You are on page 1of 61

SECTION OF BQ

SECTION A PREAMBLE
B WORK ITEMS
PART 1 - GENERAL ITEMS
PART 2 - ENVIRONMENTAL PROTECTION AND ENHANCEMENT
PART 3 - TRAFFIC MANAGEMENT AND CONTROL
PART 4 - SITE INVESTIGATION WORK
PART 5 - DEMOLITION AND SITE CLEARANCE
PART 6 - MISCELLANEOUS WORK
PART 7 - EARTHWORK
WORK ITEM SUB-TOTAL

PACKAGE 1

ZONE 1
PART 8- ROADWORKS
PART 9- DRAINAGE
PART 10- SEWERAGE
PART 11- WATER RETICULATION
ZONE 1 SUB-TOTAL
ZONE 2
PART 12- ROADWORKS
PART 13- DRAINAGE
PART 14- SEWERAGE
PART 15- WATER RETICULATION
ZONE 2 SUB-TOTAL
TOTAL PACKAGE 1
PACKAGE 2
ZONE 3
PART 16- DRAINAGE
PART 17- WALKWAY & ESPLANADE
PART 18- BRIDGE
PART 19- SOFTSCAPE
PART 20- RIVER BANK REVETMENT
PART 21- BANK PROTECTION
ZONE 4
PART 22- EARTHWORK
PART 23- WATER RETICULATION
PART 24 - SEWERAGE
PART 25 - ROADWORKS
PART 26 - DRAINAGE
PART 27- HARDSCAPE
PART 28- SOFTSCAPE
PART 29- BANK PROTECTION
PART 30- WALKWAY, ESPLANADE & WETLAND
PART 31- RIVER BANK REVETMENT
PART 32- PUBLIC TOILET
PART 33- PARKING LOT
PART 34- PLAYGROUND
TOTAL PACKAGE 2
PACKAGE 3

ZONE 5
PART 35- ROADWORKS
PART 36- DRAINAGE
PART 37- SEWERAGE
PART 38- WATER RETICULATION
ZONE 5 SUB-TOTAL
ZONE 6
PART 39- ROADWORKS
PART 40- DRAINAGE
PART 41- SEWERAGE
PART 42- WATER RETICULATION
ZONE 7 SUB-TOTAL
TOTAL PACKAGE 3
PACKAGE 4

ZONE 7
PART 43- ROADWORKS
PART 44- DRAINAGE
PART 45- SEWERAGE
PART 46- WATER RETICULATION
ZONE 7 SUB-TOTAL
ZONE 8
PART 47- ROADWORKS
PART 48- DRAINAGE
PART 49- SEWERAGE
PART 50- WATER RETICULATION
ZONE 8 SUB-TOTAL
TOTAL PACKAGE 4
C DAYWORK SCHEDULE
D GRAND SUMARY
NETT TOTAL
AMOUNT
Item Description Amount (RM)

GRAND SUMMARY From Page :

PACKAGE 2

PART 1 - GENERAL ITEMS


PART 2 - ENVIRONMENTAL PROTECTION AND ENHANCEMENT
PART 3 - TRAFFIC MANAGEMENT AND CONTROL
PART 4 - SITE INVESTIGATION WORK
PART 5 - DEMOLITION AND SITE CLEARANCE
PART 6 - MISCELLANEOUS WORK
PART 7 - EARTHWORK

Subtotal Package 2

ZONE 3
PART 16- DRAINAGE
PART 17- WALKWAY & ESPLANADE
PART 18- BRIDGE
PART 19- SOFTSCAPE
PART 20- RIVER BANK REVETMENT
PART 21- BANK PROTECTION

Subtotal Zone 3:

ZONE 4
PART 22- EARTHWORK
PART 23- WATER RETICULATION
PART 24 - SEWERAGE
PART 25 - ROADWORKS
PART 26 - DRAINAGE
PART 27- HARDSCAPE
PART 28- SOFTSCAPE
PART 29 - BANK PROTECTION
PART 30- WALKWAY, ESPLANADE & WETLAND
PART 31- RIVER BANK REVETMENT
PART 32- PUBLIC TOILET
PART 33- PARKING LOT
PART 34- PLAYGROUND

Subtotal Zone 4:
TOTAL PACKAGE 2
Total of Bill No. 3 - PENGINDAHAN DAN PEMBERSIHAN SUNGAI
MELAKA, PARCEL 2
Carried to Final Summary of Tender
PART 1
General Items
Item No. Code No. Description Unit Qty. Rate Amount (RM)

A100 CONTRACTUAL REQUIREMENTS

Bond

A111 Performance Bond. sum

A112 Design Guarantee Bond [for roof structure (to be sum


designed by the Contractor) of (………..)].

Insurances

A121 Insurance of the Works. sum

A122 Public Liability Insurance. sum

A123 SOCSO/Workmen Compensation Insurance. sum

Statutory Obligations

A131 CIDB Levy. sum

A140 Stamp duty. sum

A200 ENGINEER/SO/PD'S REQUIREMENTS

Facilities for the Engineer/SO/PD's representative.


Rate shall be deemed to include the provision of
water supply, electricity, and communication
facilities.

A211 Establishment and removal of [transportable type sum


cabin] office [with a floor area of 70 m2].

A212 Maintenance of office. mth

A213 Establishment and removal of [purpose built] sum


laboratories [with a floor area of 60 m2 as shown in
Drawing Nos. (……….) to (……..)].

A214 Maintenance of laboratories. mth

Equipment for Use by the Engineer/SO/PD's


Representative

A221 Establishment and removal of office equipment [with sum


type and quantity as per Specification clause (……).
Equipment to be reverted to the Contractor after
completion].

A222 Maintenance of office equipment. mth

Page Total carried to Summary of Part 1

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA6 of BQA61
PART 1
General Items
Item No. Code No. Description Unit Qty. Rate Amount (RM)

A223 Establishment and removal of laboratory equipment sum


[with type and quantity as per Specification clause
(……). Equipment to be reverted to the Contractor
after completion].

A224 Maintenance of laboratory equipment. mth

A225 Surveying equipment [with type and quantity as per sum


the Specification, Clause (……). Equipment to be
reverted to the Contractor after completion].

A226 Maintenance of survey equipment. mth

Services for the Engineer/SO/PD's Representative

A231.1 Provision of transport vehicle [Type A as per sum


Specification clause (…..). Vehicle to be reverted to
the Contractor after completion].

A231.2 Provision of transport vehicle [Type B as per sum


Specification clause (…..). Vehicle to be reverted to
the Contractor after completion].

A232.1 Maintenance of vehicle [Type A]. mth

A232.2 Maintenance of vehicle [Type B]. mth

A233 Provision of mobile phones [and to be reverted to the sum


Contractor after completion].

A234 Maintenance of mobile phones. mth

A235 Provision of camera [and to be reverted to the sum


Contractor after completion].

Attendance for Engineer/SO/PD's Representative

A241 [2 Nos.] Drivers for [Type A and Type B vehicle]. man-mth

A242 [2 Nos.] Survey assistants. man-mth

A243 [2 Nos.] Laboratory assistants. man-mth

A244 [4 Nos.] General labours. man-mth

A245 [2 Nos.] Security guards. man-mth

Page Total carried to Summary of Part 1

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA7 of BQA61
PART 1
General Items
Item No. Code No. Description Unit Qty. Rate Amount (RM)

Submission of Documents

A251 Project execution plan [as per Specification clause sum


(…..)].

A252 Drawings [as per Specification clause (…..)]. sum

A253 Method statement [as per Specification clause (…..)]. sum

A254 Work programme [in Microsoft Project on a Gantt sum


Chart format].

Miscellaneous

A261 Progress report [ in five sets]. Rate to include mth


progress photographs.

A262 Project signboard. nr

A263 As built drawings. sum

A264 Video recording [as per Specification clause (....)]. sum

A265 Temporary fencing and hoarding. sum

A300 PROJECT REQUIREMENTS

A310 Survey and setting out [by licensed surveyor]. sum

Quality Assurance/Quality Control (QA/QC)

A321 QA/QC Plan [as per Specification clause (…..)]. sum

A322 Testing of materials; [concrete test cubes; samples


and method of testing as per Specification clause sum
(…..)].

A323 Testing of work [for cold water plumbing system as


sum
per Specification clause (….)].

A324 Factory acceptance test [for hydrostatic testing of


butterfly valves] for three (3) person of the S.O. sum
representatives.

A325 Testing and commissioning [of plant for a duration of


sum
three (3) months].

Operation and Maintenance of Plant

A331 Operation and Maintenance Manual. sum

A332 Training of operating personnel [for a period of 10 sum


weeks].

Page Total carried to Summary of Part 1

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA8 of BQA61
PART 1
General Items
Item No. Code No. Description Unit Qty. Rate Amount (RM)

A333 Provision of manpower [for a period of 12 months]. sum

A334 Provision of chemicals and consumable [for a period sum


of 12 months].

A335 Utility cost [for a period of 12 months]. sum

Maintenance of Road

A341 Routine maintenance for existing road as per sum


Specification clause […..].

A342 Periodic maintenanceas for existing road per sum


Specification clause […..].

A343 Routine maintenance for temporary road diversion as sum


per Specification clause […..].

A344 Periodic maintenance for temporary road diversion as sum


per Specification clause […..].

