TOILET & BATH
TRAINING AREA TOILET (SHE)
wp (HE)
GFCI
B' B'
up up
1.35
1.35
C-8
B LPA B
wp wp
3.25
3.25
G' LPB ref R
F G'
C-7 C-8 C-10
LPB LPB LPD F
C-6 C-6
LPB LPD
CONJUGAL
KITCHEN
GFCI ROOM-1
4.80
4.80
Countertop
Receptacle
BREAST CONJUGAL C-9
WET STO. DRY STO. FEEDING RM. ROOM-2 wp
LPC
GFCI
wp
28.90
28.90
F' F
C-9 C-5
F
F'
C-5 LPD LPD
LPB
PLAY
4.80
4.80
AREA
E' F
C-4
F
E'
C-8
LPD LPD
MESS HALL
4.80
4.80
STORAGE
D' F C-7
LPD C-3
F
C-8 ELEC. D'
LPD
LPC RM.
C-7 LPC
LPC
RECORD LPD
ROOM GFCI
MDP
4.45
RECEPTION ADMIN.
AREA OFFICE
CONSULT.
ROOM C-2
LPD
C-1 C-6
LPD LPC
A ACU
ACU
A' A'
POWER LAYOUT
SCALE 1:100 MTS
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NO.:
B
L I C WO
R
POWER LAYOUT
REPUBLIC OF THE PHILIPPINES
U K
P
PROPOSED
S
O F
A N
H I
REGIONAL OFFICE IX
T
G
R
W
A A
P Y S
D E
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY MULTI-PURPOSE COVERED COURT JOCELYN T. BRUCES PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN)
ENGINEER II ENGINEER IV DISTRICT ENGINEER 32 47
REGISTERED ELECTRICAL ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
C F
C
STO./
LPA up
SD
up
JAN. BACKSTAGE
TOILET AREA PRAYER
TOILET (HE) CLINIC ROOM SD
(SHE) TOILET SD SD
STO.
(SHE)
TOILET & BATH
(HE) (HE) (SHE) TOILET TOILET & BATH
EXISTING STAGE/ (HE)
TRAINING AREA (SHE)
B' F B'
up up
1.35
1.35
B B
3.25
3.25
G' LPB G'
CONJUGAL
ROOM-1
SD
DELIVERY/
FEEDING RM.
SD
CONJUGAL
F SERVICE AREA
ROOM-2
BREAST
4.80
4.80
SD
KITCHEN
SD
28.90
F' F'
SD
4.80
4.80
SD SD
PLAY
SD
AREA
E' E'
MESS HALL
SD
STORAGE
4.80
4.80
SD SD
SD
SD
SD
RECEPTION SD
F
SD
ADMIN.
AREA OFFICE
SD
CONSULT.
ROOM
F
A' A'
AUXILIARY LAYOUT
SCALE 1:100 MTS
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NO.:
B
L I C WO
R
THIRD FLOOR LIGHTING LAYOUT
REPUBLIC OF THE PHILIPPINES
U K
P
PROPOSED
S
O F
A N
H I
REGIONAL OFFICE IX
T
G
R
W
A A
P Y S
D E
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY MULTI-PURPOSE COVERED COURT JOCELYN T. BRUCES PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN)
ENGINEER II ENGINEER IV DISTRICT ENGINEER 33 47
REGISTERED ELECTRICAL ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
2. THE ELECTRICAL WORKS SHALL BE UNDER THE SUPERVISION OF A DULY PROFESSIONAL 33 Watts SMARTPANEL VOICE/DATA OUTLET
ELECTRICAL ENGINEER (PEE) OR REGISTERED ELECTRICAL ENGINEER (REE). LED LUMINAIRE
3. POWER SERVICES OF THE BUILDING SHALL BE 230 V, SINGLE PHASE, 60 HZ, WITH PROPER SERENO TBS 528/869, 2 x TL5-14 Watts
CONDUIT MOUNTING.
( PHILIPS ) LIGHTING FIXTURES SD SMOKE DETECTOR
5. ALL WIRES SHALL BE COPPER AND THERMOPLASTIC HEAT RESISTANT, MOISTURE AND CORELINE HIGHBAY,155 WATTS LED
HEAT RESISTANT INSULATED TYPE ,"THW/THHN" UNLESS OTHERWISE INDICATED IN THE FACP FIRE ALARM CONTROL PANEL
PLAN. THE MINIMUMS SIZES OF WIRE SHALL BE 3.5 mm² THW.
LIGHTING FIXTURE ( PHILIPS )
6. ALL LIGHTING CIRCUIT HOMERUN AND CONVENIENCE OUTLET SHALL BE WIRED WITH
LUX SPACE GEN III, 12 WATTS or 8.5
NOT LESS THAN 3.5 mm² THW/THHN IN SIZE UNLESS OTHERWISE INDICATED IN THE PLAN. FIRE ALARM BELL
WATTS LED DOWNLIGHTS ( SEE LOAD
7. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND APPROVED TYPE FOR THE
SCHEDULE)
PARTICULAR LOCATION AND PURPOSE USAGE.
