You are on page 1of 6

DHANANJAYAN RK E-Mail:rk.dhananjayan@gmail.

com
B.E.Mechanical Engineering Hand Phone:+65 85336555
Senior Mechanical & Electrical Supervisor
Conspecs Pte Ltd,Singapore

EDUCATION AND CREDENTIALS

BACHELOR OF ENGINEERING (1st class Honours), (2002-2006)


MECHANICAL ENGINEERING, Anna University, Chennai, India.
Professional Mechanical Engineer certificate,Engineers Australia

Ministry Of Manpower Certification,Singapore Personal Profile


1)Building Construction Safety Supervisor Course (BCSS). Date of Birth: 20/03/1984, Age 38
Marital Status: Single
2)Risk Management Course – bizSAFE Managerial Level (level2)
Address: BLK631, Woodlands Ring Road
3)Work at Height course for supervisors #08-204, S730631
4)WSQ-Perform Work In Confined Space Operations
Resident Status: Employment Pass
Fin No: G5119408Q
PASSPORT NO: M7259636
Possess class 3 Driving License
PROFESSIONAL SUMMARY
-Senior M&E Supervisor/M&E Engineer for JTC,CAAS,NEA,PUB,Clean room,Oil&Gas &Airport Projects.
-M&E Supervisor for A&A,R&R projects for JTC&PUB Projects
-Mechanical Supervisor for Oil&gas,PUB projects
-14+ Years Experience (Singapore-11 years, Kuwait-2 years, India-3 years) in the M&E Systems in Industrial,
Commercial, Utilities and factory building construction projects
OVERALL RESPONSIBILITIES SUMMARY:
 Interacting with all Construction Management and Quality Assurance / Quality Compliance Team, Discipline Supervisors,
Mechanical System Engineer, Safety Personnel, Client Representatives and Sub-contractors and their Foremen
 Arranging mock-up locations and details
 Assisting the System Engineer during inspections and obtaining official agreement on the solution and aesthetic impact
from all interested parties
 Compiling Test Packs and forwarding these to the System engineer for approval prior to the scheduled line check etc.
 Witnessing and accepting pressure testing undertaken by subcontractors
 Ensuring equipment has been pre-tested and that systems are complete (including sub-systems) in accordance with need
dates
 Assisting the System Engineer during equipment turn-on, trial runs and commissioning.
 Arranging, planning and implementing internal punch-listing and punch-list clearing regimes in accordance with standard
operating procedures
 Ensuring Equipment/Material delivery Inspection at site are accordance with technical specifications
 Ensuring Installations are in compliant with approved specification and latest approved shop drawings
 Resolve site co-ordination Issues and clashings with contractors
 Provide proactive feedback to engineering team for all the site issues which affects design intent
 Ensure and Implement the workmanship and quality of works are in accordance with the Project specification
 Ensuring approved method statements are followed
 Ensuring the full value of risk assessment is reaped
 Highlighting schedule concerns and manpower concerns to the System Engineer.
 Ensuring frequent housekeeping is done to maintain a safe,neat and tidy work place at all times
 Testing,Pre-commissioning and Commissioning works of M&E Systems