A350 Clearance of site upon completion. sum

A400 AUTHORITIES' REQUIREMENTS

Occupational Safety and Health Requirements

A411 Health and safety plan. sum

A412 Occupational safety and health officer [for duration of man-mth


the contract period].

A413 Personnel protective equipment as per Specification sum


clause […..].

A414 Health and safety report [in five sets. Rate to include mth
tool box meeting].

A415 Training of health and safety as per Specification sum


clause […..].

A416 Safety signages. sum

A420 Permits and fees [to KTMB for pipe jacking work sum
across railway tracks at (…….)].

A430 Deposit [to JKR for pipelaying work along road verge sum
from (……..) to (……………)].

Page Total carried to Summary of Part 1

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA9 of BQA61
PART 1
General Items
Item No. Code No. Description Unit Qty. Rate Amount (RM)

A500 CONTRACTOR'S REQUIREMENTS

Facilities
Item shall be deemed to include the provision of
water supply, electricity, and sanitary facilities and
their continuing operation and/or maintenance.

A511.1 Set up offices and remove upon completion; fixed sum


charge.

A511.2 Maintain office for duration of contract period; time- sum


related charge.

A512.1 Provision of office equipment and remove upon sum


completion; fixed charge.

A512.2 Maintain office equipment for duration of contract sum


period; time-related charge.

A513.1 Set up laboratories and remove upon completion; sum


fixed charge.

A513.2 Maintain laboratories for duration of contract period; sum


time-related charge.

A514.1 Provision of laboratories equipment and remove upon sum


completion [with type and quantity as per
Specification clause (……)].

A514.2 Maintain laboratories equipment for duration of sum


contract period; time-related charge.

A515.1 Set up stores and remove upon completion; fixed sum


charge.

A515.2 Maintain store for duration of contract period; time- sum


related charge.

A516.1 Set up workshops and remove upon completion; fixed sum


charge.

A516.2 Maintain workshop for duration of contract period; sum


time-related charge.

A517.1 Set up workmen accomodation and remove upon sum


completion; fixed charge.

A517.2 Maintain workmen accomodation for duration of sum


contract period; time-related charge.

A518.1 Provision of transport. sum

A518.2 Maintain transport for duration of contract period; sum


time-related charge.

Page Total carried to Summary of Part 1

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA10 of BQA61
PART 1
General Items
Item No. Code No. Description Unit Qty. Rate Amount (RM)

Temporary Work

A521.1 Construct temporary access roads to site; fixed sum


charge.

A521.2 Maintain temporary access roads for duration of sum


contract period; time-related charge.

A522.1 Construct temporary bridges and remove upon sum


completion [over Sg. (……)]; fixed charge.

A522.2 Maintain temporary bridges for duration of contract sum


period; time-related charge.

A523.1 Construct cofferdams for [water intake] and remove sum


upon completion; fixed charge.

A523.2 Maintain cofferdam for duration of construction; time- sum


related charge.

A524.1 Install pumping and dewatering at [pumphouse] and sum


remove upon completion; fixed charge.

A524.2 Operation and maintenance of pumping and sum


dewatering for duration of construction; time-related
charge.

A525.1 Construct river diversion for [water intake] and sum


reinstate to its original alignment upon completion;
fixed charge.

A525.2 Maintain river diversion for duration of construction; sum


time-related charge.

A526.1 Construct temporary jetty [at Sg. (……)] and remove sum
upon completion; fixed charge.

A526.2 Maintain temporary jetty for duration of contract sum


period; time-related charge.

A527.1 Construct temporary staging over [Sg. (…….)] and sum


remove upon completion; fixed charge.

A527.2 Maintain temporary staging for duration of sum


construction; time-related charge.

Site Management

A531 Site agent for the duration of conract period; time- sum
related charge.

A532 QA/QC officer for the duration of contract period. man-mth

Page Total carried to Summary of Part 1

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA11 of BQA61
PART 1
General Items
Item No. Code No. Description Unit Qty. Rate Amount (RM)

A540 Mobilisation and demobilisation. [Rate to include sum


remobilisation for testing and commissioning of the
plant after the completion of the pipelaying work
under Package (2)].

A600 DESIGN AND BUILT ELEMENT

A610 Preliminary engineering studies. sum

A620 Design survey. sum

A630 Utilities survey. sum

A640 Site investigation. sum

A650 Design fees. sum

Independent Checkers

A661 Structural. sum

A662 Geotechnical. sum

A663 Road safety. sum

A670 Supervision fees. sum

A700 PROVISIONAL/PRIME COST SUMS

Provisional Sums

A711.1 Provisional Sum of [RM: Two hundred thousands sum


only for TNB contribution].

A711.2 Provisional Sum of [RM: Five hundred thousands sum


only for piling work].

A711.3 Provisional Sum of [RM: Three hundred thousands sum


only for staff quarters to be procured by the
Employer].

A711.4 Attendance [for Item A711.3]. sum

A711.5 Profit for [Item A711.3]. %

Prime Cost Items

A721 Prime Cost Sum of [RM: One million only for sum
reinforced soil wall].

A722 Attendance. sum

A723 Profit. %

Page Total carried to Summary of Part 1

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA12 of BQA61
PART 1
General Items
Item No. Code No. Description Unit Qty. Rate Amount (RM)

Summary of Part 1: General Items

Page BQP1/1

Page BQP1/2

Page BQP1/3

Page BQP1/4

Page BQP1/5

Page BQP1/6

Page BQP1/7

Total of Part 1 carried to Grand Summary

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA13 of BQA61
PART 2
Environmental Protection and Enhancement
Item No. Code No. Description Unit Qty. Rate Amount (RM)

B100 ENVIRONMENTAL MANAGEMENT PLAN


(EMP)

B110 Preparation of environmental management plan which sum


shall include erosion and sediment control plan
(ESCP), flora and fauna management plan by a
consultant, registered with the Department of
Environment.

B120 Appointment of environmental officer (EO) for the man-mth


duration of the contract period.

B200 EROSION AND SEDIMENT CONTROL PLAN


(ESCP)
Items for silt fence, silt curtain, sand bags, gabion
wall, and rock check dam shall be deemed to include
provisions as per Specification clause (............) and
removal of the items upon completion.

B210 Silt fence of [1.0 m height] as per Specification clause m


(…..) and as shown in the drawings.

B220 Silt curtain as per Specification clause (….) and as m2


shown in the drawings.

B230 Sand bag as per Specification clause (….) and as nr


shown in the drawings.

B240 Rock-filled gabion wall with PVC coated wire gauge m3


size of [2.7 mm] as per Specification clause (….) and
as shown in the drawings.

B250 Rock check dam as per Specification clause (….) and m3


as shown in the drawings.

Sediment Basin

B261 Excavation. m3

B262 Granular filling. Rate to include imported fill as m3


necessary.

B263 Concrete grade [C25]. Rate to include formwork and m3


reinforcement.

B264 Class X, 1.0 m diameter reinforced concrete pipe. m

B265 Geotextile as per Specification clause (….). m2

B266 Rock-filled gabion with PVC-coated wire gauge size m3


of [2.7 mm] as per Specification clause (….).

Page Total carried to Summary of Part 2

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA14 of BQA61
PART 2
Environmental Protection and Enhancement
Item No. Code No. Description Unit Qty. Rate Amount (RM)

B267 Rock-filled gabion mattress, 300 mm thick with PVC- m2


coated wire gauge size of [2.7 mm] as per
Specification clause (….).

B268 Riprap of 300 mm average thickness. m2

Silt Trap

B271 Excavation. m3

B272 Granular filling. Rate to include imported fill as m3


necessary.

B273 Concrete grade [C25]. Rate to include formwork and m3


reinforcement.

B274 Class X, 1.0 m diameter reinforced concrete pipe. m

B275 Geotextile as per Specification clause (….). m2

B276 Rock-filled gabion with PVC-coated wire gauge size m3


of [2.7 mm] as per Specification clause (….).

B277 Rock-filled gabion mattress, 300 mm thick with PVC- m2


coated wire gauge size of [2.7 mm] as per
Specification clause (….).

B278 Riprap of 300 mm average thickness. m2

Maintenance

Items for maintenance of silt fence, silt curtain, sand


bags, gabion wall, rock check dam, sediment basin,
and silt trap shall be deemed to include disposal of
accumulated debris, sediment and silt to approved
site, unless otherwise stated.

B281 Silt fence. sum

B282 Silt curtain. sum

B283 Sand bag. sum

B284 Gabion wall. sum

B285 Rock check dam. sum

B286 Sediment basin. sum

B287 Silt trap. sum

Page Total carried to Summary of Part 2

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA15 of BQA61
PART 2
Environmental Protection and Enhancement
Item No. Code No. Description Unit Qty. Rate Amount (RM)

B300 WATER QUANTITY CONTROL AND


MONITORING

B310 Skid tank bund [at workshop area in reinforced sum


concrete of size 6 m x 4 m x 1 m high] as per
Specification clause (……) and as shown in the
drawing. Rate to include traps, oil and grease
separators, and its maintenance and removal upon
completion.

B320 Water treatment facilities for [effluent from tunnel sum


work to comply with Standard (A/B) of the
Environmental Quality Act].

B330 Sewage treatment facilities for [workmen sum


accomodation].