8. GROUNDING SYSTEM SHALL BE PROVIDED TO ALL LIGHTING AND POWER CIRCUIT AS PER SURFACE MOUNTED, 13 WATTS LED
PHILIPPINE ELECTRICAL CODE REQUIREMENT. RACEWAY CONDUIT CONCEALED ON
DOWNLIGHTS
CEILING
9. MOUNTING HEIGHT OF WIRING DEVICES SHALL BE AS FOLLOWS:
a. LIGHT SWITCH - 1.20 M ABOVE FINISH FLOOR LINE WALL LIGHTING FIXTURES ( SEE LOAD
b. CONVENIENCE OUTLET - 0.30 M ABOVE FINISH FLOOR LINE RACEWAY CONDUIT CONCEALED UNDER
SCHEDULE FOR LIGHTS DETAIL WATTAGE )
c. PANEL BOARD - 1.50 M ABOVE FINISH FLOOR LINE THE FLOOR OR GROUND
d. COUNTER TOP OUTLETS - 0.15 M ABOVE WORKING TABLE
e. AIRCON UNIT - AT CONVENIENT HEIGHT NEAR EQUIPMENT
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NO.:
B
L I C WO
R
GENERAL NOTES
REPUBLIC OF THE PHILIPPINES
U K
P
PROPOSED
S
O F
LEGENDS
A N
H I
REGIONAL OFFICE IX
T
G
R
W
A A
P Y S
D E
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY MULTI-PURPOSE COVERED COURT JOCELYN T. BRUCES PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN)
ENGINEER II ENGINEER IV DISTRICT ENGINEER 34 47
REGISTERED ELECTRICAL ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
PANELBOARD NO. (LP-A) LOCATION : BACK STAGE AREA PANELBOARD NO. (LP-B) LOCATION : KITCHEN AREA PANELBOARD NO. (LP-C) LOCATION : ELECTRICAL ROOM
VOLTS VOLT-AMPERE AMPERE BREAKER RATING VOLTS VOLT-AMPERE AMPERE BREAKER RATING VOLTS VOLT-AMPERE AMPERE BREAKER RATING
CKT. NO DESCRIPTION SIZE OF WIRE SIZE OF CONDUIT CKT. NO DESCRIPTION SIZE OF WIRE SIZE OF CONDUIT CKT. NO DESCRIPTION SIZE OF WIRE SIZE OF CONDUIT
(V) (VA) (A) AT AF POLE (V) (VA) (A) AT AF POLE (V) (VA) (A) AT AF POLE
9 - SERENO TBS 528/869, 2 x TL5-14 Watts ( PHILIPS ) LIGHTING 6 - 33 WATTS SMARTPANEL LED ( PHILIPS ) LIGHTING FIXTURES 8 - SERENO TBS 528/869, 2 x TL5-14 Watts ( PHILIPS ) LIGHTING
1 FIXTURES 230 636.00 2.77 15 15 2 2 - 3.5 mm ² THW/THHN 15 mm Ø PVC 1 16 - LUX SPACE GEN III, 12 WATTS LED DOWNLIGHTS 230 533.33 2.32 15 15 2 2 - 3.5 mm ² THW/THHN 15 mm Ø PVC 1 FIXTURES 230 798.67 3.47 15 15 2 2 - 3.5 mm ² THW/THHN 15 mm Ø PVC
3 - EMERGENCY LIGHT 1 - EMERGENCY LIGHT 5 - EMERGENCY LIGHT
27 - LUX SPACE GEN III, 8.5 WATTS LED DOWNLIGHTS 12 - SMARTBRIGHT LED WATERPROOF BATTEN FIXTURE, 13 12 - SMARTBRIGHT LED WATERPROOF BATTEN FIXTURE, 13
1 - 15 WATTS WALL LIGHTS (LED) WATTS WATTS
4 230 1255.00 5.46 15 15 2 2 - 3.5 mm ² THW/THHN 15 mm Ø PVC 4 230 1053.33 4.58 15 15 2 2 - 3.5 mm ² THW/THHN 15 mm Ø PVC 4 230 1053.33 4.58 15 15 2 2 - 3.5 mm ² THW/THHN 15 mm Ø PVC
6 - EMERGENCY LIGHT 4 - EMERGENCY LIGHT 4 - EMERGENCY LIGHT
4 - EXHAUST FAN ( CEILING MOUNTED ) 4 - EXHAUST FAN ( CEILING MOUNTED ) 4 - EXHAUST FAN ( CEILING MOUNTED )
10 - CORELINE HIGHBAY,155 WATTS LED LIGHTING FIXTURE 6 - LUX SPACE GEN III, 12 WATTS LED DOWNLIGHTS
5 230 1722.22 7.49 20 20 2 2 - 3.5 mm ² THW/THHN 15 mm Ø PVC 15 - SURFACE MOUNTED, 13 WATTS LED DOWNLIGHTS
( PHILIPS ) 5 5 - DUPLEX CONVENIENCE OUTLET 230 1800.00 7.83 20 20 2 2 - 3.5 mm ² THW/THHN 15 mm Ø PVC 5 230 413.33 1.80 15 15 2 2 - 3.5 mm ² THW/THHN 15 mm Ø PVC
1 - 15 WATTS WALL LIGHTS (LED)
1 - EMERGENCY LIGHT
10 - CORELINE HIGHBAY,155 WATTS LED LIGHTING FIXTURE
6 230 1722.22 7.49 20 20 2 2 - 3.5 mm ² THW/THHN 15 mm Ø PVC
( PHILIPS ) 2 - DUPLEX CONVENIENCE OUTLET WITH GROUND FAULT 1 - DUPLEX CONVENIENCE OUTLET WITH GROUND FAULT
6 CIRCUIT INTERRUPTER (GFCI) 230 1440.00 6.26 20 20 2 2 - 3.5 mm ² THW/THHN 15 mm Ø PVC 6 CIRCUIT INTERRUPTER (GFCI) 230 1440.00 6.26 20 20 2 2 - 3.5 mm ² THW/THHN 15 mm Ø PVC
2 - DUPLEX CONVENIENCE OUTLET 3 - DUPLEX CONVENIENCE OUTLET
3 - DUPLEX CONVENIENCE OUTLET
7 230 1800.00 7.83 20 20 2 2 - 3.5 mm ² THW/THHN 15 mm Ø PVC
2 - WEATHERPROOF OUTLET
7 5 - DUPLEX CONVENIENCE OUTLET 230 1800.00 7.83 20 20 2 2 - 3.5 mm ² THW/THHN 15 mm Ø PVC
1 - DUPLEX CONVENIENCE OUTLET, EXCLUSIVE FOR REF
2 - DUPLEX CONVENIENCE OUTLET WITH GROUND FAULT 7 230 1500.00 6.52 20 20 2 2 - 3.5 mm ² THW/THHN 15 mm Ø PVC
APPLIANCE
8 CIRCUIT INTERRUPTER (GFCI) 230 1800.00 7.83 20 20 2 2 - 3.5 mm ² THW/THHN 15 mm Ø PVC
3 - WEATHERPROOF OUTLET 5 - DUPLEX CONVENIENCE OUTLET
8 230 2160.00 9.39 20 20 2 2 - 3.5 mm ² THW/THHN 15 mm Ø PVC
