Professional Documents
Culture Documents
ITB 2011-010
(36 residential units) in Rafah.
Electronic copy of the BOQ shall be submitted along with the signed hard copy thereof. In
case of any discrepancy between the soft and the hard copies, the hard copy shall prevail.
Contractor Signature
Package #3: Completion of Construction 16 buildings.
(36 residential units) in Rafah.
Preamble
1 .The Price Schedule must provide a detailed cost breakdown for each
item.
3. All prices/rates quoted must be exclusive of all taxes, since the United
Nations, including its subsidiary organs, is exempt from taxes.
Contractor Signature
Package #3: Completion of Construction 16 buildings.
ITB 2011-010
(36 residential units) in Rafah.
Bill No (0)
1. Mobilization & Demobilization
Item Unit Rate Unit Rate Total Amount
Description Unit Quantity
No. US $ (letters) US $ (Numbers) US $
All works according to particular
specifications, and supervisor engineer
instructions.
The contractor must submit reports for the
exisiting activities and materials on the project
site supported with photographs before work
start and take approval to start the work.
(shifted from excavation item)
Total
Contractor Signature
Package #3: Completion of Construction 16 buildings. ITB 2011-010
(36 residential units) in Rafah.
Bill No (1)
1. Excavation And Earth works
Item Unit Rate Unit Rate Total Amount
Description Unit Quantity
No. US $ (letters) US $ (Numbers) US $
Total
Contractor Signature
Package #3: Completion of Construction 16 buildings. ITB 2011-010
(36 residential units) in Rafah.
Bill No (2)
2. Concrete Works.
Item Unit Rate Unit Rate Total Amount
Description Unit Quantity
No. US $ (letters) US $ (Numbers) US $
Contractor Signature
Package #3: Completion of Construction 16 buildings. ITB 2011-010
(36 residential units) in Rafah.
Bill No (2)
2. Concrete Works.
Item Unit Rate Unit Rate Total Amount
Description Unit Quantity
No. US $ (letters) US $ (Numbers) US $
Contractor Signature
Package #3: Completion of Construction 16 buildings. ITB 2011-010
(36 residential units) in Rafah.
Bill No (3)
3. Building Works
Item Unit Rate Unit Rate Total Amount
Description Unit Quantity
No. US $ (letters) US $ (Numbers) US $
Contractor Signature
Package #3: Completion of Construction 16 buildings. ITB 2011-010
(36 residential units) in Rafah.
Bill No (4)
4. Plastering Works
Item Unit Rate Unit Rate Total Amount
Description Unit Quantity
No. US $ (letters) US $ (Numbers) US $
ontractor Signature
Package #3: Completion of Construction 16 buildings. ITB 2011-010
(36 residential units) in Rafah.
Bill No (2)
4. Plastering Works
Item Unit Rate Unit Rate Total Amount
Description Unit Quantity
No. US $ US $ US $
External Plastering
Supply and make external plastering 20mm
thick to walls with four faces : the first is the
rough nail rendering (mix 1:1) cement sand;
the second is 5mm thick mortar (mix 1: 2)
cement:sand, the third is the undercoat 13mm
(mix 1: 3 :0.25) cement:sand:lime, the forth is
4/3 two coats of Tyrolean finish ( mix 1: 3) white M2 7890
cement to fine aggregate (Quartiz) and all is
according to specifications , drawings and
supervisor engineer's instructions
Total
ontractor Signature
Package #3: Completion of Construction 16 buildings. ITB 2011-010
(36 residential units) in Rafah.
Bill No (5)
5. Tiling and Marble Works
Item Unit Rate Unit Rate Total Amount
Description Unit Quantity
No. US $ (letters) US $ (Numbers) US $
All works must be according to drawings,
specification and engineer instructions. Rates
shall include :
Contractor Signature
Package #3: Completion of Construction 16 buildings. ITB 2011-010
(36 residential units) in Rafah.
Bill No (5)
5. Tiling and Marble Works
Item Unit Rate Unit Rate Total Amount
Description Unit Quantity
No. US $ (letters) US $ (Numbers) US $
Total
Contractor Signature
Package #3: Completion of Construction 16 buildings. ITB 2011-010
(36 residential units) in Rafah.