Water Quality Sampling and In situ Testing

Water quality sampling and monitoring by accredited


laboratory on a monthly basis [at the discharge outlet
of silt trap/sedimentation basin to comply with the
requirements of Standard (A/B) of the Environmental
Quality Act for the following parameters].

B341 pH nr

B342 Total suspended solid (TSS). nr

B345 Dissolved Oxygen (DO) nr

B347 Ammoniacal nitrogen nr

Water Quality Sampling and Laboratory Testing

Water quality sampling and monitoring by accredited


laboratory on a monthly basis [at the effluent
discharge point at workmen accommodation,
workshop, and canteen to comply with the
requirements of Standard (A/B) of the Environmental
Quality Act for the following parameters].

B351 pH. nr

B352 Total suspended solid (TSS). nr

B353 Biochemical oxygen demand (BOD). nr

B354 Chemical oxygen demand (COD). nr

B355 Dissolved oxygen (DO). nr

B356 Escherichia coli (E.coli). nr

Page Total carried to Summary of Part 2

B357 Ammoniacal nitrogen. nr

B358 Oil and grease. nr

B400 AIR QUALITY CONTROL AND MONITORING

B410 Tyre washing facilities [in reinforced concrete of size set


6 m x 3.6 m as per Specification clause (…..) and as
shown in the drawing]. Rate to include construction
of tyre washing concrete platform, and provision and
maintenance of water supply system and portable
water jets.

B420 Wash trough of [size 6 m x 3.6 m in reinforced nr


concrete, hardcore, and aggregate layers as per
Specification clause (…..) and as shown in the
drawing].

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA16 of BQA61
PART 2
Environmental Protection and Enhancement
Item No. Code No. Description Unit Qty. Rate Amount (RM)
B430 Water bowser truck [for carrying out water spraying nr
along haul/access roads and existing roads, and near
settlements, for at least three times per day]. Rate to
include the provision and maintenance of the vehicle
and water supply, and the driver.

B440 Water sprinkler [for control of dust at quarry/batching sum


plant using pumping system]. Rate to include
provision and maintenance of water supply.

Air Quality Sampling

Air quality sampling by accredited laboratory on a


quarterly basis for the following parameters:

B451 Total suspended particulates (TSP) over a 24 hours nr


period.

B452 Wind velocity and direction. nr

B453 Particulate matter (PM10). nr

B500 NOISE AND VIBRATION CONTROL AND


MONITORING

B510 [Polycarbonate] noise barrier [of 1.5 m height] as per m


Specification clause (….). Rate to include supply,
fabrication, installation, bolts, nuts, posts, and other
ancillary work and maintenance.

B520 Vibration control. sum

Page Total carried to Summary of Part 2

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA17 of BQA61
PART 2
Environmental Protection and Enhancement
Item No. Code No. Description Unit Qty. Rate Amount (RM)

Noise Level Measurement

Noise level measurement and monitoring by


accredited laboratory [including L10, L90, and Leq on a
quarterly basis near Taman (…..)] for the following
parameters.

B531 Ambient noise level measurement. nr

B532 Spot noise level measurement. nr

B540 Vibration measurement and monitoring by accredited sum


laboratory on a quarterly basis near Taman (…..).

B600 WASTE MANAGEMENT

B610 Scheduled wastes as per Specification clause (……). sum


Rate to include storage, labelling, and transportation
from site by a licensed contractor for disposal as per
the Department of Environment (DOE) regulation.

B620 Household solid waste as per Specification clause sum


(……). Rate to include provision of collection bins,
temporary storage area, and disposal to approved site.

B630 Construction solid waste as per Specification clause sum


(……). Rate to include provision of collection bins,
temporary storage area, and disposal to approved site.

B640 Biomass disposal as per Specification clause (……). sum


Rate to include preparation and construction of
temporary area, and the disposal to approved site.

B700 CONSERVATION/PRESERVATION

Preservation of Flora

B711 Flora survey report [in five sets]. sum

B712 Relocation of flora of the (….) species to the nr


temporary site near the [site office] and finally to the
(……..) forest reserve. Rate to include the cost of
relocation to the temporary and the final site
specified. It shall also include excavation,
transportation, protection, watering, fertilizing
required, and nurturing until the flora are established
at the temporary and the final site of relocation.

B713 Relocation of flora of the (…) species to arboreta. nr

Page Total carried to Summary of Part 2

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA18 of BQA61
PART 2
Environmental Protection and Enhancement
Item No. Code No. Description Unit Qty. Rate Amount (RM)

Preservation of Fauna

B721 Fauna survey report [in five sets]. sum

B722 Relocation of fauna of the (……) species to the nr


temporary site near the [site office] and finally to the
(……..) forest reserve. Rate to include the cost of
temporary relocation to the rehabilitation centre and
final relocation to sites specified. It shall also include
trapping, transportation and protection, and treatment
required for the well being of the fauna at the
rehabilitation centre and before their release at the
final site of relocation/rehabilitation.

Preservation of Archeological/Heritage

B731 Report [in five sets]. sum

B732 Protection. sum

B800 ENVIRONMENT REPORT

B810.1 Environmental monitoring report [in five sets on a sum


monthly basis for the TSS content at the discharge
outlet of the silt trap/sedimentation basin].

B810.2 Environmental monitoring report [in five sets on a sum


quarterly basis for pH, TSS, BOD, COD, DO, e.coli,
ammoniacal nitrogen, and oil and grease, for the
discharge point from the project site at Sg.
(………….)].

B810.3 Environmental monitoring report [in five sets on a sum


quarterly basis for pH, TSS, BOD, COD, DO, e.coli,
ammoniacal nitrogen, and oil and grease, for the
effluent discharge point at workmen accomodation,
workshop and canteen].

B810.4 Environmental monitoring report [in five sets on a sum


quarterly basis for ambient air quality].

B810.5 Environmental monitoring report [in five sets on a sum


quarterly basis for noise and vibration measurement].

B820 Environmental audit report [on a annual basis in five sum


sets].

B830 Environmental closure audit report in [five sets]. sum

Page Total carried to Summary of Part 2

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA19 of BQA61
PART 2
Environmental Protection and Enhancement
Item No. Code No. Description Unit Qty. Rate Amount (RM)

Summary of Part 2: Environmental Protection and


Enhancement

Page BQP2/1

Page BQP2/2

Page BQP2/3

Page BQP2/4

Page BQP2/5

Page BQP2/6

Total of Part 2 carried to Grand Summary

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA20 of BQA61
PART 3
Traffic Management and Control
Item No. Code No. Description Unit Qty. Rate Amount (RM)

C100 TRAFFIC MANAGEMENT PLAN

Traffic management plan shall be deemed to include


emergency response plan and the associated work.

C110 Traffic Impact Study sum

C120 Preparation of traffic management plan. Rate to sum


include the cost of any survey required, literature,
references, consultations, and the production of the
document. It shall also include the cost for the
engagement of qualified traffic engineers required for
carrying out the respective study and the preparation
of the said plan.

C130 Traffic Management Team

C131 Traffic manager. man-mth

C132 Traffic management officer. man-mth

C133 Supervisor. man-mth

C134 Traffic controller. man-mth

C200 TEMPORARY ROAD FURNITURE

Items for temporary road furniture shall be deemed to


include the supply, installation, maintenance, and
removal upon completion.

The supply of temporary road furniture shall be


deemed to include base preparation, cost of materials,
fabrication, and fixing including posts, struts, bolts
and nuts, base, storage, and transportation.

Installation of temporary road furniture shall be


deemed to include cost for multiple shifting within the
contractual boundaries and its vicinities that is
affected by the traffic management plan.

Temporary road furniture shall be deemed to include


cost for the inspection, immediate repair and
replacement of any damaged, missing or stolen items
throughout the duration of the construction, and
removal upon completion.

Page Total carried to Summary of Part 3

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA21 of BQA61
PART 3
Traffic Management and Control
Item No. Code No. Description Unit Qty. Rate Amount (RM)

Temporary Traffic Signs

Temporary traffic signs shall be in accordance with


JKR Arahan Teknik (Jalan) 2C/85 .

C211.1 Portable non-illuminated retro-reflective in nr


[aluminium] sheeting for [advance warning sign].

C211.2 Portable non-illuminated retro-reflective in nr


[aluminium] sheeting for [detour sign].

C211.3 Portable non-illuminated retro-reflective in nr


[aluminium] sheeting for [obstruction marker].

C211.4 Portable non-illuminated retro-reflective in nr


[aluminium] sheeting for [apologetic sign].

C212 Portable changeable message signs (PCMS) of [2.5 nr


m] x [1.5 m] as per Specification clause (…).

C213.1 Traffic signals with [3] optical system mounted on set


[poles] as per Specification clause (….). Rate to
include signal post, signal lanterns, traffic controllers,
cabling, and removal upon completion.

C213.2 Traffic signals with [3] optical system mounted on set


[gantry]as per Specification clause (….). Rate to
include signal lanterns, traffic controllers, cabling,
and removal upon completion.

Barriers and Barricades

C221 Heavy duty water- or sand-filled PVC barrier of the nr


[New Jersey] type.

C222 [Precast movable reinforced] concrete barrier of the nr


[New Jersey] type.

C223 Wooden barricade. nr

C224 Vehicle mounted impact attenuator. nr

C225 Sand bags. m3

C226 Temporary guardrail. m

Delineators

C231 [750mm] PVC Traffic cones with reflective bands. nr

C232 [Double sided reflective] string delineators. m

C233 [750 x 600mm] battery operated flashing arrows on nr


powder coated mild steel plate.