1 - WEATHERPROOF OUTLET
8 1 - ELECTRIC RANGE OUTLET ( 8 KW ), @ 80% DEMAND FACTOR 230 8000.00 27.83 40 50 2 2 - 5.5 mm ² THW/THHN 15 mm Ø PVC
9 5 - DUPLEX CONVENIENCE OUTLET 230 1800.00 7.83 20 20 2 2 - 3.5 mm ² THW/THHN 15 mm Ø PVC
5 - DUPLEX CONVENIENCE OUTLET
9 230 2160.00 9.39 20 20 2 2 - 3.5 mm ² THW/THHN 15 mm Ø PVC
1 - WEATHERPROOF OUTLET
9 SPARE 230 1500.00 6.52
10 SPARE 230 1500.00 6.52
10 SPARE 230 1500.00 6.52
TOTAL 13828.33 60.15 10 SPACE
TOTAL 12808.66 55.68
TOTAL 17532.22 69.27
M AIN CIRCUIT BREAKER : 100 AT, 100 AF, 2P, 10 kA
WIRE SIZE: 48.12 X 1.25 = 60.15 A Icn, 240 V, 60 Hz, Homeline Circuit Breaker, CENTER M AIN CIRCUIT BREAKER : 100 AT, 100 AF, 2P, 10 kA
MAIN in a NEMA Type 1 Enclosure M AIN CIRCUIT BREAKER : 100 AT, 100 AF, 2P, 10 kA WIRE SIZE: 44.64 X 1.25 = 55.80 A Icn, 240 V, 60 Hz, Homeline Circuit Breaker, CENTER
WIRE SIZE: 55.416 X 1.25 = 69.27 A Icn, 240 V, 60 Hz, Homeline Circuit Breaker, CENTER MAIN in a NEMA Type 1 Enclosure
MAIN in a NEMA Type 1 Enclosure
LOAD SCHEDULE
DESIGN COMPUTATION
PANELBOARD NO. (LP-D) LOCATION : ELECTRICAL ROOM PANELBOARD NO. MAIN DISTRIBUTION PANEL ( MDP ) LOCATION : ELECTRICAL ROOM
VOLTS VOLT-AMPERE AMPERE BREAKER RATING VOLTS VOLT-AMPERE AMPERE BREAKER RATING
CKT. NO DESCRIPTION
(V) (VA) (A) AT AF POLE
SIZE OF WIRE SIZE OF CONDUIT CKT. NO DESCRIPTION
(V) (VA) (A) AT AF POLE
SIZE OF WIRE SIZE OF CONDUIT
NOTES:
1 1 - 2 HP, AIRCONDITIONING UNIT (WINDOW OR SPLIT TYPE) 230 2760.00 12.00 30 30 2 2 - 5.5 mm ² THW/THHN 15 mm Ø PVC 1 LP-A 230 13828.33 60.15 100 100 2 2 - 30 mm ² THW/THHN 25 mm Ø PVC - ALL WORKS DESCRIBED HEREIN SHALL BE EXECUTED IN
ACCORDANCE TO THE LATEST PHILIPPINE ELECTRICAL CODE
2 1 - 2 HP, AIRCONDITIONING UNIT (WINDOW OR SPLIT TYPE) 230 2760.00 12.00 30 30 2 2 - 5.5 mm ² THW/THHN 15 mm Ø PVC 2 LP-B 230 17532.22 69.27 100 100 2 2 - 30 mm ² THW/THHN 25 mm Ø PVC
AND APPLICABLE LAWS, ORDINANCES,
3
1 - FLOOR POP UP CONVENIENCE OUTLET, FOR HEAVY DUTY
ELECTRICAL LOAD 230 1080.00 4.70 30 30 2 2 - 5.5 mm ² THW/THHN 15 mm Ø PVC 3 LP-C 230 12808.66 55.68 100 100 2 2 - 30 mm ² THW/THHN 25 mm Ø PVC
RULES AND REGULATIONS.
- ALL LIGHTING FIXTURES COMES WITH SPECIFIC DISTANCE
1 - FLOOR POP UP CONVENIENCE OUTLET, FOR HEAVY DUTY
4 ELECTRICAL LOAD 230 1080.00 4.70 30 30 2 2 - 5.5 mm ² THW/THHN 15 mm Ø PVC 4 LP-D 230 14160.00 61.60 100 100 2 2 - 30 mm ² THW/THHN 25 mm Ø PVC FOR EVERY FLOOR AS TO PROPER DISTRIBUTION OF
1 - FLOOR POP UP CONVENIENCE OUTLET, FOR HEAVY DUTY
ILLUMINATION;
5 ELECTRICAL LOAD 230 1080.00 4.70 30 30 2 2 - 5.5 mm ² THW/THHN 15 mm Ø PVC 5 SPARE 230 1500.00 6.52
- ALL LIGHTS FROM WALLS AND WINDOWS SHALL HAVE A
6
1 - FLOOR POP UP CONVENIENCE OUTLET, FOR HEAVY DUTY
ELECTRICAL LOAD 230 1080.00 4.70 30 30 2 2 - 5.5 mm ² THW/THHN 15 mm Ø PVC 6 SPARE 230 1500.00 6.52
DISTANCE OF 0.60 METERS AWAY, SEE PLAN FOR OTHER
1 - FLOOR POP UP CONVENIENCE OUTLET, FOR HEAVY DUTY TOTAL 61329.21 259.74
DETAILS OF DISTANCES FOR EVERY LIGHTS.
7 230 1080.00 4.70 30 30 2 2 - 5.5 mm ² THW/THHN 15 mm Ø PVC
ELECTRICAL LOAD
MAIN FEEDER SIZE: @ 80% D.F. M AIN CIRCUIT BREAKER : 400 AT, 400 AF, 3P, 40 kAIC,
- ALL FINISHING MATERIALS SPECIFIED HERE-IN SHALL BE OF
1 - FLOOR POP UP CONVENIENCE OUTLET, FOR HEAVY DUTY
It = (0.8 x 259.74) + (25% x 12 )= 210.792 Amp.
8 ELECTRICAL LOAD 230 1080.00 4.70 30 30 2 2 - 5.5 mm ² THW/THHN 15 mm Ø PVC
WIRE SIZE: 210.792 x 1.25 = 263.49 Amp.
230 V, 60 Hz, MOLDED CASE Circuit Breaker, CENTER
MAIN in a NEMA 3R ENCLOSURE
APPROVED TYPE SUPERIOR QUALITY ELEGANT TYPE AND
9
1 - FLOOR POP UP CONVENIENCE OUTLET, FOR HEAVY DUTY
ELECTRICAL LOAD
230 1080.00 4.70 30 30 2 2 - 5.5 mm ² THW/THHN 15 mm Ø PVC
Note: Tap Electrical Line to Power House
SHALL BE PRE-APPROVED PRIOR TO INSTALLATION,
1 - FLOOR POP UP CONVENIENCE OUTLET, FOR HEAVY DUTY
CONTRACTOR SHALL SUBMIT SAMPLES FOR ENGINEER'S/
10
ELECTRICAL LOAD
230 1080.00 4.70 30 30 2 2 - 5.5 mm ² THW/THHN 15 mm Ø PVC GENERATOR CAPACITY: GENERATOR FEEDER:
TOTAL 14160.00 61.60
KVA = {259.08 x 230 } / 1000 = 59.59 KVA IGF = 72 KVA x 1000
230V
DESIGNER'S APPROVAL.