M&E Systems Experience:
AC:
-CRAC Units complete with condensing units
-Chilled water pipes/pumps
-Chillers/Cooling towers
-PC based centralized controller
-VRV Air conditioning system/Condenser
-Insulated drip tray/Aircon control panel
-Refrigerant and condensate pipework linking with water point detection system and Building
management system
-Interfacing with BMS/Fire protection system
-Testing,Pre-commissioning and Commissioning works
MV:
-Insulated stainless steel ductwork
-Diffusers,grilles,silencers,vibration isolators,Refrigerant and condensate pipe
-Fire dampers,masonry box up&motorized dampers/control panels
-Blast valve 40bar rating,control panel linking with FM200 & gas detection system
-Drip tray,water point system linked to BMS
-Interfacing with BMS/Fire protection system
-Testing,Pre-commissioning and Commissioning works
Fire Protection:
-Gas suppression fire extinguishing system,FM200 system
-Fire alarm system
-Fire hydrant system
-Acrylic zone chart
-Manual call points,alarm bells c/w stobe lights,Smoke/heat detectors
-Main alarm panel 230v
-Sub-Indicator Panel with 230V Surge arrestor
-Nozzles,Piping and strobe sirens
-Interfacing with sub alarm panel
-Interfacing with ACMV System
-Interfacing with EM Locks,security doors,Hosereel pump and Generator
-Halotron type 50kg portable wheel fire extinguishers with accessories
-Testing,Pre-commissioning and Commissioning works
BMS:
-DDC with 230v lightning surge arrestor
-Workstations,UPS,Power and data cabling
-Interfacing testing with ACMV/Fire protection/Genset
-Temperature sensor
-Testing,Pre-commissioning and Commissioning works
Electrical:
-Permanent Genset 550Kva
-Underground fuel storage tank
-Fuel pump and piping system
-Mobile Genset 550Kva
-MSB,SSB and DB Installation works
-Lightning Protection and earthing system
-Lighting,Exit light,cables,Switches&SSO
-Cable tray,Cable ladder,Conduits and trunking
-Lamp post Installation works
-Aircraft warning LED light c/w lamp, Built in transfer relay and photocell
-Lift
-Testing,Pre-commissioning and Commissioning works
Integrated Security Management System:
-CCTV
-Card access
-Emergency break glass
-EM Lock
-Exit button
-Anti ram barrier
-FIDS
-UPS,10kVA
-Testing,Pre-commissioning and Commissioning works
Plumbing&Sanitary:
-External Sanitary drainage system
-Anti-mosquito device
-Urinal traps,gully traps,waste sumps and fittings
-Drainage sump pump with weatherproof control & monitoring panel
-Interfacing to BMS/Rain sensor
-Detention tank pumps
-Testing,Pre-commissioning and Commissioning works
WORK EXPERIENCE-1
Senior Mechanical&Electrical Supervisor, Conspecs Pte. Ltd. Singapore
Tenure: Nov 2016 to Till now.
Project 1:
Launchpad 2.5-Proposed Erection of 4-Storey multiuser business park development with café and Independent
office on Part Lot 01759N MK09 at CleanTech loop. Owner:JTC.
Project 2:
Proposed additions and alterations to the existing 1 block of 4-Storey flatted factory and 1 block of 9-storey flatted
factory and warehouse on Lot04759LMK13 at 20&22 Woodlandss link.Owner:JTC.