Page Total carried to Summary of Part 3

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA22 of BQA61
PART 3
Traffic Management and Control
Item No. Code No. Description Unit Qty. Rate Amount (RM)

C234 [115mm] diameter battery operated revolving beacon nr


lights.

C235 [150mm] diameter polycarbonate lens battery nr


operated blinkers.

Temporary Road Markings

C241 Letters and shapes. nr

C241.1 Single straight arrow. nr

C241.2 Single turning arrow. nr

C241.3 Double headed arrow. nr

C242 [150mm] wide continuous line. m

C243 [100mm] wide intermittent line with [1000mm] line m


and [1700mm] gap.

C244 Chevron marking. m2

C245 Transverse bars. m2

C250.1 Mechanical robot flagman [of the full-man type]. nr

C250.2 Mechanical robot flagman [of the full-man type]. nr

C260 Temporary street lightings. nr

C300 TRAFFIC MANAGEMENT REPORT

C310 Traffic management safety report [on a monthly basis sum


in five sets].

C320 Road safety audit report [on a quarterly basis in five sum
sets]. Rate to include the cost of any survey required,
literatures, references, consultations, and the
production of the document. It shall also include the
cost for the engagement of the road safety auditor
required for carrying out the audit and the preparation
of the said audit report.

Page Total carried to Summary of Part 3

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA23 of BQA61
PART 3
Traffic Management and Control
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Summary of Part 3: Traffic Management and
Control

Page BQP3/1

Page BQP3/2

Page BQP3/3

Total of Part 3 carried to Grand Summary

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA24 of BQA61
PART 4
Site Investigation Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)

D100 MOBILISATION AND DEMOBILISATION


Rate shall be deemed to include provision of all plant
and equipment, transportation to the Site, including
transfer between different locations within the Site,
handling, assembling and removal off the Site after
completion of operation.

D110 Deep Boring sum

D120 Cone Penetration Tests sum

D130 Field Tests sum

D200 DEEP BORING

Rate to include ground water observation as per


Specification clause (…..…….).

Plant Movement

Shifting of plant and equipment from one borehole


position to the next borehole position, rate to include
dismantling from one position and erecting at another
position where the borehole is to be carried out on:

D211 Flat land. nr

D212 Hillslopes. nr

D213 Floating platform. nr

D214 Fixed platform. nr

D215 Swampy ground. nr

Boring in Soil

Carrying out vertical boring in soil using [rotary wash


boring equipment (NW size)] for depth measured
from Commencing Surface. Rate to include provision
of casing where necessary.

Water [as drilling fluid]

D221.1 Not exceeding 10 m. m

D221.2 10 – 20 m. m

D221.3 20 – 30 m. m

D221.4 30 – 40 m. m

Page Total carried to Summary of Part 4

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA25 of BQA61
PART 4
Site Investigation Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)

D221.5 40 – 50 m. m

D221.6 Exceeding 50 m. m

Water with bentonite or polymer [as drilling fluid]

D222.1 Not exceeding 10 m. m

D222.2 10 – 20 m. m

D222.3 20 – 30 m. m

D222.4 30 – 40 m. m

D222.5 40 – 50 m. m

D222.6 Exceeding 50 m. m

Air/foam [as drilling medium]

D223.1 Not exceeding 10 m. m

D223.2 10 – 20 m. m

D223.3 20 – 30 m. m

D223.4 30 – 40 m. m

D223.5 40 – 50 m. m

D223.6 Exceeding 50 m. m

Drilling in Rock
Carry out vertical diamond core drilling of [52 mm]
diameter into rock including storing of core samples
in standard boxes. [Core boxes shall become property
of the Employer].

Water [as drilling fluid]


D231.1 Not exceeding 10 m. m

D231.2 10 – 20 m. m

D231.3 20 – 30 m. m

D231.4 30 – 40 m. m

D231.5 40 – 50 m. m

D231.6 Exceeding 50 m. m

Air/foam [as drilling medium]

D232.1 Not exceeding 10 m. m

Page Total carried to Summary of Part 4

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA26 of BQA61
PART 4
Site Investigation Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)

D232.2 10 – 20 m. m

D232.3 20 – 30 m. m

D232.4 30 – 40 m. m

D232.5 40 – 50 m. m

D232.6 Exceeding 50 m. m

Reaming casing

D233.1 Not exceeding 10 m. m

D233.2 10 – 20 m. m

D233.3 20 – 30 m. m

D233.4 30 – 40 m. m

D233.5 40 – 50 m. m

D233.6 Exceeding 50 m. m

Grouting

D234.1 Not exceeding 10 m. m

D234.2 10 – 20 m. m

D234.3 20 – 30 m. m

D234.4 30 – 40 m. m

D234.5 40 – 50 m. m

D234.6 Exceeding 50 m. m

Test

Standard penetration test

D241.1 Not exceeding 10 m. nr

D241.2 10 – 20 m. nr

D241.3 20 – 30 m. nr

D241.4 30 – 40 m. nr

D241.5 40 – 50 m. nr

D241.6 Exceeding 50 m. nr

Page Total carried to Summary of Part 4

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA27 of BQA61
PART 4
Site Investigation Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)

Vane shear test

D242.1 Not exceeding 10 m. nr

D242.2 10 – 20 m. nr

D242.3 20 – 30 m. nr

D242.4 30 – 40 m. nr

D242.5 40 – 50 m. nr

D242.6 Exceeding 50 m. nr

Pressure meter test

D243.1 Not exceeding 10 m. nr

D243.2 10 – 20 m. nr

D243.3 20 – 30 m. nr

D243.4 30 – 40 m. nr

D243.5 40 – 50 m. nr

D243.6 Exceeding 50 m. nr

Field permeability test

D244.1 Not exceeding 10 m. nr

D244.2 10 – 20 m. nr

D244.3 20 – 30 m. nr

D244.4 30 – 40 m. nr

D244.5 40 – 50 m. nr

D244.6 Exceeding 50 m. nr

Dynamic cone test

D245.1 Not exceeding 10 m. nr

D245.2 10 – 20 m. nr

D245.3 20 – 30 m. nr

D245.4 30 – 40 m. nr

D245.5 40 – 50 m. nr

D245.6 Exceeding 50 m. nr

Page Total carried to Summary of Part 4

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA28 of BQA61
PART 4
Site Investigation Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)

Sampling

Carry out the following sampling in borehole. Rate to


include transportation and protection as per
Specification clause (…………………).

[5 kg] Disturbed samples

D251.1 Not exceeding 10 m. nr

D251.2 10 – 20 m. nr

D251.3 20 – 30 m. nr

D251.4 30 – 40 m. nr

D251.5 40 – 50 m. nr

D251.6 Exceeding 50 m. nr

Undisturbed sample using thin wall tube sampler

D252.1 Not exceeding 10 m. nr

D252.1 10 – 20 m. nr

D252.3 20 – 30 m. nr

D252.4 30 – 40 m. nr

D252.5 40 – 50 m. nr

D252.6 Exceeding 50 m. nr

Undisturbed sample using Mazier sampler

D253.1 Not exceeding 10 m. nr

D253.2 10 – 20 m. nr

D253.3 20 – 30 m. nr

D253.4 30 – 40 m. nr

D253.5 40 – 50 m. nr

D253.6 Exceeding 50 m. nr

Undisturbed sample using piston sampler

D254.1 Not exceeding 10 m. nr

D254.2 10 – 20 m. nr

D254.3 20 – 30 m. nr

Page Total carried to Summary of Part 4

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA29 of BQA61
PART 4
Site Investigation Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)

D254.4 30 – 40 m. nr

D254.5 40 – 50 m. nr

D254.6 Exceeding 50 m. nr

Undisturbed sample using Denison sampler

D255.1 Not exceeding 10 m. nr

D255.2 10 – 20 m. nr

D255.3 20 – 30 m. nr

D255.4 30 – 40 m. nr

D255.5 40 – 50 m. nr

D255.6 Exceeding 50 m. nr

Water sample [minimum 1 litre]

D256.1 Not exceeding 10 m. nr

D256.2 10 – 20 m. nr

D256.3 20 – 30 m. nr

D256.4 30 – 40 m. nr

D256.5 40 – 50 m. nr

D256.6 Exceeding 50 m. nr

Miscellaneous

D261 Borehole marker. nr

D300 CONE PENETRATION TESTS

Plant movement

Shifting of plant and equipment from one test position


to the next test position, rate to include dismantling
from one position and erecting at another position
where the test is to be carried out on:

D311 Flat land. nr

D312 Hillslopes. nr

D313 Floating platform. nr

D314 Fixed platform. nr

D315 Swampy ground. nr

Page Total carried to Summary of Part 4

Test

Dutch cone penetration test [using cone type (…)


and (….) kg ram as per Specification clause (….)]