USE: 72 KVA, 1PH, 230 V, 60Hz at 80% P.F. SILENT TYPE GENERATOR SET
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NO.:
B
L I C WO
R
LOAD SCHEDULE
REPUBLIC OF THE PHILIPPINES
U K
P
PROPOSED
S
O F
A N
H I
REGIONAL OFFICE IX
T
G
R
W
A A
P Y S
D E
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY MULTI-PURPOSE COVERED COURT JOCELYN T. BRUCES PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN)
ENGINEER II ENGINEER IV DISTRICT ENGINEER 35 47
REGISTERED ELECTRICAL ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
LP-A LP-B
2 - 30 mm² 2 - 30 mm²
THW/THWN in THW/THWN in
25 mmɸ RSC 25 mmɸ RSC
100 AT 100 AT
C1 15 15 C2 C1 15 15 C2
C3 15 15 C4 C3 15 15 C4
C5 20 20 C6 C5 20 20 C6
C7 20 20 C8 C7 20 40 C8
GROUND GROUND
TERMINAL TERMINAL
BLOCK BLOCK
LP-C LP-D
2 - 30 mm² 2 - 30 mm²
THW/THWN in THW/THWN in
25 mmɸ RSC 25 mmɸ RSC
100 AT 100 AT
C1 15 15 C2 C1 30 30 C2
C3 15 15 C4 C3 30 30 C4
C5 15 20 C6 C5 30 30 C6
C7 C8 C7 C8
20
20
SPARE C9
30
30
30
30 C10
SCALE N.T.S.
GROUND GROUND
TERMINAL TERMINAL
BLOCK BLOCK
LEGEND:
GROUND 1 - 14 mm² GROUND 1 - 14 mm²
COPPER CLAD GROUND COPPER CLAD GROUND
THW in 20 mmØ PVC THW in 20 mmØ PVC
Zdu = Distribution Utility Impedance PIPE
ROD 20 mmØ x 3m
PIPE
ROD 20 mmØ x 3m
Zdu = 0.000075 Ω Ztr = Transformer Impedance
Zse = Service Entrance Impedance
Zfa = Feeder Line A Impedance
Zfb = Feeder Line B Impedance
Zfc = Feeder Line C Impedance
Zfd = Feeder Line D Impedance TAP TO MCCB
Ztr = 0.012 Ω
F1
LP-A 100 100 LP-B
AT AT
SPARE SPACE
F2 F3 F4 F5 GROUND 1 - 30 mm²
THW in 20 mmØ PVC
COPPER CLAD GROUND
ROD 20 mmØ x 3m
PIPE
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NO.:
B
L I C WO
R
SHORT CIRCUIT ANALYSIS
REPUBLIC OF THE PHILIPPINES
U K
P
PROPOSED
S
O F
H I
REGIONAL OFFICE IX
T
IMPEDANCE DIAGRAM
R
W
A A
P Y S
D E
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY MULTI-PURPOSE COVERED COURT JOCELYN T. BRUCES PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN)
SINGLE LINE DIAGRAM ENGINEER II ENGINEER IV DISTRICT ENGINEER 36 47
REGISTERED ELECTRICAL ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
TO POWER
SOURCE
250.00 300.00 250.00
250.00
Circuit Breaker, CENTER MAIN in a NEMA 3R
ENCLOSURE 135°HOOK 6 db 75 mm
Note: Inside Power House MCB
KwHr
25 mmɸ
THW (G)
300.00
800.00
PIPE
10 mmØ LATERAL TIES
1.80 MTRS. 1 @ 50 mm,
MDP LP-A LP-B LP-C LP-D 4 @ 100 mm,
1.50 MTRS
REST @ 200 mm
250.00
NGL
40.00 40.00
IMPORTANT: the white pigtail
BLACK from the GFCI MUST connect to
RED the Incoming Line Neutral Wire at
GFCI RECEPTACLE the Breaker panel or Sub-Panel.
The GFCI will not work without it.
WHITE
NEUTRAL
BAR
FROM ELECTRIC
HOT
SERVICE PANEL OR 10 mm ØLATERAL TIES 1@ 50 mm,
TEST BUTTON OTHER SOURCE
4 @ 100 mm, REST @ 200 mm
L
TAI
PIG
CI
GF
40 mm CONCRETE COVER
LOAD 2
NUETRAL RESET BUTTON GROUND RED
TO TEC REMOTE TEC REMOTE
LOAD NEUTRAL CONTROL EQUIPMENT Enclosure
WHITE
LOAD 1
BLACK
SD SD SD SD SD SD SD SD SD SD
600.00
825.00
5-12 mm Ø
BOTHWAYS
225.00
WIRE in 15 mm ɸ SD SD SD SD SD SD SD SD SD
PVC PIPE
100 mm THK
FIRE ALARM RISER DIAGRAM GRAVEL BEDDING
SCALE N.T.S.
