selama TOX under maintenance
1 TOX
3 DHU
4 Degassing PWIU
5 Absorber V-0401
6 Fin fan
7 DCS
8 Net pit
9 E-0407 at K-0401,CT-0401
10 D-0401
11 F-0202
12 E-0505
13 K-0403A/B
14 F-0502,F-0504,F-0503
PIC
RMP
Pak Udin
Opr + Mtc
Opr
Opr + Mtc
Opr
Honneywell
Vendor + Mtc
Opr + Mtc
Opr
Opr
Opr
Schneider + Lentera
Opr
Job Description
Flushing
Simulasi ESD
Flushing
Test run
Replace filter
Prosedur Prosedur
PIC TS
Isolasi Pekerjaan
Moh Taufiq
Done Done
/Ekhwanto
Jaya Diharja/Andri
Done Done
Yaldi
Bambang S H + Aziz
Done Done
Syueb
ICC/LOTO JSA PSSR
1 V-0101 WS-18-PCD-OPR-001
2 DHU WS-18-PCD-OPR-002
WS-18-PCD-OPR-010
WS-18-PCD-OPR-005
D-0401 WS-18-PCD-OPR-007
6 Replace Carbon Active agru WS-18-PCD-OPR-006
8 ESD WS-18-PCD-OPR-008
9 E-0101,E-0203,E-0205 WS-18-PCD-OPR-009
13 KM-0403 A
P-0202 A
KM-0401 B
KM-1901 A/B/C
P-1301 B
14 TOX
K-0403 A PT LENTERA
K-0403 B PT LENTERA
15 GTG A
16 GTG B
17 GTG C
17 GTG D
18 K-1401 A/B
DAFTAR PEKERJAAN OPERATION SAAT WINDOWS SHUTDOWN
V-0101
PE-0501
P-0501
EM-0505
CT-0401
EM-0407
V-0401 A/B
D-0401
F-0202
ESS/DCS
E-0101,E-0203,E-0205
Y-1801
V-0901
KM-0403 A
P-0202 A
KM-0401 B
KM-1901 A/B/C
P-1301 B
K-0403 A
K-0403 B
DAFTAR PEKERJAAN OPERATION SAAT WINDOWS SHUTDOWN
JENIS PEKERJAAN
Penggantian & Repair pipa carbon dg stainless
Material spool pipa
Bolt & Nut
Gasket
Cleaning stack burner + replace carbon filter
Instal scafodling
Remove stack arrester
modifikasi line flushing stack arrester
fabrikasi gasket
cleaning stack arrester
reinstal stack arrester
cleaning burner
cleaning pilot burner
cleaning shock filter
Replace seal piston
replace lube oil pump
replace seal plug valve
function test
Cleaning fan blade
Install Scafolding
Open baut cover filter
Replace Gasket
Install filter
Cleaning filter
Uninstall
Uninstall fill pack
Cleaning colling tower fill pack
Install fill pack
Uninstall Heat Exchanger
Cleaning Heat Exchanger
Install Heat Exchanger
Open dan close top manual valve 2" V-0401 A/B line fleksible hose
Cleaning & Flushing
Install & Uninstall hose top V-0401 A/B
Open dan close top manual valve 2" D-0401 line fleksible hose
Cleaning & Flushing
Open manhole ( Check gasket 24")
Replace carbon filter
Close manhole
Fuction test ESD & PSD (1 day)
Modifikasi Logic (3 day)
Cek ground fault (7 day)
Cek system alarm (2 day)
Install switcher monitor (1 Day)
Upgrade RAM (1 day)
Instal scafolding for acses cleaning
Instal blue sheet
Cleaning fine tube with chemical cleaning/ anti scale
Applying chemical cleaning (max 10 minutes)
Spray with fresh water
Blowing fin tube
Replace pulley fan & motor
Reallignment fan to motor
Reinstall fan belt
Function test
Install Scafolding
Cleaning Net pit yang terkelupas