Project 3:
Proposed erection of a 10 storey multi-user industrial factory development (Total 65 units) with ancillary
offices,temporary canteen at 1st storey and basement carpark on LOT00804AMK 11 at 5 Sungei Kadut Street 2
(Sungei Kadut Planning area).Owner:JTC

Project 4:
CAAS VHF Construction of Building & Facilities for Housing Equipment and data centre(Aviation Park
Road),Civil Aviation Authority of Singapore (CAAS).Owner:CAAS

Project 5:
Proposed new erection of a 2-Storey with mezzanine hawker centre with basement and roof garden on LOT01855L
MK14 at Senja Road.Owner:NEA

Project 6:
Proposed Addition&Alteration works to existing 2 blocks of buildings at Matrix and Proteos and Refurbishment &
Redecoration works to existing 7 blocks of buildings at Chromos,Centros,Helios,Nanos,Matrix,Genome & Proteos at
Biopolis.Owner:JTC

Responsibilities:
 Performed roles and responsibilities required of site supervisors under the Building Control Act.
 To take instruction from Superintending Officer/Consultant.
 To ensure that the M&E works are constructed in accordance with drawings and specifications and the Building Control
Act and Regulations.
 To monitor and report on the progress of works.
 To carry out supervision and inspection of the works as directed by the Supervision QP, consultants or Superintending
Officer.
 To verify all reports and claims relating to M&E works submitted by the contractors.
 To attend contractor’s queries and co-ordinate the works of main contractor.
 Carry out site supervision of the inspection of M&E works as Instructed by consultant team to ensure the works are adhere
to the quality.
 To check and ensure the contractor executes the preliminary works prior startup of the system works.
 To Review all shop drawings/materials/systems submitted by contractors comply with consultant’s drawings, design and
specification.
 Check and ensure As-built drawings submissions with respect to the site installation.
 Verify reports and claims submitted by contractors.
 Provide standing supervision as Instructed by consultant team when required.
 To maintain daily work records including test records, Inspection records, status of works,safety,equipment on
site,manpower,materials,site diary etc. and other documentations as required by SO, Architect and Consulting engineers.
 Review Architectural, C&S, M&E drawings and report the deviations to consultants and contractors if found.
 To record all VO approved by consultant team.
 To Inspect and take over completed works.
 To check and verify all services routes, contractor setting out and report any deviations to the consultant team and
contractors.
 To Assist collating data for weekly site progress report on the status of the site inspection and to issue site memo for the
contractors for any non-conformance of the works.
 To provide photo records of all defects and accepted rectification works and incorporate them in to the weekly report.
 Witness all M&E system testing and commissioning (T&C) test reports complete with method statement for individual
system.
 To carry our M&E defect inspections and update in the master defect list of all the M&E defects with photos in the MS-
Excel.
 Supervision of the M&E works ensuring safety and compliance with the design, specification and quality.
 Check M&E Submittals for drawings/materials & equipment.
 Inspection of materials delivered on site and check compliance with approved materials.
 To maintain proper and updated daily records of all works done including records of tests, inspections, status of work,
safety, site diary, material on site and equipment on site, labour force, day works, provisionals quantities etc.
WORK EXPERIENCE-2
Mechcanical &Electrical Supervisor, Black&Veatch (SEA) Pte.Ltd. Singapore
Tenure: Jan 2014 to Oct 2016; Owner: PUB, CWRP (Changi Water Reclamation Project), Singapore
Projects:
Contract -1: Proposed Expansion of Digester and Effluent Pumping Station at Changi Water Reclamation Plant
Contract -2: Proposed Expansion of Membrane Biological Reactor Plant at Changi Water Reclamation Plant
Contract -3: Proposed Second Membrane Bioreactor Retrofit (LM1) at Changi Water Reclamation Plant
Responsibilities:
 Review of construction drawings, Piping and Instrumentation diagram, engineering technical submissions.
 Study and understand the project contract specifications and tender drawings.
 Review of safe work procedure, commissioning plan and operation&maintenance manuals for membranes & anaerobic
digester citing to project contract specifications.
 Attend client, contractor meetings for discussing Project progress, commissioning plan reviews.
 Inspection of delivery, fabrication, erection & installation of piping, structural, equipments like pumps, air receivers, fine
screen, membrane cassettes and steel structures.
 Liaise with contractors & clients for tie-In, shutdown, testing and commissioning works.
 Liaise with process, design, contractors, vendors, suppliers&clients.
 Monitor project progress according to the planned schedule.
 Coordinating, witnessing and documentation with vendors for FAT, Factory Acceptance Test.
 Ensure the quality of mechanical Installation works are according to the approved drawings and project contract
specifications.
 Monitor project progress according to the planned schedule.
 Coordinating interfacing works with civil, mechanical and instrumentation team.
 Witnessing performance test, SAT (Site Acceptance Test & commissioning of chemical dosing systems, air
compressors ,RAS,WAS,SCUM Systems, MBR (GE) systems, mixers and double containment piping systems by LOCAL
and SCADA controls.
 Witnessing Commissioning of digester mechanical Items such as mixing system pumps, sludge heating system, fire alarm,
air conditioning and mechanical ventilation systems &fire sprinkler by LOCAL and SCADA controls.
 Prepare defects list with photos and close it with rectified photos before handover.
 To implement and ensure WSH, workplace safety and health at worksite

