Professional Documents
Culture Documents
MDSI &
dis %
RM10,000,000 and below.
0.0
1,000,001 to RM20,000,000
15.0
RM20,000,001 to RM50,000,000.
17.5
Perils rates
(i) The basic perils rates shall be as
per the Tariff. Discounted perils
premium shall be given on the perils
rates on the material damage sum
insured only in accordance with the
following scale:-
Discount - special rating to large industrial
MDSI &
Discountrate %
Upt RM15,000,000
50
RM15,000,001 to RM50,000,000.
82