Coating liner
Uninstall Scafolding
Open & Close manual valve 2" top V-0901
Cleaning Degassing column
Flushing V-0901
SCHENEIDER
Install Scafolding
Positioner FV -0456
Selenoid A/B ( stand by)
Fuction Test
PM BLOWER
Dismantle blower
Remove Bearing Fan
Remove Bearing Motor
Cleaning Fan Blower
Cleaning Stator/Rotor
Machining Shaft Blower
Machining Rotor
Replace Bearing Fan
Replace Bearing Motor
Solo Run
Alignment
Mechanical Run
Putu eka
Ekhwanto/Arbisah
Ekhwanto /Arbisah
Didik Eko /Amin Taufiq
Putu Eka/Bambang S H
Norman Y /A. Hendri
Jaya Diharja / Putu Sila A
Jaya Diharja / Putu Sila A
PT ANK
Syaiful A /Ismail Fahmi
Ekhwanto / Amin Taufiq
Moh Taufiq
Putu Sila / Ahmad Hendri
AV. Tony Julianto
Syaiful Ashari/Jaya D
PT. LENTERA
PT. LENTERA
Ekhwanto/Putu Eka
Ekhwanto/Putu Eka
Ekhwanto/Putu Eka
Ekhwanto/Putu Eka
Ekhwanto/Syaiful Ashari
Ekhwanto/Syaiful Ashari
Start
Finish
1
2
3
4
5
6
7
8
9
###
###
###
###
###
15 Des 2018
###
###
###
###
###
###
###
###
###
###
1
2
3
4
5
6
7
8
9
###
###
###
###
###
16 Des 2018
###
###
###
###
###
###
###
###
###
###
1
2
3
4
5
6
7
8
9
###
###
###
###
###
17 Des 2018
###
###
###
###
###
###
###
###
###
###
1
2
3
4
5
6
7
8
9
###
###
###
###
###
18 Des 2018
###
###
###
###
###
###
###
###
###
###
1
2
3
4
5
6
7
8
9
###
###
###
###
###
19 Des 2018
19 Des 2018
###
###
###
###
###
###
###
###
###
###
1
2
3
4
5
6
7
8
9
###
###
###
###
###
20 Des 2018
###
###
###
###
###
###
###
###
###
###
LIST JSA PREVENTIVE MAINTENANCE EQUIPMENT CPP GUNDIH WINDOW SHUTDOWN 2018
PE-0501
1 WS-18-JSA-OPR-001
2 WS-18-JSA-OPR-002 EM-0505
3 WS-18-JSA-OPR-003 CT-0401
4 WS-18-JSA-OPR-004 EM-0407
5 WS-18-JSA-OPR-005 V-0401 A/B
6 WS-18-JSA-OPR-006 D-0401
7 WS-18-JSA-OPR-007 V-0901
Prepared by
Jamilatun
NT CPP GUNDIH WINDOW SHUTDOWN 2018
JENIS PEKERJAAN
Cleaning stack burner + replace carbon
filter
Cleaning fan blade
Cleaning colling tower fill pack
Cleaning Heat Exchanger
Cleaning & Flushing
Cleaning & Flushing
Cleaning Degassing column &
Flushing
LIST JSA PREVENTIVE MAINTENANCE EQUIPMENT CPP GUNDIH WINDOW SHUTDOWN 2018
WS-18-JSA-ROT-001 P-0501
WS-18-JSA-ROT-002 E-0101,E-0203,E-0205
WS-18-JSA-ROT-003 K-0403 A
WS-18-JSA-ROT-004 K-0403 B
2 WS-18-JSA-ROT-005 GTG A
WS-18-JSA-ROT-006 GTG B
WS-18-JSA-ROT-007 GTG A
WS-18-JSA-ROT-008 GTG B
WS-18-JSA-INST-001 Replace tubing SO2 Analyzer
WS-18-JSA-INST-002 Replace Positioner XV-0456
WS-18-JSA-INST-003 Replace Solenoid XV-0452 A/B/C
3 WS-18-JSA-INST-004 Recalibration XV-0455 B
WS-18-JSA-INST-005 Trouble shooting O2 Analyzer AT-0452
WS-18-JSA-INST-006 ESS/DCS
WS-18-JSA-ELEC-001 KM-0403 A
WS-18-JSA-ELEC-002 P-0202 A
4
4 WS-18-JSA-ELEC-003 KM-0401 B
WS-18-JSA-ELEC-004 KM-1901 A/B/C