THW WIRE in 15
mm ɸ PVC PIPE
SERVICE ENTRANCE CONCRETE POST DETAILS
WIRE in 20 mm ɸ FACP SCALE 1:10 M
PVC PIPE
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NO.:
B
L I C WO
R
FIRE ALARM RISER DIAGRAM
REPUBLIC OF THE PHILIPPINES
U K
P
PROPOSED
S
A N
H I
REGIONAL OFFICE IX
T
G
R
W
A A
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY MULTI-PURPOSE COVERED COURT JOCELYN T. BRUCES PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN)
INTERRUPTER (GFCI) DETAIL ENGINEER II ENGINEER IV DISTRICT ENGINEER 37 47
240 V GFCI WIRING DIAGRAM FOR REGISTERED ELECTRICAL ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DETAILS:
Lumen/Watt : 125 lm/Watts
Lifetime L70* : 50,000 hrs
DETAILS:
DETAILS:
Dimension ( in mm ): 1197(L) x 297(W) x 14/55(H)
Lumen/Watt : 1,000 lm / 12Watts, 640 lm / 8.5 Watts
Lumen/Watt : 2500 lm / 33 Watts
Lifetime L70* : 50,000 hrs
Lifetime L70* : 30,000 hrs
Installation : Recessed Mounting with Flexible spring clips
Louvre/Optics : Light Guide with diffuser
Lamp Color : Neutral White ( 4000K)
Driver Housing : Polycarbonated
Accessories : Suspension mounting kit
DETAILS:
Dimension ( in mm ): 595(L) x 295(W) x 47(H)
Lifetime L70* : 30,000 hrs DETAILS:
DETAILS:
Louvre/Optics : Micro Comfort OpticDriver Housing Dimension ( in mm ): 1135(L) x 823(W)
Lumen/Watt : 1,000 lm / 13Watts,
Installation : Recessed Type Lumen/Watt : 2000 lm / Watts
Lifetime L70* : 50,000 hrs
Lifetime L70* : 50,000 hrs
Installation : Surface Mounted Lamp
Louvre/Optics : Prismatic Cover
Color : Neutral White ( 4000K)
Lamp Color : Neutral White ( 4000K)
NOTES:
- ALL LIGHTING FIXTURES SPECIFIED HERE-IN SHALL BE OF APPROVED TYPE WALL LIGHTING FIXTURES
SUPERIOR QUALITY ELEGANT TYPE AND SHALL BE PRE-APPROVED PRIOR TO DETAILS:
INSTALLATION, CONTRACTOR SHALL SUBMIT SAMPLES FOR ENGINEER'S/ Lumen/Watt : 1,000 lm / 13Watts,
DESIGNER'S APPROVAL. Lifetime L70* : 50,000 hrs
Installation : Wall Mounted Lamp
- PENDANT LIGHTING FIXTURE SHALL BE APPROVED BY THE OWNER, SO THEY Color : Neutral White ( 4000K)
CAN CHOOSE THE DESIGN.
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NO.:
B
L I C WO
R
LUMINAIRES/LIGHTING FIXTURES
REPUBLIC OF THE PHILIPPINES
U K
P
PROPOSED DETAILS
S
O F
A N
H I
REGIONAL OFFICE IX
T
G
R
W
A A
P Y S
D E
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY MULTI-PURPOSE COVERED COURT JOCELYN T. BRUCES PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN)
ENGINEER II ENGINEER IV DISTRICT ENGINEER 38 47
REGISTERED ELECTRICAL ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
0.10
OF OTHER TRADES SHALL BE UPON THE APPROVAL OF SANITARY 75mm THK CONCRETE TOPPING
ENGINEER. WITH 10mm Ø RSB
3. ALL PIPES SHALL BE PROVIDED BY PROPER HANGER AND
SUPPORT.
4. ALL FIXTURES SHALL BE VENTED INDIVIDUALLY AND WATER LINES
100mm Ø PVC DRAIN PIPE
0.40
0.20
SHALL BE VALVE BY GROUP. ROOF LINE
5. ALL PLUMBING FITTINGS SHALL BE ACCESSIBLE FOR
MAINTENANCE. PROVIDE MANHOLE IF SUCH INSTALLATION ARE ROOF
INSIDE THE CEILING.
6. ALL CHANGES IN DIRECTION SHALL BE MADE BY THE
GUTTER
FLOOR CLEANOUT DETAIL
APPROPRIATE USE OF FORTY FIVE (45) WYE LONG SWEEP 100mm Ø PVC DRAIN PIPE
SCALE NTS
0.10
QUARTER BEND, ONE EIGHT WHEN THE CHANGE OF FLOW IS FROM 100mm Ø ELBOW
HORIZONTAL TO VERTICAL A SINGLE BEND COMBINATION MAY BE (90°BEND)
USED ONLY ON VENT PIPE.
7. NO DOUBLE HUB OR DOUBLE TEE BRANCH SHALL BE USED ON 75mm THK CONCRETE 100mm Ø ELBOW
HORIZONTAL SOIL AND WASTE LINES. COVER (90°BEND)
8. PROVIDE PIPE SLEEVES AT WALL, COLUMNS OR SLAB TO PROTECT
FROM BREAKAGE.
0.075
9. ALL SLOPES FROM HORIZONTAL DRAINAGE PIPES SHALL MAINTAIN 75mm THK CONCRETE TOPPING 100mm Ø PVC
1% UNLESS OTHERWISE SPECIFIED. WITH 10mm Ø RSB DOWNSPOUT
10. THE BRAND AND OTHER DETAILED PLUMBING FIXTURES SHALL BE FLOOR LINE
IN ACCORDANCE WITH THE SCHEDULE FURNISHED BY THE
ARCHITECT. PIPE SUPPORT
11. GATE VALVE SHALL BE BRONZE BODY, SOLID WEDGE TYPE, 10mmØ THK CHB (EVERY 1.50m)
SCREWED OR FLANGED END. WITH 10mm Ø RSB
0.40
12. USE UNPLASTICIZED POLYVINYL CHLORIDE (uPVC) FOR ALL WATER
PIPING SYSTEM.
100mmØ PVC OUTLET
0.10
13. USED uPVC SANITARY PIPING SYSTEM SERIES 1000 FOR 100mmØ
0.05
AND SMALLER SBR-34 GRAVITY SEWER MAIN uPVC PIPING SYSTEM
FOR 150mmØ AND BIGGER. PIPE SUPPORT
14. ENGINEER-IN-CHARGE TO VERIFY ACTUAL LOCATION AND (EVERY 1.50m)
0.075
ELEVATION OF STREET DRAINAGE, STREET SEWER AND STREET 75mm THK CONCRETE
WATER MAINS FOR CONNECTION BEFORE CONCONSTRUCTION. SLAB WITH 10mmØ RSB P-TRAP
100mm Ø PVC
DOWNSPOUT
CATCH BASIN DETAIL
SCALE NTS
100mm Ø ELBOW
(90°BEND) FLOOR DRAIN DETAIL
SCALE NTS
LAVATORY
FAUCET
POLYSTYRENE
PANEL
CATCH BASIN
50mm Ø 50mm Ø
REFER TO ARCH'L DWG.