D321.1 Not exceeding 10 m. m

D321.2 10 – 20 m. m

D321.3 20 – 30 m. m

D321.4 30 – 40 m. m

D321.5 40 – 50 m. m

D321.6 Exceeding 50 m. m

Piezocone

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA30 of BQA61
PART 4
Site Investigation Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)
D322.1 Not exceeding 10 m. m

D322.2 10 – 20 m. m

D322.3 20 – 30 m. m

D322.4 30 – 40 m. m

D322.5 40 – 50 m. m

D322.6 Exceeding 50 m. m

Dissipation test [maximum 2 hours per test]

D323.1 Not exceeding 10 m. nr

D323.2 10 – 20 m. nr

D323.3 20 – 30 m. nr

D323.4 30 – 40 m. nr

D323.5 40 – 50 m. nr

D323.6 Exceeding 50 m. nr

Miscellaneous

D331 Test location marker. nr

Page Total carried to Summary of Part 4

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA31 of BQA61
PART 4
Site Investigation Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)

D400 FIELD TESTS

Rate for field tests shall be deemed to include plant


movements on site and logging of daily field records.

Hand Auger

Rate for augering in soil shall be deemed to include


ground water observation as per Specification clause
(………………).

D411 Augering in soil. m

D412 Disturbed sample [min. 1 kg]. nr

D413 Undisturbed samples using thin wall tube sampler. nr

D414 Water sample [min. 3 litres]. nr

Trial Pit

Pit size [2 m wide x 2 m long x 2 m deep]. Rate shall


be deemed to include lateral support, logging and
mapping of side wall and backfilling, and ground
water observation as per Specification clause
(…………………).

Rate for sampling shall be deemed to include


transportation and protection as per Specification
clause (…………………..).

D421 Excavation. nr

D422 Small disturbed sample [1 kg]. nr

D423 Bulk sample [min. 50 kg]. nr

D424 Block sample [300 mm x 300 mm]. nr

D425 Water sample [min. 3 litres]. nr

Testing

D431 Mackintosh or JKR probes. m

D432 Vane shear. nr

D433 Plate bearing [300 mm square plate, test pressure 250 nr


kPa with range from uploading and downloading
cycle].

D434 In situ CBR at locations as shown in drawings. nr

D435 Pocket penetrometer. nr

Page Total carried to Summary of Part 4

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA32 of BQA61
PART 4
Site Investigation Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)

D436 Field density as per Specification clause (………..). nr

Sampling

Carry out the following sampling at location as


indicated in the drawing. Rate for sampling shall be
deemed to include transportation and protection as
per Specification clause (…………………..).

D441 Small disturbed sample [1 kg]. nr

D442 Bulk sample [min. 50 kg]. nr

D443 Undisturbed samples using thin wall tube sampler. nr

D444 Block sample [300 mm x 300 mm]. nr

D445 Water sample [3 litres]. nr

D500 LABORATORY TESTS

All laboratory tests shall be to [BS 1377:1990], unless


stated otherwise. Rate to include preparation of
specimens.

Classification Test

D511 Mositure content. nr

D512 Atterberg limits. set

D513 Specific gravity. nr

D514 Particle size distribution for fine-grained soils. nr

D515 Particle size distribution for coarse-grained soils. nr

Soil Strength Tests

Each set shall consist of 3 nos. of [50 mm diameter x


100 mm length undisturbed] specimen.

D521 Unconfined compressive strength. nr

D522 Unconsolidated undrained triaxial compression. set

D523 Consolidated undrained triaxial compression test with set


pore water pressure measurement.

D524 Consolidated drained triaxial compression test with set


pore water pressure measurement.

D525.1 [60 mm square] direct shear box test. set

Page Total carried to Summary of Part 4

D525.2 [100 mm square] direct shear box test. set

D525.3 [300 mm square] direct shear box test. set

D526.1 [60 mm square] multi-reversal shear box test. set

D526.2 [100 mm square] multi-reversal shear box test. set

Soil Compaction Related Tests

Each set shall consist of 5 nos. of specimen.

D531 Standard compaction (2.5 kg hammer). set

D532 Heavy compaction (4.5 kg hammer). set

D533 Vibrating hammer. set

D534 Unsoaked CBR [on both ends]. nr

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA33 of BQA61
PART 4
Site Investigation Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)
D535 Soaked CBR [on both ends]. nr

Chemical and Electro-chemical Tests

D541 Organic matter content. nr

D542 Loss on ignition. nr

D543 Total sulphate content. nr

D544 Sulphate content. nr

D545 Chloride content. nr

D546 pH value. nr

D547 Resistivity test. nr

D548 Contaminants […..….] as per [ BS standard]. nr

Rock Strength Tests

D551 Unconfined compressive strength. nr

D552 Unconfined compressive strength with Young's nr


modulus and Poisson's ratio measurement.

D553 Point load test. nr

D554 Petrographic examination as per Specification clause nr


(…………….).

Compressibility and Permeability Tests

D561 One-dimensional consolidation. nr

Page Total carried to Summary of Part 4

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA34 of BQA61
PART 4
Site Investigation Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)

D562 Variable head permeability. nr

D563 Fixed head permeability. nr

D600 INSTRUMENTATION

D610 Piezometer as per Specification clause (…..) and as nr


shown in the drawings. Rate to include pre-boring
and installation.

D620 Inclinometer as per Specification clause (…..) and as nr


shown in the drawings. Rate to include pre-boring
and installation.

D631 Settlement surface marker. nr

D632 Settlement plate as per Specification clause (…..) and nr


as shown in the drawings.

D633 Settlement displacement marker. nr

D640 Magnetic extensometer as per Specification clause nr


(……….).

D650 Deep levelling datum. nr

D660 Monitoring of instrument for the above instrument at nr


the project site by [Geologist] as per Specification
clause (…..……). Rate to include preparation of
monitoring report to be submitted on a [monthly ]
basis.

D700 GEOPHYSICAL SURVEY AND MAPPING

Seismic Refraction Survey

D711 Setting out sets of seismic lines, rentising and sum


produce geophone, reduce levels, and topographical
profile of each seismic line using EDM.

D712 Carry out seismic refraction survey with a 24-channel set


seismograph with geophones at intervals of not more
than 5 m measured along the slope, and 7 shots per
set, using sledge hammer as the seismic energy
source. Rate to include data analysis to produce
geological profile incorporating borehole data where
available.

D713 Prepare maps of soil isopach and bedrock contour of sum


the Site as per Specification clause (……), based on
rock levels obtained from seismic refraction survey.

Page Total carried to Summary of Part 4

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA35 of BQA61
PART 4
Site Investigation Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)

Resistivity Profiling

D721 Setting out sets of resistivity profiling, rentising and sum


produce electrodes reduce levels and topographical
profile of each resistivity profile line including
topographical coordinates of each electrode.

D722 Carry out [2D] resistivity profiling using set


[Schlumberger-Wenner configuration and roll-along
technique with 40 electrodes at 5-meter intervals],
each interval measured as the slope distance between
adjacent electrodes.

D723 Process data for preparation of resistivity profiles. sum

D730 Geological terrain mapping as per Specification m2


clause (….) and in accordance to guidelines by the
Minerals and Geoscience Department, Malaysia,
covering area as shown in the drawings.

Utilities Detection and Mapping

D741 Locate, detect, and map all utilities and services as m2


per Specification clause (...………), for area as shown
in drawings.

D742 Verification with utilities provider. Rate to include sum


purchase of necessary documents and verification on
the utilities detected as compared with the records of
the utilities provider.

D743 Conduct site verification. sum

D800 REPORT

Preliminary Report

D811 Soil investigation report including laboratory test sum


results as per Specification clause (…………) to be
submitted in [two sets] with comb binding.

D812 Seismic refraction survey report as per Specification sum


clause (…………) to be submitted in [two sets] with
comb binding. Rate to include geological sections and
interpretation of data by specialists.

Page Total carried to Summary of Part 4

D813 Resistivity profiling report as per Specification clause sum


(…………) to be submitted in [two sets] with comb
binding. Rate to include geological sections and
interpretation of data by specialists.

D814 Geological terrain mapping report as per sum


Specification clause (…………) to be submitted in
[two sets] with comb binding.

D815 Utilities detection and mapping report as per sum


Specification clause (………… ) to be submitted in
[two sets] with comb binding.

Final Report

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA36 of BQA61
PART 4
Site Investigation Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)
D821 Soil investigation report including laboratory test sum
results as per Specification clause (…………) to be
submitted in [five sets] in hard cover.

D822 Seismic refraction survey report as per Specification sum


clause (…………) to be submitted in [five sets] in
hard cover.

D823 Resistivity profiling report as per Specification clause sum


(…………) to be submitted in [five sets] in hard
cover.

D824 Geological terrain mapping report as per sum


Specification clause (…………) to be submitted in
[five sets] in hard cover.

D825 Utilities detection and mapping report as per sum


Specification clause (…………) to be submitted in
[five sets] in hard cover.

Page Total carried to Summary of Part 4

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA37 of BQA61
PART 4
Site Investigation Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)

Summary of Part 4: Site Investigation Work

Page BQP4/1

Page BQP4/2

Page BQP4/3

Page BQP4/4

Page BQP4/5

Page BQP4/6

Page BQP4/7

Page BQP4/8

Page BQP4/9

Page BQP4/10

Page BQP4/11

Page BQP4/12

Page BQP4/13

Total of Part 4 carried to Grand Summary

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA38 of BQA61
PART 5
Demolition and Site Clearance
Item No. Code No. Description Unit Qty. Rate Amount (RM)

Items for demolition and site clearance shall be


deemed to include disposal of the materials arising.