WS-18-JSA-ELEC-005 P-1301 B
Prepared by
Indah Krisdyawati
CPP GUNDIH WINDOW SHUTDOWN 2018
JENIS PEKERJAAN
Repair pipa area prewash
Replace Pipa carbon dengan stainless
Instal scafodling
Install Scafolding
Cleaning Filter / Replace filter
Instal scafolding for acses cleaning
Install Scafolding
Coating liner
Repair PM-0501 A
Cleaning fine tube with chemical cleaning/ anti scale
Fuction Test
PM BLOWER
Cleaning GTG A by MTC
Cleaning pulse filter
Cleaning GTG A by MTC
Cleaning pulse filter
Install Scafolding
Positioner FV -0456
Selenoid A/B ( stand by)
Probe / sensor/ cable
Fuction test ESD & PSD (1 day)
SCHENEIDER
SCHENEIDER
SCHENEIDER
SCHENEIDER
SCHENEIDER
LIST JSA PREVENTIVE MAINTENANCE EQUIPMENT CPP G
1 TOX
3 DHU
4 Degassing PWIU
5 Absorber V-0401
6 Fin fan
7 DCS
8 Net pit
9 E-0407 at K-0401,CT-0401
10 D-0401
11 F-0202
12 E-0505
13 K-0403A/B
14 F-0502,F-0504,F-0503
16 K-1401 A/B
WS-18-ICC-CPPG-001 Perbaikan dinding WHRU
Penggantian pipa carbon dg
WS-18-ICC-CPPG-002
stainless
Cleaning stack burner +
WS-18-ICC-CPPG-003
replace carbon filter
WS-18-ICC-CPPG-004 Flushing
WS-18-ICC-CPPG-005 Cleaning & flushing
WS-18-ICC-CPPG-006 Cleaning by water jet
WS-18-ICC-CPPG-007 Simulasi ESD
WS-18-ICC-CPPG-009 Mech cleaning HE plate
WS-18-ICC-CPPG-010 Flushing
WS-18-ICC-CPPG-011 Replace carbon filter
WS-18-ICC-CPPG-012 Cleaning fin tube
WS-18-ICC-CPPG-013 Test run
WS-18-ICC-CPPG-014 Replace filter
WS-18-ICC-CPPG-015 Cleaning GTG
WS-18-ICC-CPPG-016 PM K-1401 A/B
SHUTDOWN 2018
ICC/LOTO
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Schedule 14-21 Des 2018
Jum,at 14-Dec-18
Sabtu 15-Dec-18
Minggu 16-Dec-18
Senin 17-Dec-18
SHIFT shift 1 shift 2
Group A C
Superintendent Arbisah Putu Sila Adnyana
Field Leader Amin Taufiqurrohman Ahmad Henri
Well Agus Mardiki Lelana Adi Prasadja
DCS Redi Afrianto Ismail Fahmi
Maintenance Saiful Ashari Dewa Putu
Maintenance Dewa Putu
Maintenance Ekhwanto Abdurrohim
Maintenance Saiful Ashari
Laboratory Heri Hermawan Ricki Agus N.
1 Operator Control Desk Bayu Dwi Handoko Indah Setyarini
2 Operator Control Desk Andik Murtoyo Muh. Tigor Saifudin
3 Well & Flow line checker 1 Puji Sri Agung M. Yusuf Irfani
4 Well & Flow line checker 2 Mugi Yuwono Totok Wahyudi
5 GSU & CHU Operator Muhammad Radiono Irwan
6 AGRU 1 Operator A. Suhartono Mustika Ribut Wahyudi
7 AGRU 2 Operator Dwi Yarsito Muhammad Hambali Muhtar
8 DHU Operator Adhi Dwi Kurniawan Iwan Setya Nugroho
9 CTU Operator Eko Novy Aries Setyo P Muhammad Agus Wahyudi
10 BSRU Operator 1 Achmad Zaenal Arifin Priyono
11 BSRU Operator 2 Dollys Murtiayudha Widarto
12 PWIU Operator - Ofer Diandri
13 Utility 1 Operator Jodhi Kristianto Rahman Priyonggo
