0.1 SUMMARY
A. Related Documents:
1. Drawings and general provisions of the Subcontract apply to this Section.
2. Review these documents for coordination with additional requirements and information that apply to
work under this Section.
B. After award of all subcontracts for separate components and materials of the [here state general category of
mockup such as "exterior wall systems"], and on basis of preliminary approval of materials and variations to
proposed design of [here state general category of mockup such as "exterior wall systems"], construct full-
scale mock-ups for review of [designs] [construction].
D. Mock-ups shall be complete in all respects and shall represent the final complete [here state general category
of mockup such as "wall assembly"], including [here state components such as "metal components, precast
concrete elements, glazing, sealants and metal finishes".]
E. Construct mock-ups in location and orientation at Project site approved by Project Manager.
F. Do not place orders for [here state components such as "wall components"] or materials, and do no fabrication
until mock-ups are approved.
G. Where review of mock-ups may require revisions of [designs or construction techniques], University will provide
such revisions in writing to Subcontractor.
I. Mock-ups shall remain in place until work on Project is complete, unless otherwise directed by University or
specified. At project completion, remove and dispose of mock-ups.
J. Design and provide structural framework assemblies necessary to support and display mock-ups.