E100 GENERAL CLEARANCE

Above Ground

E110.1 General clearance to [primary forest]. Rate to include ha


the removal of trees and stumps, undergrowth, shrubs,
roots, and the likes. [All trees of 0.5 m girth and
above shall become the property of the Employer].

E110.2 General clearance to [palm oil estate]. ha

E120 At water bodies. Rate to include removal and disposal ha


of items as per Specification clause (…..) in or at
[Lake Project] including objects either floating,
submerged, or at the bed of the the [lake].

E200 TREES
Felling of trees shall be deemed to include uprooting
and removal of stumps. [All trees of 0.5 m girth and
above shall become the property of the Employer].

E210 Trees of girth: 0.5 ‒ 1 m. nr

E220 Trees of girth: 1 ‒ 2 m. nr

E230 Trees of girth: 2 ‒ 5 m. nr

E240 Trees of girth exceeding 5 m. nr


[Holes after the removal of stumps shall be filled with
granular material].

E300 BUILDING

Concrete

E311 Individual building ‒ [2-storey bungalow with sum


reinforced concrete walls of total gross built-up area
of 2000 m2].

E312 Group of buildings ‒ [10 units of single storey chalet sum


with a gross built-up area of 100 m2 each].

Page Total carried to Summary of Part 5

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA39 of BQA61
PART 5
Demolition and Site Clearance
Item No. Code No. Description Unit Qty. Rate Amount (RM)

Brickwork and Masonry

E321 Individual building ‒ [single storey bungalow of total sum


gross built‒up area of 200 m2].

E322 Group of buildings ‒ [10 units of single storey chalet sum


with a gross built‒up area of 100 m2 each].

Timber

E331 Individual building ‒ [3 m x 3 m guard house]. sum

E332 Group of buildings ‒ [10 units of single storey chalet sum


with a gross built‒up area of 100 m2 each].

Metal

E341 Individual buildings ‒ [50 m x 10 m steel portal frame sum


factory].

E342 Group of buildings ‒ [2 units of 10 m x 6 m steel sum


stores].

No predominant material

E351 Individual buildings ‒ [single storey reinfoced sum


concrete frame with brick infill and steel roof
structure house of total gross built‒up area of 300
m2].

E352 Group of buildings ‒ [single storey reinfoced concrete sum


frame with brick infill and steel roof structure chalet
of gross built‒up area of 100 m2 each].

E400 STRUCTURES

Concrete

E411 Above ground ‒ [10 m long x 6 m wide x 6 m deep sum


mixing chamber].

E412 Below ground ‒ [Precast concrete box culverts sum


including headwall, wingwall, and foundation 20 m
long x 3 m wide x 2 m deep].

Brickwork and Masonry

E421 Above ground ‒ [2 m x 2 m x 3 m high manhole]. sum

E422 Below ground ‒ [2 m x 2 m x 3 m deep manhole]. sum

Timber

E431 Above ground ‒ 3 m x 3 m timber shed. sum

Page Total carried to Summary of Part 5

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA40 of BQA61
PART 5
Demolition and Site Clearance
Item No. Code No. Description Unit Qty. Rate Amount (RM)

Metal

E441 Above ground ‒ [2 m x 2 m x 20 m high truss support sum


to cooling tower].

No Predominant Material

E451 Above ground ‒ [10 m long x 6 m wide x 3 m high sum


water tank with timber roof].

E452 Below ground ‒ [10 m x 6 m wide x 5 m deep tank sum


with steel bracing].

E500 PIPELINES
Demolition of pipelines shall be deemed to include
demolition and removal of supports.

E510 [Dismantle 400 mm DN elevated mild steel pipeline]. m


The pipeline shall become the property of the
Employer and shall be delivered to the store at
(…….).

Page Total carried to Summary of Part 5

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA41 of BQA61
PART 5
Demolition and Site Clearance
Item No. Code No. Description Unit Qty. Rate Amount (RM)

Summary of Part 5: Demolition and Site Clearance

Page BQP5/1

Page BQP5/2

Page BQP5/3

Total of Part 5 carried to Grand Summary

Class A: General Items


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQA42 of BQA61
PART 6
Earthworks
Item No. Code No. Description Unit Qty. Rate Amount (RM)

F100 EXCAVATION

Stripping

F111.1 Topsoil of average depth of 150 mm and disposed to m2


the Contractor's dumpsite as approved by the
Engineer/S.O./P.D.

F111.2 Topsoil of average depth of 150 mm and stockpile for m2


re-use as top soil for turfing.

Cut to Fill

Excavation in cut shall be deemed to include trimming


and preparation of excavated surface and
transportation from source to place of fill or disposal.

F121.1 Excavate in earth material from original ground level m3


[to form embankment].

F121.2 Excavate in earth material commencing from [104 m] m3


[to form embankment].

F121.3 Excavate manually in earth material commencing from m3


[104 m] to [103.5 m].

F122 Excavate in natural hard material to form m3


embankment.

F123.1 Excavate in rock material by open blasting [to form m3


embankment].

F123.2 Excavate in rock material by controlled blasting [to m3


form embankment].

F123.3 Excavate in rock material by hydraulic rock breaker [to m3


form embankment].

F123.4 Excavate in rock material by pneumatic tools [to form m3


embankment].

Cut and Dispose

Excavation in cut shall be deemed to include trimming


and preparation of excavated surface and
transportation from source to place of fill or disposal.

F131.1 Excavate in earth material commencing from [104 m] m3


to [100 m] to disposal site approved by the
Engineer/S.O./P.D.

Page Total carried to Summary of Part 6

Class F: Earthworks
C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQF43 of BQF61
PART 6
Earthworks
Item No. Code No. Description Unit Qty. Rate Amount (RM)

F131.2 Excavate in earth material commencing from [104 m] m3


to [100 m] to disposal site approved by the
Engineer/S.O./P.D. [Rate to include compaction at
disposal site].

F132 Excavate in natural hard material by ripper unit m3


commencing from [104 m] to [100 m] to disposal site
approved by the Engineer/S.O./P.D.

F133.1 Excavate in rock by controlled blasting commencing m3


from [104 m] to [100 m] to disposal site approved by
the Engineer/S.O./P.D.

F133.2 Excavate in rock by open blasting commencing from m3


[104 m] to [100 m] to disposal site approved by the
Engineer/S.O./P.D.

F134 Excavate in artificial hard material by hydraulic rock m3


breaker to disposal site approved by the
Engineer/S.O./P.D.

F135 Excavate in unsuitable material commencing from m3


[104 m] to [103 m] to disposal site approved by the
Engineer/S.O./P.D.

Foundation

Excavation for foundation shall include upholding


sides of excavation, preparation of excavated surface,
additional excavation to provide working space and
removal of dead services.

F141 Excavate in earth material commencing from level m3


[104 m] to [102 m] to [clear water tank].

F142 Excavate in natural hard material using ripper unit m3


commencing from level [104 m] to [102 m] to [raft
foundation for chemical building].

F143 Excavate in rock using [hydraulic rock breaker] m3


commencing from level [104 m] to [101 m] to [raft
foundation for treated water pumping station].

F144 Excavate in artificial hard material at [TNB sub- m3


station].

F145 Excavate in unsuitable material commencing from m3


level [102 m] to [101 m] at [clear water tank].

F150 Excavate under water at Sg. (…) from river bed level m3
of [54 m] to [52 m]. Rate shall include all necessary
temporary work.

Page Total carried to Summary of Part 6

Class F: Earthworks
C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQF44 of BQF61
PART 6
Earthworks
Item No. Code No. Description Unit Qty. Rate Amount (RM)
F161 Provision of plant and equipment for dredging work at sum
Sg. (….). Rate to include mobilisation and
demobilisation.

F162 Excavation by dredging at Sg. (…..) to limits as shown m3


in Drawing No. (……). Rate shall include
transportation from source to place of disposal and
mopping up of silt which accumulates after the Final
Surface has been reached.

F200 EXCAVATION ANCILLARIES

Double Handling of Excavated Material

F211 In earth material to temporary stockpile approved by m3


the Engineer/S.O./P.D.

F212 In natural hard material to temporary stockpile m3


approved by the Engineer/S.O./P.D.

F213 In rock to temporary stockpile approved by the m3


Engineer/S.O./P.D.

F214 In artificial hard material to temporary stockpile before m3


final disposal.

F230 Timber support left-in. m2

F240 Metal support left-in. m2

F300 FILLING

The following items for filling shall include


compaction, and additional filling necessitated by
settlement or penetration into underlying material as
applicable.

General

F311 Using suitable excavated material to grading limits as m3


per Specification clause (……).

F312.1 Imported material from Contactor's own source with m3


grading limits as per Specification clause (…..).

F312.2 Imported material from borrow pit as shown in the m3


drawing with grading limits as per Specification clause
(…..).

F313 Grade C20 mass concrete. m3

Page Total carried to Summary of Part 6

Class F: Earthworks
C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQF45 of BQF61
PART 6
Earthworks
Item No. Code No. Description Unit Qty. Rate Amount (RM)

F314 Other stated material – granular material as per m3


Specification clause (…..).

Embankments

F321 Using suitable excavated material to grading limits as m3


per Specification clause (……) to form embankment.
Rate to include formation of benches.

F322 Imported material from Contactor's own source with m3


grading limits as per Specification clause (…..) to form
embankment. Rate to include formation of benches.