14 Utility 2 Operator Zaenul Abidin Joni Ariyanto
15 Utility 3 Operator Eko Purwanto Indra Cahyo Kusuma
16 MSPP 1 Operator Adi Maryono Pebri Eko Wijayanto
17 MSPP 2 Operator Arif Faisal Anhari Rahmady Chandra Nugraha
18 MSPP 3 Operator Agil Cheri Prihatna Puguh Ragil Prasetyo
Superintendent Bambang Sri Hardono
Maintenance AV Tony Julianto
DCS M. Aziz Syueb Amrullah
GSU & CHU Operator Muhammad Hudi Asrori
AGRU 1 Operator Anas Arganata
AGRU 2 Operator Aris Sidhibing Adian
DHU Operator Bima Prihartarto Darmawan
CTU Operator Moh. Abdul Jamal
BSRU Operator 1 Muhammad Muslih
BSRU Operator 2 Nita
PWIU Operator Nisa
Additional Manpower shift 1&2
Indah Setyarini
Muh. Tigor Saifudin
M. Yusuf Irfani
Totok Wahyudi
Irwan
Mustika Ribut Wahyudi
Muhammad Hambali Muhtar
Iwan Setya Nugroho
Muhammad Agus Wahyudi
Priyono
Widarto
Ofer Diandri
Rahman Priyonggo
Joni Ariyanto
-
Pebri Eko Wijayanto
Rahmady Chandra Nugraha
Puguh Ragil Prasetyo
Irwan
Mustika Ribut Wahyudi
Muhammad Hambali Muhtar
Iwan Setya Nugroho
Muhammad Agus Wahyudi
Priyono
Widarto
Ofer Diandri
Joni Ariyanto
Pebri Eko Wijayanto
Rahmady Chandra Nugraha
Puguh Ragil Prasetyo
Feri
Teguh
Rainold
Trigan
NAMA
NO
Jum'at / 14 Des 2018 Sabtu / 15 Des 2018 Minggu / 16 Des 2018 senin / 17 Des 2018
1 Supriyono Supriyono Supriyono Supriyono
2 Ahmad Zdamrony Ahmad Zdamrony Ahmad Zdamrony Ahmad Zdamrony
3 Danang K Danang K Danang K Danang K
4 Sahal M Sahal M Sahal M Sahal M
5 Ezra S Ezra S Ezra S Ezra S
6 Endri W Endri W Endri W Endri W
7 Imam P Imam P Imam P Imam P
8 Dwi R Dwi R Dwi R Dwi R
9 Ahmad Bukhory Ahmad Bukhory Ahmad Bukhory Ahmad Bukhory
10 Trigan C Trigan C Trigan C Trigan C
11 Eko Fery Eko Fery Eko Fery Eko Fery
12 Chandra Chandra Chandra Chandra
13 Dani N Dani N Dani N Dani N
14 Faiz M Faiz M Faiz M Faiz M
15 Surya Surya Surya Surya
16 Lukito A Lukito A Lukito A Lukito A
17 Agus Ahmad M Agus Ahmad M Agus Ahmad M Agus Ahmad M
18 Arif T Arif T Arif T Arif T
19 Mahfudi Mahfudi Mahfudi Mahfudi
20 Diki F Diki F Diki F Diki F
21 Zulfikar Zulfikar Zulfikar Zulfikar
22 Ryan Ryan Ryan Ryan
23 Bayu M Bayu M Bayu M Bayu M
24 Raynold Raynold Raynold Raynold
25 Teguh B Teguh B Teguh B Teguh B
26 Andrian Fery A Andrian Fery A Andrian Fery A Andrian Fery A
27 Hariyanto Hariyanto Hariyanto Hariyanto
28 Erwin S Erwin S Erwin S Erwin S
MA
SHIFT
selasa / 18 Des 2018 Rabu / 19 Dec 2018 Kamis / 20 Dec 2018
Agus Ahmad M Agus Ahmad M Agus Ahmad M
Arif Trisno Water Arif Trisno Water Arif Trisno Water
Arif Edi Arif Edi Arif Edi
Dika P Dika P Dika P
Mahfudi Mahfudi Mahfudi
Bagus A Bagus A Bagus A
Arik S Arik S Arik S
Zdamrony Zdamrony Zdamrony
Dwi R Dwi R Dwi R
Danang K Danang K Danang K