FLOOR FLANGE
50mm Ø WP
(SEE PLAN FOR
EXACT LOCATION) VERIFY CONNECTION CWL UNDERGROUND WATER
TANK WRAPPED W/ BURLAP &
LAVATORY MOUNTING WATER CLOSET MOUNTING COATED W/ COALTAR
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
GENERAL NOTES
PROPOSED CONSTRUCTION OF
B R
S
O F
P-01
ME
H I
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY FLOOR DRAIN DETAIL AR-RAFI A. SALUAN PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
ENGINEERING ASSISTANT ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 39 47
(STANDARD PLAN) DOWNSPOUT TO CATCH BASIN DETAIL REGISTERED SANITARY ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ZAMBOANGA PENINSULA WATER METER DETAILS DATE: JULY 2019 DATE: DATE: DATE: DATE:
SEPTIC TANK
(7.60m x 2.80m)
50mm Ø PVC VENT 50mm Ø PVC PIPE 50mm Ø PVC VTR 50mm Ø PVC VENT 50mm Ø PVC PIPE
50mm Ø PVC VTR 100mm Ø PVC PIPE 50mm Ø PVC VTR
FD FD
GT 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 CV CHECK VALVE
F / SHO FAUCET & SHOWER
FD M WATER METER
1.20
WITH COLD-ROLL FORMED DS DOWNSPOUT
CHANNEL AND ANGLE; MANUAL
OPERATION
CB CB CATCH BASIN
79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 GT GREASE TRAP
PROVIDE PVC
ACCORDION 1.50
DOOR
PARTITION
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
SEWER LINE LAYOUT
PROPOSED CONSTRUCTION OF
B R
A N
P-02
ME
H I
REGIONAL OFFICE IX
T
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY AR-RAFI A. SALUAN PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
ENGINEERING ASSISTANT ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 44 47
ZAMBOANGA PENINSULA REGISTERED SANITARY ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
VTR
VTR
T 50
EN mm 0
V FD 2.6 78 92 3
C Ø 10
PV FD PV
Ø C 77 91
mmV FD VE
5 0 IPE FD NT 2
AC FD CP 50
10
PV NT mm 76 90
FD Ø VE Ø
62
mm PV
C PV
00
1
FD 1 Ø F CP 75 89 10
m m D WC IPEF 48 61
FD 50 F D
D WC 74 88
VTR
47 60
VTR
FD T
AN W EN 32
AE FD WC C P IPE C V 73 87 .50 1 0
10
V
RE ROB 10 C P 46 59
0m WC PV m Ø 31
A Ø
(5. CTOIC B m m
m 72
50 Ø
PV 0 m 50 45 58
00 R AF 50 mm CP 10 16 30 99
m
x 7 (AB FLED FD mm 86
15 Ø IPE 71
PV
.00 R) 0m
m
Ø
PV C
VE 15 29
44 57
m) Ø CP NT 0
1.2 85 98
PV FD IPE 43 56
CP 14 28
IPE 70 84
E 97
FD C PIP 42
13 27
PV 69 83
VTR
Ø 55
mm
41 96
0 12 26
15 68 82
54
11 25 67 81 95
VTR
40 53
10 66 80
39 52 0
1.9 .15
15 09 24
0m FD 65 79
m WC 38 51
Ø 23
PV FD
CP WC
64
IPE IPE
37 50
P 08 22
PVC 63
Ø 36 49
0 mm 21
10
VTR
35
06 20
NT
VE 34
PVC 05 19
Ø 33
m
0m 04 18
VTR
5 FD
WC
FD FD W 03 17
C
50 FD
mm 02 E
Ø 10 PIP
PV 0m FD C
C m PV
PIP FD FD Ø
PV GT
01 Ø
E CP 0 mm
IPE 5
VTR
50
FD mm
FD 5
VTR
SE G 5
T 0m Ø P
VTR
WC m 0 F m
(7. PTIC m
FD Ø P
D
50 Ø VC P
PV IP E
60 V F mm PIP
m TA 10
0m WC C V D
FD Ø CV E C
x 2 NK m E NT E P V EN PV
.80 Ø P IP CP T Ø
m) 15 PV FD IP E C IPEF mm
0m C FD P P V V D 50
m PIP C Ø AC
Ø
PV E WC PV FD
mm WC FD
Ø 0 0 F D FD
C m 1
PIP 0m 5 WC IPE FD
E 15 0m FD CP
m FD W P V FD
Ø C FD Ø
PV W m FD
C 15 C FD 0m
VE 0m 10
NT m FD
Ø VA
PV FD
FD 50 CP C
mm 1 0 I PE
0m FD
15 Ø m
0m PV FD Ø
m FD C PV
Ø PIP FD CP
PV E IPE
C
PIP FD
E FD
SEWER LINE ISOMETRIC LAYOUT
SCALE 1:100 MTS
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
SEWER LINE ISOMETRIC LAYOUT
PROPOSED CONSTRUCTION OF
B R
S
O F
A N
P-03
ME
H I
REGIONAL OFFICE IX
T
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY AR-RAFI A. SALUAN PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
ENGINEERING ASSISTANT ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 40 47
ZAMBOANGA PENINSULA REGISTERED SANITARY ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
38mm Ø CWL
sho. sho. sho. STO./ up sho. sho. sho.
JAN. up BACKSTAGE AREA
25mm Ø CWL
25mm Ø CWL
STO. TOILET & BATH
(SHE)
38mm Ø CWL
25mm Ø CWL
sho. sho. (HE)
TOILET
sho. sho.
sho. sho.
70 GAL PRESSURE TANK sho. sho.
sho. sho. up up
2HP MOTOR PUMP
(DUPLEX TYPE) sho. sho.
sho. sho.
sho. sho.
