Professional Documents
Culture Documents
Internship Report: I. Timeline
Internship Report: I. Timeline
Day 2:
- Continued to re-read the documents.
- Mr.Loc ordered us (the interns) to go to another company to stamp the documents.
- Check-in time is 8:00 AM, lunch break is at 11:30 AM, afternoon shift begins at 1:00 PM, check-
out time is 5:00 PM.
- The company check-in by fingerprints.
Day 3:
- Hand back the design documents, and note with errors by sticky paper (mainly spelling error and
using wrong words)
- Continue to go to the censorship company to stamp the censorship stamps.
- Read carefully the first step of a bridge design project.
II. Conclusion:
1. Target achieved:
- Knowing the process of designing and constructing a road.
- Learn 4 different methods of soft soil treatment.
- Learn the protocol of censoring documents, stages of approving a good design.
- Learn the regulation of the company and some tips of working at Tedi South.
2. Target ahead
- Ask for doing in technical drawings.
- Read documents about bridge design project.
- Ask about projects being run at the moment and ask for the field investigation.
- Learn more about the protocol, aim in legislation.