Ezra S Ezra S Ezra S
PAGI
Endri W Endri W Endri W
Bayu M Bayu M Bayu M
Faiz M Faiz M Faiz M
Surya Surya Surya
Trigan C Trigan C Trigan C
Ryan Cahyo Ryan Cahyo Ryan Cahyo
Lukito A Lukito A Lukito A
- Andrian feri A Andrian feri A
Chandra Chandra Chandra
Dani N Dani N Dani N
Bukhory Bukhory Bukhory
Supriyono Supriyono Supriyono
Imam P Imam P Imam P SIANG
Sahal M Sahal M Sahal M
Eko Fery Eko Fery Eko Fery
Raynold R Raynold R Raynold R MALAM
Teguh B Teguh B Teguh B
KETERANGAN
MONITORING O&M WINDOW SHUTDOWN 2018
NO DURATION
0 MATERIAL
- SLIP BLIND
- GASKET
- SCAFOLDING
- TOOL
- CONSUMABLE
- SAFETY CONE
- SARUNG TANGAN
- SARUNG TANGAN KULIT
- RANTAI
- GEMBOK
- TAGGING/LOTO
- SAND FILTER
- CARBON ACTIVE FILTER ( AGRU )
- HCL TANK
- FLEXIBLE HOSE
- CARBON ACTIVE DHU & CARBON SHOCK FILTER
- Diesel fuel consumption shutdown TOX ( EDG,GTG,TOX)
1 OPERATION
- SHUTDOWN
- ISOLATION LINE
- GSU
V-0101
E-0101
- AGRU
F-0202
E-0205,E-0203,E-0201
- BSRU
ABSORBER A
ABSORBER B
CT-0401
HE-0407
- TOX
- DHU
PE-0501
F-0501,F-0503 & F-0504
E-0505
- PWIU
V-0901
PE-0901
- Net PIT
Y-1801
- PURGING
- GSU
- CLEANING & FLUSHING
- BSRU
- COOLING TOWER
- UNISOLATION LINE
- GSU
V-0101
E-0101
- AGRU
F-0202
E-0205,E-0203,E-0201
- BSRU
ABSORBER A
ABSORBER B
- TOX
- DHU
PE-0501
F-0501,F-0503 & F-0504
E-0505
- PWIU
V-0901
PE-0901
- STARTUP
- UTILITY
- GAS PLANT
- SALES GAS
2 MAINTENANCE PIPING & STATIC
- INSTALL PIPING ISOLATION
- GSU
Dismantle, repair dan install line (01-4"-PW-B05-01008)
Repair Line area Prewash
1 01-2"-PL-B05-01017
2 01-2"-PW-B05-01010
3 01-3/4-PW-B05-01014
4 01-3/4-PW-B05-01017
5 01-3/4-PW-B05-01018
6 01-3/4-PW-B05-01012
7 01-3/4-PW-B05-01013
8 01-3/4-PW-B05-01016
9 01-2"-CD-A04-01015
- INSTALL SCAFOLDING
- GSU
Install scaffolding di line 01-4"-PW-B05-01008
EM-0101 A/A2
- AGRU
EM-0201, EM-0203, EM-0205
- BSRU
TOX
- DHU
PE-0501
E-0505
- UN INSTALL SCAFFOLDING
- GSU
Uninstall scaffolding di line 01-4"-PW-B05-01008
EM-0101 A/A2
- AGRU
EM-0201, EM-0203, EM-0205
- BSRU
TOX
- DHU
PE-0501
E-0505
CLEANING FILTER
F-0501
F-0503
F-0504
3 MAINTENANCE INSTRUMENTATION
- Replace Tubing SO2 Analyzer
- Replace Positioner XV-456
- Replace Selenoid XV-0452 A/B/C
- Reconfigurasi XV-0455 B
- Troubleshoot AT-0452
4 MAINTENANCE ELECTRIC
- RackOut Elecrical System
- Rackin Electrical System
- Panel Electrical
- Witness Schenaider KM-0401 B, KM-0403 A, KM-1901 A/B/C, PM-1301 B, PM-0202 A
5 MAINTENANCE ROTATING 8.3%
- GSU 19.00
- Cleaning fin fan cooler dengan water jet dan chemical EM-0101 A1/A2 1.00
- AGRU 1.00
- Cleaning fin fan cooler dengan water jet dan chemical EM-0205 A1/A2 1.00
- UTILITY 1 1.00
- Cleaning Air intake Filter,Cone, mist separator, lube oil cooler GTG A 1.00
