You are on page 1of 1

KEY PLAN

W E

A B

3440

GENERAL NOTES:

1. DO NOT SCALE FROM DRAWINGS. DIMENSIONS GOVERN.

2. ALL DIMENSIONS TO BE VERIFIED ON SITE.

3. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.

4. ALL LEVELS ARE IN METERS UNLESS NOTED OTHERWISE.

5. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT PROJECT SPECIFICATIONS,
SCHEDULES AND DRAWINGS.

6. ANY DISCREPANCY IN OR BETWEEN THE DRAWINGS, SPECIFICATIONS AND SCHEDULES MUST BE


BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT/ENGINEER PRIOR TO
UNDERTAKING ANY WORKS.

7. THE CONTRACTOR SHALL SUBMIT COORDINATED SHOP DRAWINGS FOR APPROVAL (BASED ON
SITE DIMENSIONS) PRIOR TO COMMENCEMENT OF ANY SITE WORKS OR PLACING OF ANY
ORDERS AND OR MANUFACTURE OF ANY FITTINGS, FIXTURES AND COMPONENTS SHOWN. THE
CONTRACTOR SHALL ONLY WORK FROM COORDINATED AND APPROVED SHOP DRAWINGS.

8. ALL MATERIALS SHALL BE APPROVED BY THE ARCHITECT/ENGINEER PRIOR TO UNDERTAKING


ANY WORKS.

9. STEEL WORKS SHALL BE DESIGNED BY SPECIALIST AND SUBMITTED FOR ENGINEER'S


/LOCAL MUNICIPALITY APPROVAL.

1 View_01
1:15
(3d)

A B
1
3440
2500

1100
+3000 +3000

1010
REV DATE BY DESCRIPTION CHK APD
20
N1
UP CLIENT:

CONSULTANT:

PO Box 500103 Dubai, U.A.E.


Tel: +971 4 391 5640 Fax: +971 4 391 6799
www.tekla.com
3000

3000
ARCHITECT:
HEB120

HEB120

CONTRACTOR:

HEB120
PROJECT:

Tekla Model
TITLE:

Plans and Elevations


+0 +0
EXISTING SILO - FRAME BEAM

SCALE: CHECKED: APPROVED:


1:15
PROJECT No: DESIGNED: DRAWN: DATE:
500-103

1 View_03 (3d) DRAWING No: REV:

1 View_02
1:15
(3d)
1:15 G202

You might also like