WORK EXPERIENCE-3
Mechanical Supervisor, MUNSIONG ENGINEERING Ltd., Singapore
Tenure: Nov 2011 – Nov 2013.
Project: SHDS-OSBL (Singapore Hydro De-Sulphurization and Facilities Project-Outside Battery Limit)
Owner:Exxon Mobil,Jurong Island,Singapore

Responsibilities:
 Line Inspection of various piping service systems with respect to hydro test pack.
 Interpret piping drawings, Structural drawings, Isometric drawings & general assembly drawings.
 Execution of hydro testing and pneumatic testing for process piping systems and utility piping systems.
 Supervising fabrication and erection of structure, process piping and utility piping in exxon mobil SHDS-OSBL project
and track the work progress with the approved project schedule.
 Monitor and record daily work progress and manpower at project site in Microsoft excel worksheet.
 Preparation of manpower reports and report to the project manager.
 Working with testing & inspection team of foster wheeler and exxon mobil quality control team for hydrotest and
installation inspection of piping and structures.
 Maintaining records for fabrication, welding, cutting, welding consumables and tools.
 Manages all aspects of a piping department including supervising and coordinating all preparation, installation,
modification, and testing for piping system components per applicable drawings, codes and project specifications.
 Supervising all piping installation work activities are performed safely and efficiently.
 Preparing weld summary, daily welding reports for fabrication and erection of piping works in Microsoft excel worksheet.
 Preparation of test packages and reports as per the client foster wheeler requirements.
 Arranging for radiographic testing, third party inspections according to the client foster wheeler’s requirements.
 Coordinating with the client foster wheeler area project engineer.
 Supervise the shop and site fabrication works.
 Apply permit to work for all the erection and installation works at project site.
 Conducting tool box meetings prior to startup of work.
 Preparing and participating in risk assessment.
 Supervised the erection of piping and structures are based on the approved technical drawings, project specifications and
safe work procedures to ensure project requirements are carried out safely and effectively.
 Verify materials, consumables, fit-up, welding, repair work, weld profiles and work completion is in compliance with
welding procedure standards.
 Carried out punch killing activities after receiving the site walk down from the client foster wheeler.
 Coordinating the commissioning team for the pre-commissioning & commissioning works like flushing, leak test, air-
drying, nitrogen purging and catalyst loading.

WORK EXPERIENCE-4
M&E Engineer with Winhuat Engineering Works Pte. Ltd. Singapore
Tenure: April 2011-Aug 2011
Owner: Avanstrate Asia Singapore
Project: Addition and Alteration works at existing Factory building (Clean room)

Responsibilities:
 Performed roles and responsibilities required of site supervisors under the Building Control Act
 To take instruction from Superintending Officer/Consultant
 To ensure that the M&E works are constructed in accordance with drawings and specifications and the Building Control
Act and Regulations
 To monitor and report on the progress of works
 To carry out inspection of mechanical and engineering works prior to concreting or subsequent construction works
 To carry out inspection on defects rectification works
 To carry out supervision and inspection of the works as directed by the Supervision QP, CRE, consultants or
Superintending Officer
 To ensure that records of all mechanical and engineering works including records of tests, defect rectification, inspections,
work progress, material and equipment on site, safety, etc, are timely updated and properly kept
 To attend site, progress, variation and coordination meetings
 To verify all reports and claims relating to M&E works submitted by the contractors
 To liaise with all relevant authorities
 To verify reports and claims submitted by contractors.
 To maintain proper and updated daily records of all works done including records of tests, inspections, status of work,
safety, site diary, material on site and equipment on site, labour force, day works, provisional items or provisional
quantities etc.
 To keep accurate record of variations as instructed or approved by the Superintending Officer and to maintain a set of
updated drawings on site
 To check all drawings (including shop drawings, construction drawings and specifications for discrepancies and to report
to the Supervision QP, consultants or Superintending Officer.