F F F F F F F
F F F F F F F
25mm Ø CWL
25mm Ø CWL
2.5m
GV GV
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
CV
38mm Ø CWL
1
(DUPLEX TYPE) 2.60 2.60 2.76
CISTERN TO OVERHEAD
MESS HALL
+0.10m
F.F.L
STORAGE
1.20
+0.10m
F.F.L
3.95 2.50 1.50
79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94
sofa
PROVIDE PVC
ACCORDION 1.50
38mm Ø CWL
38mm Ø CWL
DOOR
PARTITION
sofa
CV CV
M M
GV GV
TAP TO NEAREST
TAP TO NEAREST
WATER SUPPLY
WATER SUPPLY
WATER LINE LAYOUT
SCALE 1:100 MTS
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
WATER LINE LAYOUT
PROPOSED CONSTRUCTION OF
B R
S
O F
A N
P-04
ME
H I
REGIONAL OFFICE IX
T
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY AR-RAFI A. SALUAN PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
ENGINEERING ASSISTANT ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 45 47
ZAMBOANGA PENINSULA REGISTERED SANITARY ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
L
CW
Ø
mm
38
fa
so
E
LIN
IN
MA
M
RO
0
F 1.5
C WL
0
2.5
E ofa
L .L m G s
CW
F.F0.10 RA 0
1.9
Ø
+ O
ST
mm 5
38 3.9 061
6
2.7
5
10
94
0
2.6 4
1D 93 10
0 92
2.6 78 3
10
F F
F 77 91
sh 1W
o. F 10
2
sh F 76 90
o. 62
sh
C WL o. sh
o
F 1
Ø sh sh . F 75 89 10
m m o. o. FG 48 61
38 sh sh V
o. o. 74 88
sh 47 60
o. 32
GV sh sh 73 87 0
o. o. 46 59 10
sh 31
o. 72
sh 45 58
o. 16 30 99
38 71 86
m m 44 57
Ø L
CW CW 15 29 85 98
L Ø
mm 43 56
25 14 28 70 84
97
GC
VV 13 27
42
69 83
41 55
12 26 96
38 68 82
mm 54
Ø 11 25
CW 67 81 95
L CW 40 53
LF
RO 10 66 80
M GV 39 52 1.9
0
MA 24
IN 09
LIN 65 79
E 38 51
L 23 T
CW 64 ES Y
Ø 37 50 E ARPPL
mm N U
TOER S
08 22
GV 25 63 P
36 49 TAWA T
07 21
CW
GC
M
LF VV 35
RO 06 20
M L
OV
E
34 CW
RH 05 19 Ø
E mm
AD 33 38
TA sh 25 04 18
NK o. mm
Ø
CW E
L 03 17 LIN
M AIN
sh M O
PT
o. 02 O
WL FR L M
Ø
C WL CW U K
38
mm
01 m m C Ø ER PTAN
25 mmSF D O
Ø
CW 25 AN HEA L NK T
L R R R
GV T E CW TA O
F OV Ø AD MOTURE
mm HE / SS P
F
25
mm F L 38VERRESRE P UM AN
K
Ø F CW O T &U P R T
CW Ø E D
GC
LV F 38
m m FIXMP N SF ) HEA
CW V F U
P NK TRA YPE ER
L 38
FR
OM CW
L F m m TA HP X T OV
O
OV GV mm
Ø sh
o. F Ø
CW 2.5 PLEN T
E RH 25
L L U R
EA
sh
o. CW GV (D TE
F Ø S
D
TA sh E m CI
NK sh
o. sh
o. 3 S UR 8m
GV
GC o. sh S K GV
VV RE TAN P
CV
o.
N K P M
sh
o.
D TA G AL PU E)
CW sh L A 70 R
O YP
CW HE
OTEX T
L o.
FR sh
o. Ø V ER M
OM mm O L
38
m MA sh
o. 38 OM 2 HP UP
m IN R ( D
Ø
CW LIN sh LF
L E o. CW
GV NOTE: VERIFY ACTUAL
LOCATION OF CISTERN AND
OVERHEAD WATER TANK.
SEE TANK DETAILS
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
WATER LINE LAYOUT
PROPOSED CONSTRUCTION OF
B R
S
O F
A N
P-05
ME
H I
REGIONAL OFFICE IX
T
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY AR-RAFI A. SALUAN PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
ENGINEERING ASSISTANT ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 45 47
ZAMBOANGA PENINSULA REGISTERED SANITARY ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
FD FD FD FD FD FD
50mm Ø PVC PIPE 150mm Ø PVC PIPE 150mm Ø PVC PIPE 150mm Ø PVC PIPE 150mm Ø PVC PIPE
CB CB CB CB CB CB CB CB CB CB CB CB CB
50mm Ø PVC PIPE
100mm Ø PVC PIPE
DS
DS
CB DS DS DS DS DS DS DS CB
STO./ up
JAN. up BACKSTAGE AREA
DS
DS
CB DS DS DS CB
DS DS DS DS
DS
CB
DS
CB
150mm Ø PVC PIPE
TABLE
DS
DS
CB CB
DS
RD
DS
CB CB
150mm Ø PVC PIPE
DS
DS
CB CB
1.50
DS
DS
CB DS DS DS DS DS DS CB
CB CB CB CB CB CB
TO STORM DRAINAGE
150mm Ø PVC PIPE 150mm Ø PVC PIPE 150mm Ø PVC PIPE
TO STORM DRAINAGE
CB CB
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
STORM DRAINAGE LAYOUT
PROPOSED CONSTRUCTION OF
B R
S
O F
A N
P-06
ME
H I
REGIONAL OFFICE IX
T
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY AR-RAFI A. SALUAN PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
ENGINEERING ASSISTANT ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 46 47
ZAMBOANGA PENINSULA REGISTERED SANITARY ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
RD
E
PIP
C
PV GE RD
INA
RD
P IPE
C
PV
Ø
100mm Ø PVC PIPE 0mm
15 RD
100mm Ø
RD
RD
15
100mm Ø
0m
IP E m
Ø
100mm Ø
PV
FD 10
0m
m
Ø
100mm Ø
FD PV
CP
IPE
RD 15 E
FD 0m AG
100mm Ø PVC PIPE
m I N
Ø A
PV
C DR PIPE
PIP R M C
O V
100mm Ø
E ST P
O Ø
RD T m
0m
15
RD
RD
15 RD
100mm Ø
IPE
RD RD
RD
E
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
STORM DRAINAGE ISOMETRIC LAYOUT
PROPOSED CONSTRUCTION OF
B R
S
O F
A N
P-07
ME
H I
REGIONAL OFFICE IX
T
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY AR-RAFI A. SALUAN PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
ENGINEERING ASSISTANT ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 42 47
ZAMBOANGA PENINSULA REGISTERED SANITARY ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
AIR SPACE0.30
0.15
C.O.
0.25
C.O. C.O.
0.40 0.40
0.15
SECTION B-B
0.60
B 600
PLAN
600
250 100 250
S 3 - 10 mm Ø 10 mm Ø BAR
HANDLE
( E.W. )
50
100
600
7.60
0.15 5.20 0.15 0.90 0.15 0.90 50 75 50
50ØVENT
150mm THK. CHB WALL STAINLESS STEEL
50Ø DRAIN
w/ 12mmØ REBARS HOR. DIGESTIVE LEACHING LEACHING 1.60
2.00 A FROM SINK
GREASE TRAP
BARS @ EVERY 3-LAYER CHAMBER CHAMBER
CHAMBER
& VERT. BARS @ 0.80m
UNION PATENTE
150mm THK. R.C. SLAB
w/ 12mmØ CONT. BARS
SP. @ 300mm O.C. B.W.