- Cleaning Air intake Filter,Cone, mist separator, lube oil cooler GTG B
- Cleaning Air intake Filter,Cone, mist separator, lube oil cooler GTG C
- Cleaning Air intake Filter,Cone, mist separator, lube oil cooler GTG D
- UTILITY 3 1.00
- Cleaning Air intake filter dan cooler, make-up lube oil KM-1401 A 1.00
- Cleaning Air intake filter dan cooler, make-up lube oil KM-1401 A 1.00
- DHU 1.00
1.00
1.00
% Target % ACTUAL
DURATION
START FINISH START FINISH
29 0
1 0 - 43,449
1 0 - 43,449
1 0 - 43,449
1 0 - 43,449
1 0 - 43,449
1 0 - 43,449
1 0 - 43,449
1 0 - 43,449
1 0 - 43,449
1 0 - 42,862
1 0 - 42,862
1 0 - 43,449
1 0 - 43,449
1 0 - 43,449
1 0 - 43,449
1 0 - 43,449
1 0 - 43,449
1 0 - 43,449
1 0 - 43,449
1 0 - 43,449
1 0 - 43,449
1 0 - 43,449
1 0 - 43,449
1 0 - 43,449
1 0 - 43,449
1 0 - 43,449
1 0 - 42,863
1 0 - 42,863
1 0 - 42,877
16 0
1 0 - 42,863
1 0 - 42,862
1 0 - 42,862
1 0 - 42,863
1 0 - 42,863
1 0 - 42,861
1 0 - 42,861
1 0 - 42,861
1 0 - 42,881
1 0 - 42,880
1 0 - 42,881
1 0 - 42,879
1 0 - 42,861
1 0 - 42,862
1 0 - 42,866
1 0 - 42,867
1 0 -
1 0 - 42,872
1 0 - 42,871
1 0 - 42,871
1 0 - 42,872
1 0 - 42,872
4 0 -
1 0 - 42,875
1 0 - 42,880
1 0 - 42,869
1 0 - 42,871
15 0 -
1 0 - 42,879
1 0 - 42,861
1 0 - 42,862
1 0 - 42,863
1 0 - 42,864
1 0 - 42,865
1 0 - 42,866
1 0 - 42,867
1 0 - 42,868
1 0 - 42,869
1 0 - 42,870
1 0 - 42,871
1 0 - 42,872
1 0 - 42,873
1 0 - 42,874
O&M WINDOW SHUTDOWN
03-May-17
AREA
SHIFT 1 SHIFT 2 SHIFT 3
DCS 1
DCS 2
Well & Flow line 1 1). Prepare Well 1). Prepare Well 1). Prepare Well
Well & Flow line 2 Shutdown Shutdown Shutdown
2). Pastikan koneksi Hose 2). Pastikan koneksi Hose 2). Pastikan koneksi Hose
GSU & CHU from N2 Truck to manifold from N2 Truck to manifold from N2 Truck to manifold
AGRU 1 ready
- ready
- ready
-
AGRU 2 - - -
DHU - - -
CTU -1). Cek hose & accessories -1). Cek hose & accessories -1). Cek hose & accessories
BSRU 1 untuk Aerasirinsing
2). Monitor Bioreactor
& untuk Aerasirinsing
2). Monitor Bioreactor
& untuk Aerasirinsing
2). Monitor Bioreactor
&
BSRU 2 (TOX) by K-1404
drain to pond Absorber A by K-1405
drain to pond Absorber A by K-1406
drain to pond Absorber A
PWIU by
- Tracon by
- Tracon by
- Tracon
Utility 1
Utility 2
Utility 3
MSPP 1
MSPP 2
MSPP 3
1). 10.00 makeup Resin 1). kontinyu makeup Resin -
Piping MAINTENANCE KATION/ANION KATION/ANION
Electrical MAINTENANCE - - -
Rotating MAINTENANCE - - -
Instrument MAINTENANCE - - -
04-May-17 05-May-17
SHIFT 1 SHIFT 2 SHIFT 3 SHIFT 1 SHIFT 2
Sales Gas STOP @24.00 Cleaning Dekstop DCS Cleaning Dekstop D
punch list Well Shutdown 1). @22.00 close 1). @24.00 Well 1). @08.00 LOTO WELL 2).
KTB 1/2/4/6
punch list Well Shutdown RBT2,RBT1, KDL Shutdown Kalibrasi HH-LL Pilot
KDL,RBT-01/02
punch list Shutdown 1).@24.00 GSU & CHU 1). @08.00 Depress,
GSU/CHU
punch list Shutdown Shutdown 1). DrainN2,
Purging lineBlinding
B/P FV-0212
1).@24.00 AGRU
AGRU Shutdown A/B
1). Kontinyu Dryout TOX 1). Kontinyu Dryout TOX 1). Kontinyu Dryout TOX 1). Kontinyu Dryout TOX 1). @24.00 Dryout stop
21-May-17
SHIFT 3 SHIFT 1 SHIFT 2 SHIFT 3 SHIFT 1
No. ICC
No JSA
No. SIKA
Date
1 Isolation Line
Electrical Isolation
3 (Local/SS/)
Instrument Isolation
4 (SDV/BDV/MOV/XV/CV)
5 Process Review
6 HSE Review
PT RMP
PT HIKMA PUTRI ( Pak
PT ANK
PT TS
PT Sheneider
NDOVER FORM
NTENANCE WINDOW SHUTDOWN 2017
RAL PROCESSING PLANT GUNDIH
FIELD LEADER
HSE LEADER
PT RMP
PT HIKMA PUTRI ( Pak udin)
PT ANK
PT TS
PT Sheneider
RK
PSSR of Window Shutdown TOX-
RELATED DEPARTEMENT
NO PSSR TITLE UNIT
DEPARTEMENT
1 Perbaikan dinding WHRU TOX OPERATION
Replace tubing SO2 Analyzer ENGINEERING
Replace Positioner XV-0456 MECHANICAL/STA/PIPING
Replace Solenoid XV-0452 A/B/C ELECTRICAL
Recalibration XV-0455 B INSTRUMENT
Trouble shooting O2 Analyzer AT-0452 HSE
OTHERS
2 Ganti pipa & Piping GSU OPERATION
ENGINEERING
MECHANICAL/STA/PIPING
ELECTRICAL
INSTRUMENT / CIS
HSE
OTHERS
3 Carbon Filter AGRU OPERATION
ENGINEERING
MECHANICAL/STA/PIPING
ELECTRICAL
INSTRUMENT / CIS
HSE
OTHERS
4 Cleaning & Flushing V-0401 A/B BSRU OPERATION
ENGINEERING
MECHANICAL/STA/PIPING
ELECTRICAL
INSTRUMENT / CIS
HSE
OTHERS
5 Cleaning CT-0401 /E-0407 BSRU OPERATION
ENGINEERING
MECHANICAL/STA/PIPING
ELECTRICAL
INSTRUMENT / CIS
HSE
OTHERS
6 Cleaning D-0401 BSRU OPERATION
ENGINEERING
MECHANICAL/STA/PIPING
6 Cleaning D-0401 BSRU
ELECTRICAL
INSTRUMENT / CIS
HSE
OTHERS
6 PE-0501 Cleaning stack burner + replace DHU OPERATION
carbon filter ENGINEERING
MECHANICAL/STA/PIPING
ELECTRICAL
INSTRUMENT / CIS
HSE
OTHERS
7 Cleaning Degassing PWIU OPERATION
ENGINEERING
MECHANICAL/STA/PIPING
ELECTRICAL
INSTRUMENT / CIS
HSE
OTHERS
OPERATION
ENGINEERING
MECHANICAL/STA/PIPING
8 Cleaning E-0101 A1/A2,E-0203 ,E-0205 GSU,AGRU ELECTRICAL
INSTRUMENT / CIS
HSE
OTHERS
9 Cleaning Net Pit (Y-1801) OPERATION
ENGINEERING
MECHANICAL/STA/PIPING
ELECTRICAL
INSTRUMENT / CIS
HSE
OTHERS
10 OPERATION
ENGINEERING
MECHANICAL/STA/PIPING
ELECTRICAL
INSTRUMENT / CIS
HSE
OTHERS
11 OPERATION
ENGINEERING
MECHANICAL/STA/PIPING
ELECTRICAL
INSTRUMENT / CIS
HSE
OTHERS
12 OPERATION
ENGINEERING
MECHANICAL/STA/PIPING
ELECTRICAL
INSTRUMENT / CIS
HSE
OTHERS
hutdown TOX- 2018
ED DEPARTEMENT
CHECK ETC REMARK
SIGN OFF
LIST
MONITORING O&M WINDOW SHUTDOWN 2019
O&M WINDOW SHUTDOWN 2017 STATUS
WEEKS W1 W2 W1 W2 W3
DATE 14-Dec-18 15-Dec-18 16-Dec-18 17-Dec-18 18-Dec-18
Planning - Cummulative. 0.00% 0.00% 0.00% 3.18% 8.48%
Planning - In Week 0.00% 0.00% 0.00% 3.18% 5.31%
Actual - Cummulative 0.00% 0.00% 0.00% 3.18% 8.48%
Actual - In Week 0.00% 0.00% 0.00% 3.18% 5.31%
Deviasi Cummulative 0.00% 0.00% 0.00% 0.00% 0.00%
MATERIAL STATUS
WEEKS W1 W2 W1 W2 W3
DATE 14-Dec-18 15-Dec-18 16-Dec-18 17-Dec-18 18-Dec-18
Planning - Cummulative. 0.00% 0.00% 0.00% 3.18% 8.48%
Planning - In Week 0.00% 0.00% 0.00% 3.18% 5.31%
Actual - Cummulative 0.00% 0.00% 0.00% 3.18% 8.48%
Actual - In Week 0.00% 0.00% 0.00% 3.18% 5.31%
Deviasi Cummulative 0.00% 0.00% 0.00% 0.00% 0.00%
OPERATION STATUS
WEEKS W1 W2 W1 W2 W3
DATE 20-Feb-17 27-Feb-17 28-Apr-17 13-Mar-17 20-Mar-17
Planning - Cummulative. 0.00% 0.00% 0.00% 3.18% 8.48%
Planning - In Week 0.00% 0.00% 0.00% 3.18% 5.31%
Actual - Cummulative 0.00% 0.00% 0.00% 3.18% 8.48%
Actual - In Week 0.00% 0.00% 0.00% 3.18% 5.31%
Deviasi Cummulative 0.00% 0.00% 0.00% 0.00% 0.00%
MAINTENANCE STATUS
WEEKS W1 W2 W1 W2 W3
DATE 20-Feb-17 27-Feb-17 28-Apr-17 13-Mar-17 20-Mar-17
Planning - Cummulative. 0.00% 0.00% 0.00% 3.18% 8.48%
Planning - In Week 0.00% 0.00% 0.00% 3.18% 5.31%
Actual - Cummulative 0.00% 0.00% 0.00% 3.18% 8.48%
Actual - In Week 0.00% 0.00% 0.00% 3.18% 5.31%
Deviasi Cummulative 0.00% 0.00% 0.00% 0.00% 0.00%
2019
CURRENT
W4 W5 STATUS
19-Dec-18 20-Dec-18 13-Nov-19
15.26% 22.04%
6.78% 6.78%
15.48% 23.48%
7.00% 8.00%
0.22% 1.44%
CURRENT
W4 W5 STATUS
19-Dec-18 20-Dec-18 13-Nov-19
15.26% 22.04%
6.78% 6.78%
15.48% 23.48%
7.00% 8.00%
0.22% 1.44%
CURRENT
W4 W5 STATUS
27-Mar-17 3-Apr-17 13-Nov-19
15.26% 22.04%
6.78% 6.78%
15.48% 23.48%
7.00% 8.00%
0.22% 1.44%
CURRENT
W4 W5 STATUS
27-Mar-17 3-Apr-17 13-Nov-19
15.26% 22.04%
6.78% 6.78%
15.48% 23.48%
7.00% 8.00%
0.22% 1.44%
O&M WINDOW SHUTD
PT PERTAMINA E
% P ro g re s s C u m u la tiv e
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
53.38
2786
2793
2807
2814
2821
20%
10%
0%
42853.38
42786
42793
42807
42814
42821
Planning - Cummulative.
Actual - Cummulative
% P ro g re s s C u m u la tiv e
MAT
110%
100%
90%
80%
70%
60%
50%
40%
60%
50%
40%
30%
20%
10%
0%
42853.38
42814
42786
42793
42807
42821
Planning - In Week
Actual - In Week
% P ro g re s s C u m u la tiv e
OPE
100%
90%
80%
OPE
100%
% P ro
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
42853.38
42786
42793
42807
42814
42821
Planning - Cummulative.
Actual - Cummulative
s C u m u la tiv e
% P ro g re s s C u m u
MA
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
42853.38
42814
42786
42793
42807
42821
Planning - Cummulative.
Actual - Cummulative
OW SHUTDOWN MAY @2017 "S" CURVE
ERTAMINA EP ASSET 4 FIELD CEPU
PLAN IN C
ACTUAL IN C
DEV
2814
2821
2828
2835
2842
2849
2856
2863
42814
42821
42828
42835
42842
MATERIAL STATUS
42849
42856
42863
PLAN IN C
42814
42821
42828
42835
42842
OPERATION STATUS
42849
42856
42863
DEV
ACTUAL IN C
PLAN IN C
42814
42821
42828
42835
42842
OPERATION STATUS
42849
42856
42863
DEV
ACTUAL IN C
PLAN IN C
MAINTENANCE STATUS
PLAN IN C
ACTUAL IN C
DEV
42814
42863
42821
42828
42835
42842
42849
42856
"S" CURVE
D CEPU
ATUS
2863
2870
2877
2884
2891
42856
42863
42870
42877
42884
DATE
42870
42877
42884
42891
DATE
PLAN IN CUM =100.0%
ACTUAL IN CUM =82.2%
DEVIASI =-17.8%
42856
42863
42870
42877
42884
42891
DATE
PLAN IN CUM =100.0%
ACTUAL IN CUM =82.2%
DEVIASI =-17.8%
42863
42856
42870
42877
42884
42891
DATE