WORK EXPERIENCE-5
M&E Engineer, PETROLEUM TECHNICIANS SOCIETY, India
Tenure: Aug 2010-Mar 2011
Owner: Airport Authority of India (AAI) Chennai Airport, Chennai
Project: M&E Works for the new construction of new airport terminal (Domestic&International)

Responsibilities:
 Carry out progress monitoring, site supervision and inspection, quality control of construction work on site ensuring it is
carried out to the approved drawings, specifications, local standards, authority regulations and requirements.
 Handle contractors’ queries, reports and verify progress claims within the provisions of the Building Regulations
 Provide regular progress on the works as per contractor’s approved program, including any non-compliance reports
 To check all drawings and specifications to ensure that works are carried out in accordance with the approved plans for
discrepancies and report to the Superintending Officer/Consultant /Qualified Person
 To prepare defect lists,monitor progress of rectification works and ensure all defects are satisfactorily rectified
 To prepare As built drawings after system completion
 To Liaise with main contractors for the resolving site Issues and clashings
 To assess the progress claims based on the site progress

WORK EXPERIENCE-6
M&E Engineer for SK ENGINEERING & CONSTRUCTIONS, KUWAIT
Tenure: July 2008-July 2010
Owner: Kuwait International Airport
Project: Addition&Alteration works of M&E works at Kuwait International Airport

Responsibilities:
 Site Erection, Installation, Testing and Commissioning of chilled water Piping and pump systems
 Assist in installation, commissioning, repair & maintenance
 Conduct regular on-site inspections of on-going works to ensure that contractors adhere to established work procedures
such as end-to-end testing, installation standards and safety work processes
 Monitoring and overseeing in-house technicians & contractors during onsite technical operations
 Track that all installation appointments and work orders are fulfilled and delivered on time
 Manage M&E Sub Contractors and drafters to ensure construction are done according to M&E drawings and coordinate
M&E details with Clients, Consultants, Sub - contractors and other site staff.
 Prepare M&E Master Construction Schedule, CSD and Structural Penetration for approval.
 Review M&E Design Drawings and identify discrepancies between M&E, Structural, ID, Architectural and Client
provisions.
 Review and align M&E Design Drawings to ensure compliance with design specification and guidelines
 Ensure M&E works are well coordinated with the Consultant to meet any Authorities Requirements.

WORKEXPERIENCE-7
M&E Engineer for IDEAL INDUSTRIES PTE.LTD. India
Tenure: June 2006-June 2008
Owner: Airport Authority of India (AAI) Trichy Airport, Trichy
Project: M&E Works for the new construction of new airport terminal (International)

Responsibilities:
 Responsible for technical, organizational and supervisory representative for the construction site
 Assisting the Project Manager for the designs to be positioned, installed and keep track of the progress of M&E activities
on site
 Carry out progress monitoring, site supervision and inspection, quality control of construction work on site ensuring it is
carried out to the approved drawings, specifications, local standards, authority regulations and requirements
 Planning & Scheduling of Site Installation, testing & Commissioning
 Responsible for interfacing between the Main contractor and subcontractors when M&E activities on site are executed.
 The site engineer should be able to ensure arrived materials are according design and specifications
 Supervision of works of to ensure the sub-contractors are following the local regulations, main-contractor regulations and
safety and health regulations
 Preparation of daily reports/time sheet
 Coordinating for Installation and testing witness with client representative

SKILLS &ABILITIES:
 Proactive, Versatile and strongly believe in team work
 Analytically strong and adaptable
 Proven problem solving skills
 Quick learner and able to keep up the pace of the schedule
 Proven leadership qualities by handling projects, teams and actively involving in organizing activities
 Good leadership, planning, organizational, Communication and interpersonal skills
 Experienced with Microsoft tools like Excel, Power point, Word,Autocad and SAP

Declaration:
I hereby declare that the above information is true to the best of my knowledge

Yours Truly,

Dhananjayan RK

You might also like