Bill No (6)
6. Painting Works
Item Unit Rate Unit Rate Total Amount
Description Unit Quantity
No. US $ (letters) US $ (Numbers) US $
Rates include:
1-All the painting materials used should be
approved and tested by approved local
laboratory and have the final approved from
the supervisor engineer.
2- The surface must be dry and clean before
painting.
3- All painting works should provide the
required coverage.
4- All paint works must be according to
specifications , drawings and supervisor
engineer instructions.
5- Contractor shall take into consideration that
all – direct and indirect works and expenses
required for the completion of the coming
items are included in the uint price.
6-Smoothen surfaces of exisiting plastering
before the Commencement paint
7-Providing scafolding to carry out the
external painting
Total
Contractor Signature
Package #3: Completion of Construction 16 buildings. ITB 2011-010
(36 residential units) in Rafah.
Bill No (7)
7. Carpentry works
Item Unit Rate Unit Rate Total Amount
Description Unit Quantity
No. US $ (letters) US $ (Numbers) US $
Total
Contractor Signature
Package #3: Completion of Construction 16 buildings. ITB 2011-010
(36 residential units) in Rafah.
Bill No (8)
8. Metal works
Item Unit Rate Unit Rate Total Amount
Description Unit Quantity
No. US $ (letters) US $ (Numbers) US $
Contractor Signature
Package #3: Completion of Construction 16 buildings. ITB 2011-010
(36 residential units) in Rafah.
Bill No (9)
9. Aluminum works
Item Unit Rate Unit Rate Total Amount
Description Unit Quantity
No. US $ (letters) US $ (Numbers) US $
Contractor Signature
Package #3: Completion of Construction 16 buildings. ITB 2011-010
(36 residential units) in Rafah.
Bill No (10)
10. Plumbing works
Item Unit Rate Unit Rate Total Amount
Description Unit Quantity
No. US $ (letters) US $ (Numbers) US $
Contractor Signature
Package #3: Completion of Construction 16 buildings. ITB 2011-010
(36 residential units) in Rafah.
Bill No (2)
10. Plumbing works
Item Unit Rate Unit Rate Total Amount
Description Unit Quantity
No. US $ (letters) US $ (Numbers) US $
Contractor Signature
Package #3: Completion of Construction 16 buildings. ITB 2011-010
(36 residential units) in Rafah.
Bill No (10)
10. Plumbing works
Unit Rate
Item Quantit Unit Rate Total Amount
Description Unit US $
No. y US $ (letters) US $
(Numbers)
Contractor Signature
Package #3: Completion of Construction 16 buildings. ITB 2011-010
(36 residential units) in Rafah.
Bill No (10)
10. Plumbing works
Item Unit Rate Unit Rate Total Amount
Description Unit Quantity
No. US $ (letters) US $ (Numbers) US $
Total
Contractor Signature
Package #3: Completion of Construction 16 buildings. ITB 2011-010
(36 residential units) in Rafah.
Bill No (11)
11. Electrical works
Item Unit Rate Unit Rate Total Amount
Description Unit Quantity
No. US $ (letters) US $ (Numbers) US $
1) Switches
Contractor Signature
Package #3: Completion of Construction 16 buildings. ITB 2011-010
(36 residential units) in Rafah.
Bill No (11)
11. Electrical works
Item Unit Rate Unit Rate Total Amount
Description Unit Quantity
No. US $ (letters) US $ (Numbers) US $
5) lighting
Supply and install ceiling pendant mounting
lighting luminary with lamp 60w including
a No 120
pvc conduits, box, wires, and all accessories
required.
Contractor Signature
Package #3: Completion of Construction 16 buildings. ITB 2011-010
(36 residential units) in Rafah.
6) Cables
Contractor Signature
Package #3: Completion of Construction 16 buildings. ITB 2011-010
(36 residential units) in Rafah.
Bill No (11)
11. Electrical works
Item Unit Rate Unit Rate Total Amount
Description Unit Quantity
No. US $ (letters) US $ (Numbers) US $
Total
Contractor Signature
Package #3: Completion of Construction 16 buildings. ITB 2011-010
(36 residential units) in Rafah.
Summary
Title ………………………………………..……………………………….
Telephone………………………………………………………………….
Fax ………………………………………………………………………….
Mobile …………………………………………………………………….
Contractor Signature