Total No. of HH= 231 Total Population= 1155 ADD = 2.74 (Lps)
Projected No. of HH= 355 Pop. at Start of Operation= 1206 MDD = 3.56 (Lps)
No. of Tap Stand= Projected Population= 1777 PHD = 5.48 (Lps)
No. Name of Barangay/s HH Present Pop. Proj. Pop. ADD (LPD) ADD (LPs) MDD (Lps)
1 Sitios Balisong & Pawas 231 1155 1777 236879 2.74 3.56
2 0 0 0 0.00 0.00
3 0 0 0 0.00 0.00
4 0 0 0 0.00 0.00
5 0 0 0 0.00 0.00
6 0 0 0 0.00 0.00
7 0 0 0 0.00 0.00
8 0 0 0 0.00 0.00
9 0 0 0 0.00 0.00
10 0 0 0 0.00 0.00
11 0 0 0 0.00 0.00
12 0 0 0 0.00 0.00
13 0 0 0 0.00 0.00
14 0 0 0 0.00 0.00
15 0 0 0 0.00 0.00
16 0 0 0 0.00 0.00
17 0 0 0 0.00 0.00
18 0 0 0 0.00 0.00
19 0 0 0 0.00 0.00
20 0 0 0 0.00 0.00
21 0 0 0 0.00 0.00
22 0 0 0 0.00 0.00
23 0 0 0 0.00 0.00
24 0 0 0 0.00 0.00
25 0 0 0 0.00 0.00
26 0 0 0 0.00 0.00
27 0 0 0 0.00 0.00
28 0 0 0 0.00 0.00
29 0 0 0 0.00 0.00
30 0 0 0 0.00 0.00
31 0 0 0 0.00 0.00
32 0 0 0 0.00 0.00
33 0 0 0 0.00 0.00
34 0 0 0 0.00 0.00
35 0 0 0 0.00 0.00
36 0 0 0 0.00 0.00
37 0 0 0 0.00 0.00
38 0 0 0 0.00 0.00
39 0 0 0 0.00 0.00
40 0 0 0 0.00 0.00
41 0 0 0 0.00 0.00
42 0 0 0 0.00 0.00
43 0 0 0 0.00 0.00
44 0 0 0 0.00 0.00
45 0 0 0 0.00 0.00
46 0 0 0 0.00 0.00
47 0 0 0 0.00 0.00
48 0 0 0 0.00 0.00
49 0 0 0 0.00 0.00
50 0 0 0 0.00 0.00
51 0 0 0 0.00 0.00
52 0 0 0 0.00 0.00
53 0 0 0 0.00 0.00
54 0 0 0 0.00 0.00
55 0 0 0 0.00 0.00
56 0 0 0 0.00 0.00
57 0 0 0 0.00 0.00
58 0 0 0 0.00 0.00
59 0 0 0 0.00 0.00
60 0 0 0 0.00 0.00
61 0 0 0 0.00 0.00
62 0 0 0 0.00 0.00
63 0 0 0 0.00 0.00
64 0 0 0 0.00 0.00
65 0 0 0 0.00 0.00
66 0 0 0 0.00 0.00
67 0 0 0 0.00 0.00
68 0 0 0 0.00 0.00
69 0 0 0 0.00 0.00
70 0 0 0 0.00 0.00
71 0 0 0 0.00 0.00
72 0 0 0 0.00 0.00
73 0 0 0 0.00 0.00
74 0 0 0 0.00 0.00
75 0 0 0 0.00 0.00
76 0 0 0 0.00 0.00
77 0 0 0 0.00 0.00
78 0 0 0 0.00 0.00
79 0 0 0 0.00 0.00
80 0 0 0 0.00 0.00
Total 231 1155 1777 236879 2.74 3.56
"This spreadhseet accomplishes an input to the Simplified FS Template Worksheet.
Enter the data in the white shaded cells only."
✘ (Req'd) FORMULA:
59 cum ADD = [Proj.Pop x Consumption Rate]/(1-NRW)
9m MDD = 1.3 xADD
2.6 PHD = 2.0 xADD
2.9 Storage Capacity = 25%xADD
Pumping Rate (lps) = MDD (Lpd)/Pumping Hours/3600
1.37 Hrs
82 mins
New Sys. Rehab Expansion
NRW =
15% 20% 25%
Construction of Level II Potable Water System (For Design and Build) DESIGN CRITERIA
a. Design Period b. Population c. Population at the start d. Population at Design Year e. Ave. No. of People
(years) Growth Rate (annual) of the Project per Household
Does the community have skilled personnel? Are there competent contractors within the area?
o
✘ Yes o No Plumbing contractor o Yes o
✘ No
If yes, how many: Tank fabricator o Yes o
✘ No
o Available
✘ o Not Available Jeepney, Motorcycle (Habal-habal) 8347
Main Livelihood of Residents (as % of Population)
Farming 80% Fishing 5% Services Enterpreneur/Own Business
Sector % Business Type %
Self Employed 35 Retail Store 5
Employed Agriculture 15
Private 9% Govt 4%
C. HEALTH INFORMATION
Number of Water-Related Disease Cases Last Year
Diarrheal Diseases Skin Diseases Cholera Hepatitis A Others
0 0 0 0 4
Number of Households with Sanitary Toilets
Flush Pour Flush Ventilated Improved Pit
779 3 0
Number of Households with Insanitary Toilets
Open/Closed Pit Overhang Without Toilets
34 0 237
1 2 3 4 5 6 7 8 9 ###11 #######################################################################################
Totals
Unit Cost (Peso)
Total Cost (Peso) 400,000.00
2. Target number of beneficiary families or households 3. Average monthly family or household income
167 8,347.00
4. Present average monthly family or household expense on 5. Average monthly amount the family or household is willing
water (amount spent for buying water and paying others to to pay for water (to avail of an improved water supply service)
fetch water)
200 150
H. INSTITUTIONAL INFORMATION
Attach map of the area. Please indicate location of houses, and structures which have access or no access to water
supply. Please indicate locations of existing wells and springs and/or possible sources of water supply. The map should preferably
be drawn to scale.
Scale: 1:50,000
Sagana at Ligtas na Tubig sa Lahat Form 5
A Program funded by the GAA Provision for Potable Water Supply
Name of Project Cross-section of well source/
plan of spring source
Construction of Level II Potable Water System (For Design and Build)
development/ others
Well
Item Description (or attach detailed item desription)
Unit Qty Unit Cost Total Cost
1. Well drilling m
2. Supply and installation of hand pump pc
3. Construction of apron m3
4. Treatment / Disinfection Lump sum
Total Project Cost
Spring
Item Description (or attach detailed item desription)
Rainwater
Item Description (or attach detailed item desription)
2. Cistern m3
3. Treatment / Disinfection LS
Total Project Cost
No.
Week Number
of
Schedule of Activities Days 1 2 3 4 5 6 7
1. Land acquisition
2. Mobilization and site preparation
3. Construction
4. Site restoration and demobilization
(Provide additional sheets if necessary)
1 2 3 4 5 6 7 8
Form 6b
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
1. Source Confirmation
10% Contingency
A. PRE-CONSTRUCTION COST
1. Georesistivity Survey
2. Detailed Engineering Design (DED)
B. CONSTRUCTION COST
4. Source Development
Total Contributions
Construction of Level II Potable Water System (For Design and Build) FINANCIAL ANALYSIS
Total Project Cost 2,000,000.00