F323 Grade C20 mass concrete. m3

F324 Other stated material – granular material as per m3


Specification clause (…..) to form drainage layer to
embankment.

Replacement

F331 Replace unsuitable material using excavated material. m3

F332 Replace unsuitable material using imported material m3


from Contactor's own source.

F333 Replace excavated unsuitable material with Grade C20 m3


mass concrete.

F334 Other stated material – granular material as per m3


Specification clause (…..) to replace unsuitable
material.

F340.1 To structures – filling around column stumps. m3

F340.2 To structures – filling sides of wall above raft m3


foundation.

F350 Filling to embankment at Sg. (….) below water level. m3

F400 FILLING ANCILLARIES

F410 [Continuous polypropylene filament, nonwoven] m2


geotextile with tensile strength of 19 kN/m, effective
opening size of 0.09mm and nominal mass of 250
g/m2 as per Specification clause (….).

Page Total carried to Summary of Part 6

Class F: Earthworks
C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQF46 of BQF61
PART 6
Earthworks
Item No. Code No. Description Unit Qty. Rate Amount (RM)

F500 LANDSCAPING

Items for landscaping shall be deemed to include


digging, planting media, bedding, stalking, protection,
watering, weeding, required fertilising, and
replacement of dead item until the vegetation is
established.

F510.1 Spot turfing to flat areas. m2

F510.2 Close turfing to slopes. Rate to include pegging down m2


with stakes.

F520.1 Hydroseeding as per Specification clause (….). m2

F520.2 Hydroseeding with fibromat or equivalent. m2

F530 Bio-degradable erosion control blanket to slope of m2


embankment with fastening hook at […mm] spacing.
Rate to include fastening hook and netting.

F540 Vertiver grass or equivalent at 250 mm spacing (in m


group of 3 rows).

F550 Trees of the (….) species with minimum girth of [200 nr


mm] and [3 m] tall.

Page Total carried to Summary of Part 6

Class F: Earthworks
C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQF47 of BQF61
PART 6
Earthworks
Item No. Code No. Description Unit Qty. Rate Amount (RM)

Summary of Part 6: Earthworks

Page BQP6/1

Page BQP6/2

Page BQP6/3

Page BQP6/4

Page BQP6/5

Total of Part 6 carried to Grand Summary

Class F: Earthworks
C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQF48 of BQF61
PART 7
Miscellaneous Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)

T100 FENCES

Items for fences shall be deemed to include excavation,


preparation of surfaces, disposal of excavated material,
upholding sides of excavation, backfilling, concrete,
formwork, reinforcement, and all posts and foundation.

T110 [1200 mm wide x 25 mm thick close boarded wrot m


finish Grade A balau heavy hardwood complete with
150 mm x 150 mm posts at 3 m centres, 1.80 m high] as
shown in Drawing No. (……).

T120 [40 x 40 x 2.6 mm thick square mild steel hollow m


section at 100 mm centres bothways welded as a frame
1.5 m high with 80 x 80 x 3.6 mm thick post at 2 m
centres] as shown in Drawing No. (….).

T130 [3 mm] diameter [PVC-coated galvanised] mild steel m


wire of [50 mm] square mesh, [2 m] overall height
chain link fencing complete with post at [3 m] centres
as shown in Drawing No. (….). Rate to include all
posts, raked angle, straining wires, barb wires, concrete
kerbs, and foundations as shown.

Barb/Bladed Wire

T140 [12 SWG galvanised mild steel] barbed/bladed wire m


fencing; [1.2 m] high with [50 x 50 x 4.5 mm thick]
mild steel angle as post planted in mass concrete bases
at [2.0 m] centres and including [150 mm high]
concrete kerb as shown in Drawing No. (…..).

T150 [Brick and mild steel grille fencing; comprising 500 m


mm high, 115 mm thick brick wall with concrete coping
rendered with 19 mm thick cement sand plaster; 230
mm x 230 mm brickwork post; mild steel decorative
grille fencing 750 mm high; framed and welded
together, all on and including reinforced concrete strip
footing as shown in Drawing No. (.....)].

T200 GATES

Items for gates shall be deemed to include excavation,


preparation of surfaces, disposal of excavated material,
upholding sides of excavation, backfilling, concrete,
formwork, reinforcement, posts and foundations,
hinges, bolts, rollers, lockplates, and all necessary
welding.

T210 Double leave Grade A balau heavy hardwood gate nr


[2400 mm x 1500 mm high] overall complete with [100
mm x 100 mm] hardwood posts and ironmongery as
shown in Drawing No. (……).

Page Total carried to Summary of Class T

Class T: Miscellaneous Work


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQT49 of BQT61
PART 7
Miscellaneous Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)

T220.1 Double leave mild steel gate [3000 mm x 1500 mm nr


high], consisting of [50 x 30 x 3.2 mm thick]
rectangular hollow section as frame welded together
with [30 x 30 x 2.6 mm thick] square hollow section;
including painting, ironmongery; fixing with hinges on
lugs built in masonry backing as shown in Drawing No.
(........).

T220.2 Single leaf mild steel automatic gate [3000 mm x 1500 nr


mm high], consisting of [50 x 30 x 3.2 mm thick]
rectangular hollow section as frame welded together
with [30 x 30 x 2.6 mm thick] square hollow section;
including painting, ironmongery; fixing with hinges on
lugs built in masonry backing as shown in Drawing No.
(........). Rate to include motor and automatic control
system

Chain Link

Item for chain link shall be deemed to include all posts,


raked angle, straining wires, barb wires, kerbs where
applicable, and their foundation.

T230 [3 mm] diameter [PVC-costed galvanised mild steel nr


wire of 50 mm square mesh, [3.0 m wide x 2.5 m
overall height double leave chain link gate with 60.3
mm OD x 5 mm thick circular hollow section as frame
as shown in Drawing No. (.....). Rate to include all
posts, hinges, bolts, lock plates, angle braces, barb
wires, all necessary welding and foundations as shown.

T240 Double leave galvanised barbed wire [2400 mm x 2000 nr


mm high] gates; comprising [50 x 50 x 4.5 mm thick]
mild steel angle frame as shown in Drawing No
(………..).

T250 Double leave gate, [2400 mm x 1200 mm high] with nr


100 mm x 100 mm Grade A wrot finish heavy
hardwood as frame and 12 SWG galvanised barbed
wire as shown in Drawing No. (…….).

Page Total carried to Summary of Part 7

Class T: Miscellaneous Work


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQT50 of BQT61
PART 7
Miscellaneous Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)

T300 SIGNAGES FOR BUILDINGS AND TANKS

Rate for internal and external signages shall be deemed


to include fixing complete.

Painting of Logos

Supply and paint [SYABAS] logo and lettering for


[water tank] at [Taman Gembira Cheras] as detailed in
the drawings and the following:

T310.1 Paint [SYABAS] logo for [water tank] at [Taman nr


Gembira Cheras] as per Specification clause (……….)
and detailed in Drawing No. (……….).

T310.2 Paint [TNB] logo for sub-station as per Specification nr


clause (……….) and detailed in Drawing No.
(……….).

External Signages

T320 Paint lettering for [water tank] at [Taman Gembira nr


Cheras] as per Specification clause (……….) and
detailed in Drawing No. (……….).

Internal Signage
Internal signage shall be as per Specification clause
(……).

T330.1 Laboratory. nr

T330.2 Work manager room. nr

T330.3 Control room. nr

T400 BEARING PADS

Bridge bearing
Supply and install the following bearings inclusive of
mortar grout, epoxy mortar, and all temporary work.

Roller

T411.1 Single roller bearing as shown in Drawing No. (…..). nr

T411.2 Multiple roller bearing as shown in Drawing No. (…..). nr

Page Total carried to Summary of Part 7

Class T: Miscellaneous Work


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQT51 of BQT61
PART 7
Miscellaneous Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)

Slide

T412.1 Plane sliding bearing as shown in Drawing No. (…..). nr

Rocker

T413.1 Cylindrical rocker bearing as shown in Drawing No. nr


(…..).

T413.2 Spherical rocker bearing as shown in Drawing No. nr


(…..).

Plain rubber

T414 [300 x 300 x 60 mm thick] plain rubber bearing as nr


shown in Drawing No. (…..).

Laminated rubber

T415 [300 x 300 x 80 mm thick] elastomer laminated rubber nr


bearing as shown in Drawing No. (…..).

Pot bearing

T416.1 Sliding guided pot bearing as shown in Drawing No. nr


(…..).

T416.2 Free standing pot bearing as shown in Drawing No. nr


(…..).

Other bearing

T424 300 mm wide x 60 mm thick plain rubber bearing for nr


joint between dome roof and wall as shown in Drawing
No. (…..).

Page Total carried to Summary of Part 7

Class T: Miscellaneous Work


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQT52 of BQT61
PART 7
Miscellaneous Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)

Summary of Part 7: Miscellaneous Work

Page BQP7/1

Page BQP7/2

Page BQP7/3

Page BQP7/4

Total of Part 7 carried to Grand Summary

Class T: Miscellaneous Work


C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQT53 of BQT61
CLASS Part 8
Drainage Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)

8P111.1 In earth for 300mm half round drain semi glazed earthen ware, m
depth not exceeding 1.5 m.

8P112.1 In earth for 300mm half round drain semi glazed earthen ware, m
depth 1.5 – 2.0 m.

