You are on page 1of 1

PLATFORM PLATFORM PLATFORM PLATFORM

I-SECTION AT +5550 LVL I-SECTION AT +5550 LVL I-SECTION AT +5550 LVL I-SECTION AT +5550 LVL

1000

1000

GATE
BPCL
P1 P1 P1 P1 P1 P1 P1 P1 P1

SED
PROPO
I-SECTION I-SECTION
I-SECTION
I-SECTION I-SECTION I-SECTION I-SECTION I-SECTION I-SECTION I-SECTION

5550 LVL & 7650 LVL 5550 LVL & 7650 LVL 5550 LVL & 7650 LVL 5550 LVL & 7650 LVL 5550 LVL & 7650 LVL 5550 LVL & 7650 LVL 5550 LVL & 7650 LVL 5550 LVL & 7650 LVL 5550 LVL & 7650 LVL

5000
DRAIN LINE DRAIN LINE DRAIN LINE DRAIN LINE DRAIN LINE DRAIN LINE DRAIN LINE DRAIN LINE

CATWALK MS GRATING
AT +6150 LVL
ORIENTATION: TL GANTR

1200
P1 P1 P1 P1 P1 P1 P1 P1 P1

E
Grid North

6°52'31"

S
5000 2000 4000 2000 4000 2000 4000 2000 4000 2000 4000 2000 4000 2000 3500 1550 Magnatic North

W
KEY PLAN
3800

STAIR STAIR STAIR STAIR STAIR STAIR STAIR STAIR

U MS GRATING U MS GRATING U MS GRATING U MS GRATING U MS GRATING U MS GRATING U MS GRATING MS GRATING


U

P2 P2 P2 P2 P2 P2 P2 P2

12000
2250

HANDRAILS PLATFORM PLATFORM PLATFORM PLATFORM PLATFORM PLATFORM PLATFORM PLATFORM


ABOVE AT +3350 LVL AT +3350 LVL AT +3350 LVL AT +3350 LVL AT +3350 LVL AT +3350 LVL AT +3350 LVL AT +3350 LVL

HANDRAILS HANDRAILS HANDRAILS HANDRAILS HANDRAILS HANDRAILS HANDRAILS


ABOVE ABOVE ABOVE ABOVE ABOVE ABOVE ABOVE
4850

STAIR STAIR STAIR STAIR STAIR STAIR STAIR STAIR

P1 P1
U
P1U P1
U
P1U P1U P1
U
P1
U
P1U
6000 6000 6000 6000 6000 6000 6000 6000

TL GANTR LAN
PURLINE PURLINE PURLINE PURLINE PURLINE PURLINE PURLINE PURLINE
GALVALUME SHEET
PURLINE PURLINE PURLINE PURLINE PURLINE PURLINE PURLINE PURLINE

TRUSS

TRUSS
TRUSS

TRUSS

TRUSS

TRUSS

TRUSS

TRUSS

TRUSS
PURLINE PURLINE PURLINE PURLINE PURLINE PURLINE PURLINE PURLINE
PURLINE PURLINE PURLINE PURLINE PURLINE PURLINE PURLINE PURLINE
PURLINE PURLINE PURLINE PURLINE PURLINE PURLINE PURLINE PURLINE
PURLINE PURLINE PURLINE PURLINE PURLINE PURLINE PURLINE PURLINE LEVEL- 20.00

TL GANTR

2100
01 02 0 0 05 0 0 0 LEVEL- 17.90

HAND RAIL
HAND RAIL HAND RAIL HAND RAIL HAND RAIL HAND RAIL HAND RAIL HAND RAIL

2800
HAND RAIL HAND RAIL HAND RAIL HAND RAIL HAND RAIL HAND RAIL HAND RAIL

SWING PLATEFORM SWING PLATEFORM SWING PLATEFORM SWING PLATEFORM SWING PLATEFORM SWING PLATEFORM SWING PLATEFORM SWING PLATEFORM
LEVEL- 15.10

3350
I-SECTION I-SECTION I-SECTION I-SECTION I-SECTION I-SECTION I-SECTION I-SECTION

STAIR STAIR STAIR STAIR STAIR STAIR STAIR STAIR

FFL- 11.75
FGL- 11.30

RONT ELE ATION MAIN RAFTER (MS PIPE)


GALVALUME SHEET

PURLINE (MS PIPE) PURLINE (MS PIPE)

WEB MEMBER KING POST TUBULAR TRUSS


(MS PIPE) (MS PIPE)

I-SECTION
GUSSET PLATE
MAIN TIE (MS PIPE)
TIE RUNNER
LEVEL- 19.40
2100

5000 HANDRAIL

I-SECTION PROPOSED TLF GANTRY GA DRAWING K.S. K.B. T.M.


LEVEL- 17.30 0 09-10-19
REV DATE DESCRIPTION DRAWN CHECKED APPROVED
HANDRAIL I-SECTION
2800

CLIENT DETAIL CONSULTANT


8250

7650

MAGENDRA CONSTRUCTION & CONSULTANTS


An ISO 9001 : 2015 Certified Company
LEVEL- 15.10
A Gro p of
5550

:: ENGINEERS :: ARC ITECTS


HANDRAIL :: ALUER :: SUR E OR
I-SECTION I-SECTION :: UR AN LANNER
:: RO ECT MANAGEMENT
3350

:: STRUCTURAL DESIGN CONSULTANTS


PROJECT NEW POL DEPOT AT KALABURAGI Mail Us At - magendra.construction@gmail.com/tarunmagendra11@gmail.com
Contact Us - (O) 0771-4903599 (M) +919617623999
PEDESTAL Corp Offi e 511/512 ,5th Floor ,Golden Trade Center ,New Rajendra Nagar
DRAWN K.S. 09-10-2019 TITLE :
Raipur (C.G) 492001
FFL- 11.75 CHECKED K.B. 09-10-2019 TLF GANTRY GA DRAWING #SAVE WATER/SAVE TREE/SAVE ENERGY/SAVE EARTH#
FGL- 11.30 APPROVED T.M. 09-10-2019 OF KALABURAGI DEPOT
DRAIN SCALE
SIDE ELE ATION DRG. NO. :
MC&C/TG/GA-01/BPCL/KB/19
SHEET REV.
TG/GA-01

You might also like