You are on page 1of 2

Section Findings Corrective Action

Where the floor is liable to become wet in the


course of any manufacturing process to such
51.
extent as is capable of being drained, effective
Cleanliness
means of drainage shall be provided and
maintained.

Effective and suitable provisions shall be made in


52.
every establishment for securing and maintaining
Ventilation and
in every work-room adequate ventilation by the
temperature
circulation of fresh air.

54.
Disposal of wastes Drain should be covered.
and effluents

58. once in a year drinking water needs to TEST


Drinking Water from certified LAB (Rules 2015: 50)

59.
Rules 2015: 51, Tofsil 2
Latrines and
1. Toilet should be 25,40,50,60.
urinals

Rules 2015, 52
1. for ebery100 worker 1 trust bin.
60. 2. Trust bin should have sand and bleaching
Dust bean and pounder.
spittoon 3. should be clean and hygiene every 7 days.
4. Trust bin should be placed Infront of the door.
5. Need to hang SOP.
Section Findings Corrective Action

62.
Fire extinguisher should be one meter above
Precaution in
from the floor.
case of fire

66. Rules 2015, 52


Self-action Between the machine and wall exit way will be
machines minimum 1 meter.

75. According to labor rules 2015: 64


Protection of Prescribed for eye protection glass,
eyes Hand shield, Black cloth or board.

62.
Precaution in The fire door should not be stuck by anything.
case of fire

You might also like