8P112.2 In earth for 600 mm precast pipe culvert, depth 1.5 – 2.0 m. m

8P390 Subsoil drains; 300mm half round drain semi-glazed earthen m


ware.

8P510 Precast concrete; 1050 mm wide x 100 mm thick for [100 kN m


load] median drain.

8P611 600mm diameter single precast concrete pipe culvert, Class Y in m


standard length of 1 m.

8P720.1 In situ concrete; 900 mm x 900 mm x 1.65 m deep including nr


mild steel grating cover for [100 kN load].

8P720.2 In situ concrete; 900 mm x 900 mm x 1.71 m deep including nr


mild steel grating cover for [100 kN load].

8P720.3 In situ concrete; 900 mm x 900 mm x 1.76 m deep including nr


mild steel grating cover for [100 kN load].

8P720.4 In situ concrete; 900 mm x 900 mm x 2.10 m deep including nr


mild steel grating cover for [100 kN load].

8I125 Reinforced concrete to walls of subsurface drain. m2

8I131 Mass concrete blinding, 50 mm thick to concrete bed. m2

8I414.1 F2: fair finish to walls. m2

8I560 Fabric of other stated material. m2

8J111.1 225 mm thick cement sand brickwork laid in stretcher bond, m2


jointed in 1:3 cement mortar for vertical straight walls.

8J111.2 345 mm thick cement sand brickwork laid in stretcher bond, m2


jointed in 1:3 cement mortar for vertical straight walls.

8F311 Using suitable excavated material to grading limits as per m3


Specification.

Page Total carried to Summary Package 2


Part 15
Water Reticulation
Item No. Code No. Description Unit Qty. Rate Amount (RM)

O100 TRENCH EXCAVATION

Trench excavation shall be deemed to include


preparation of surfaces, excavation for bedding,
multiple handling, disposal of surplus excavated
material (including unsuitable material), upholding
sides of excavation, allowance for working space,
backfilling, removal of dead services, and
reinstatement of original surface unless covered by
separate items

150 mm DN pipe [Jalan Paip to Jalan Besi] as shown


in Drawing Nos (…) to (…). Width of trench shall be
as shown in Drawing No. (…) and Specification
clause (…).

O111 In earth for 150 mm DI pipe, depth not exceeding 1.5 m


m.

Extras to Trench Excavation

O124 Roads and pavement, rate to include road cutting and m2


reinstatement.

Excavation for Manholes and Chambers

O131 In earth for [valve chambers]. m3

O200 BACKFILLING AND BEDDING MATERIALS

Bedding

O211 [450 mm thick] sand bedding as per Specification m


clause (…..) and as shown in Drawing No. (….).

O213 [450 mm thick] Grade C20 mass concrete bedding. m


Rate to include formwork.

Backfilling

O231 Backfilling with sand to Specification clause (….). m3

O300 PIPES

Supply, laying or install. Rate to include all pipe


cutting, wrapping, lining, and lagging as required.

[Spigot socket ended] ductile iron pipes to [BS EN


545, with metallic zinc and bitumen external coating
and cement mortar lined internally] as per
Specification clause (…). Rate to include supply and
making joints complete for the following:

O322.2 150 mm DN in standard length of 6 m. m

Page Total carried to Summary of Part 15

Class O: Pipework
C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQO55 of BQO61
Part 15
Water Reticulation
Item No. Code No. Description Unit Qty. Rate Amount (RM)

O400 FITTINGS, VALVES, AND JOINTS

Straight Specials

Item for straight specials shall be deemed to include


cutting where applicable.

[Mild] steel pipes and fittings, shall be to Grade 43A


to [BS 534, with bitumen wrap externally and concrete
lining internally] as per Specification clause (….):

Ductile iron pipes and fittings shall be to [BS EN


545, with metallic zinc and bitumen external coating
and cement mortar lined internally] as per
Specification clause (…).

O413.1 [150 mm DN] flanged ended mild steel pipes, [2000 nr


mm] long. Flanges shall be [PN 16 to BS EN 1092-1].

Fittings

O421.1 [150 mm DN, 90-degree double socket ended ductile nr


iron] vertical bend.

O423.1 [150 mm DN] plain ended barrel with [150 mm DN] nr


flanged branch level invert mild steel tee.

O428 [150 mm DN] double flanged ductile iron duckfoot nr


bend.

Valves

O435 [150 mm DN] pressure reducing valves as per nr


Specification clause (…).

O436 [150 mm DN] pressure sustaining valves as per nr


Specification clause (…).

O444 Pillar hydrants with double outlets as per Specification nr


clause (….).

Joints

Items for joints shall include supply of all jointing


materials, bolts, nuts, washers, gaskets, making good
of joints both internally and externally.

O455 [300 mm DN] flange adaptor joints as shown in nr


Drawing No. (….).

Testing and Inspection

Rate for testing and inspection shall be deemed to


include provision, and removal of all equipment, and
ancillaries required for testing.

Page Total carried to Summary of Part 15

Class O: Pipework
C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQO56 of BQO61
Part 15
Water Reticulation
Item No. Code No. Description Unit Qty. Rate Amount (RM)

O823 Pressure and leakage testing for [150 mm DI pipe] m


from Jalan [Pipe] to Jalan [Besi]. Rate to include
provision of all water required for testing.

Connections to Existing Sewer System

Item for connections to existing sewer system shall be


deemed to include coordination with authorities,
payment of fees, isolations for shutdown of flows, and
dewatering.

O841 At existing [brick] manhole, size [1.5 m x 1.5 m x 2.0 nr


m deep of [600 mm DN] vitrified clay sewer pipe.

O842 At Y-junction of existing [600 mm DN] vitrified clay nr


sewer pipe.

O843 With saddle connection to existing [600 mm DN] nr


vitrified clay sewer pipe.

O844 New manhole at existing [600 mm DN] vitrified clay nr


sewer pipe. Rate to include breaking away of existing
sewer pipe as required and all pipework and
metalwork within the manhole.

Connection to Existing Water Mains

O851 Hot tapping connection work to existing [900 mm DN nr


steel pipeline] as shown in Drawing No. (…..). Rate to
injclude tapping tees, isolating valve, and testing.

O852 Shut down connection work to existing [900 mm DN nr


steel pipeline] as shown in Drawing No. (…..). Rate to
include coordination with authorities, payment of fees,
isolations for shutdown of flows, and dewatering.

Page Total carried to Summary of Part 15

Class O: Pipework
C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQO57 of BQO61
Part 15
Water Reticulation
Item No. Code No. Description Unit Qty. Rate Amount (RM)

Summary of Part 15: Water Reticulation

Page BQP15/1

Page BQP15/2

Page BQP15/3

Total of Part 15 carried to Grand Summary

Class O: Pipework
C:\Users\user\Desktop\USB Drive\Lost Folders\DIR259\CESMM Page BQO58 of BQO61
PART 16
Sewerage
Item No. Code No. Description Unit Qty. Rate Amount (RM)

O100 TRENCH EXCAVATION

Trench excavation shall be deemed to include


preparation of surfaces, excavation for bedding,
multiple handling, disposal of surplus excavated
material (including unsuitable material), upholding
sides of excavation, allowance for working space,
backfilling, removal of dead services, and reinstatement
of original surface unless covered by separate items.

225 mm vitirified clay pipe as shown in Drawing No.


JPS/JPZ/5095/11/INF/SEW/01. Width of trench shall
be as shown in Drawing No.
JPS/JPZ/5095/11/INF/SEW/03 and Specification
clause (…).

O111 In earth for 225 mm vitirified clay pipe, depth not m


exceeding 1.5 m.

Excavation for Manholes and Chambers

O131.1 In earth for [manholes]. m3

O200 BACKFILLING AND BEDDING MATERIALS

Bedding

O212 [150 mm thick] granular material as bedding as per m


Specification clause (…..) and as shown in Drawing
No. Drawing No. JPS/JPZ/5095/11/INF/SEW/03.

Backfilling

O231 Backfilling with sand to Specification clause (….). m3

O300 PIPES

Supply, laying or install. Rate to include all pipe


cutting, wrapping, lining, and lagging as required.

Sewerage Pipework

Vitrified clay pipes, spigot socket ended including


supply and making joints complete as per Specification
clause (….) for the following:

O311.2 [150 mm DN] in standard length of 1.50 m. m

Page Total carried to Summary of Part 16


O800 MISCELLANEOUS WORK

Sewer Manholes

O814 Precast concrete manholes Type [2] with heavy duty nr


cover and frame as shown in Drawing No. Drawing
No. JPS/JPZ/5095/11/INF/SEW/03.

Testing and Inspection

Rate for testing and inspection shall be deemed to


include provision, and removal of all equipment, and
ancillaries required for testing.

O821 Testing of [300 mm DN vitrified clay pipe] gravity m


sewer. Rate to include testing by infiltration and
provision of all water required for testing.

Connections to Existing Sewer System

Item for connections to existing sewer system shall be


deemed to include coordination with authorities,
payment of fees, isolations for shutdown of flows, and
dewatering.

O841 At existing manhole, size [1.5 m x 1.5 m x 2.0 m deep nr


of [600 mm DN] vitrified clay sewer pipe.

Page Total carried to Summary of Part 16


Summary of Part 16: Sewerage

Page BQP16/1

Page BQP16/2

Total of Part 16 carried to Grand Summary

You might also like