SAND SAND
0.25
IN OUT B
3-12mmØ CONT. BARS BAFFLES
w/ 10mmØ TIES
SP. @ 300mm O.C. REMOVABLE
0.40 0.40 0.40 0.40 BASKET 50ØWP
PLAN SECTION
SECTION A-A SIZE GPM
WGT
LBS
DIMENSION IN INCHES
A B C
100 7 85 15 12 11 1/8
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
SEPTIC VAULT DETAILS
PROPOSED CONSTRUCTION OF
B R
MANHOLE DETAILS
O F
A N
P-08
ME
H I
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY AR-RAFI A. SALUAN PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
ENGINEERING ASSISTANT ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 47 47
ZAMBOANGA PENINSULA REGISTERED SANITARY ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
300
Ø12MM @ 100MM
200
300
TEMPERATURE BARS
BENT UP BARS 2 OF 3
WALL
150
@ L/4 BOTH WAYS
THK
CO CO CO CO CO
300
2100
EXTRA BAR @ EVERY SIDE WALL W1 PROVIDE 180° HOOKS AT WALL W1
OF OPENING THIS JOINT ONLY
CO CO CO CO WALL
A
DETAIL A TYP SLAB-WALL CONN. DETAIL
4700
5000
500
SCALE 1:10 MTS SCALE 1:10 MTS
CO
CONCRETE COVER THK
(MANHOLE)
12MM Ø 100MM O.C
TYP. WALL TO WALL DETAIL DIAGONAL BARS WITH 12MM Ø 100MM O.C
2100
2-12MM Ø @ INTERSECTION DIAGONAL BARS W/
1 - 12MM Ø 400MM LONG SCALE 1:10 MTS
2-12MM Ø
DIAGONAL EXTRA BAR @ W1 12MM Ø @ 100MM O.C W2 @ INTERSECTION
EVERY CORNER OF OPENING BENT BAR
TEMP. BARS
SCHEDULE OF WALLS
150
150
300
300
REINFORCEMENTS
150MM THK SLAB MARK THK
VERTICAL HORIZONTAL 100MM THK
PLAN 100MM THK
W-1 150 12MM Ø @ 150MM 12MM Ø @ 200MM GRAVEL BED
GRAVEL BED
W-2 125 12MM Ø @ 150MM 12MM Ø @ 150MM 200 350 100 100 700 100
4 - 12MM Ø
TEMP. BARS
7000 5000
150 150
150 4700 150 W1 FOOTING DETAIL W2 FOOTING DETAIL
1850 1000 1000 1000 1000 850 SCALE 1:20 MTS SCALE 1:20 MTS
CO CO CO CO CO CO CO
150
150
100
200
100
VERIFY PIPE
DIAMETER
VERTICAL BARS
SEE DETAIL A 12MM Ø @ 150 MM 3-12MM Ø TOP BARS
HORIZONTAL BARS
12MM Ø @ 200MM
300
10MM Ø STIRRUPS SPACED
1 @ 50MM, REST @ 100MM
PLAIN CEMENT FINISH
3000
3000
WATERPROOFING
125MM THK RC WALL 150MM THK RC WALL
150
IMPORTANT NOTE:
300
300
IN CASE THE THE ACTUAL SITE LOCATION/CONDITION IS
Ø12MM @ 300MM O.C
100MM THK TOP & BOT. BARS 100MM THK Ø12MM @ 300MM O.C FOUND NOT IN ACCORDANCE WITH THE ASSUMED SOIL
GRAVEL BED BOTH WAYS GRAVEL BED TOP & BOT. BARS BEARING CAPACITY OF 96 KPA, THE STRUCTURAL
SECTION A-A BOTH WAYS DESIGNER/ENGINEER SHALL BE NOTIFIED IN WRITING
FOR PROPER REVISION OF THE STRUCTURAL PLAN
SECTION B-B
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
DET. OF ANAEROBIC BAFFLED REACTOR
PROPOSED CONSTRUCTION OF
B R
SCHEDULE OF WALLS
O F
A N
P-09
ME
H I
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY AR-RAFI A. SALUAN PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
SECTION DETAILS REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 43 47
ENGINEERING ASSISTANT ENGINEER IV DISTRICT ENGINEER
ZAMBOANGA PENINSULA REGISTERED SANITARY ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
1.20
1.20
1 1 Fy = 248 MPa
25MM Ø PP-R CWL Fu = 345 MPa
FROM CISTERN TANK REINFORCED SPECIFIED
1.67 1.67 CONCRETE STRENGTH
STEEL LADDER Fy = 275 MPa
MADE FROM
1.50
1.50
1 1 1 38MM Ø PP-R CWL
2"x2"x41" ANGLE BAR Fc' = 21 MPa
FROM OVERHEAD
TO FIXTURES 2.25
0.35m
1.88 1.88
1 1
1.50
1.50
1 SLAB with 10mm Ø TEMP. BARS
7.2
7.2
SPACED @ 400mm O.C BW
2.25
2.09 2.09
2,500 L STAINLESS
1.50
1.50
1 1 1
STEEL CISTERN
TANK
SLAB DETAIL
2.30 2.30 SCALE 1:50
TRANSFER PUMP TO
25MM Ø PP-R CWL
1.50
1.50
1 1 OVERHEAD TANK
1
SUPPLY PIPE PRESSURE 70 GAL
PRESSURE
TO CISTERN TANK SWITCH
0.01
0.01
TANK
0.125
0.13
TO FIXTURES
2.5 HP
MOTOR
PUMP
250mm
200mm
STEEL PLATE
PAINTED DETAIL OF CISTERN TANK & OVERHEAD WATER TANK
SCALE 1 : 50 M
200mm
250mm
0.125
N.G.L 0.4 VALVE PRESSURE
FLOOR COVERED BY BYPASS LINE SWITCH
SLAB with 10mm Ø TEMP.
STEEL PLATE (6mm THK.) BARS SPACED @ 400mm TO FIXTURES TO FIXTURES
TOP: PAINTED
2.5m
O.C BW
0.7
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L I C WO
DET. OF CISTERN AND OVERHEAD WATER TANK
PROPOSED CONSTRUCTION OF
B R
S
O F
P-08b
ME
H I
G
R
VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY AR-RAFI A. SALUAN PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
SCHEMATIC DIAGRAM OF WATER DISTRIBUTION
ENGINEERING ASSISTANT ENGINEER IV DISTRICT ENGINEER
REYNALDO C. ALCONCEL CAYAMOMBAO D. DIA, CESO IV 47 47
ZAMBOANGA PENINSULA REGISTERED SANITARY ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR