Professional Documents
Culture Documents
Ref.
PIPE WORK
PIPE WORK
E Imported granular material bed and surround to L531 m 907.19 91.72 83,207.47
200mm dia uPVC sewer pipe
PIPE WORK
H Imported granular material bed and surround to L532 m 63.21 105.77 6,685.72
250mm dia uPVC sewer pipe
Page 1 of 5
BILL OF QUANTITIES BILL PART PAGE
MOHAMMED BIN RASHID AL MAKTOUM
CITY DISTRICT 11 SECTION Nr. Nr.
EXTERNAL ROADS AND UTILITIES - SEWERAGE WORKS
d 10 d/10/2
ITEM ITEM DESCRIPTION CESMM3 UNIT AMOUNT
QUANTITY RATE
U.A.E. Dhs.
Ref.
PIPE WORK
B Imported granular material bed and surround to L533 m 920.72 134.16 123,523.80
315mm dia uPVC sewer pipe
PIPE WORK
E Imported granular material surround to 400mm dia L533 m 665.86 162.27 108,049.10
GRP pipe
Page 2 of 5
BILL OF QUANTITIES BILL PART PAGE
MOHAMMED BIN RASHID AL MAKTOUM
CITY DISTRICT 11 SECTION Nr. Nr.
EXTERNAL ROADS AND UTILITIES - SEWERAGE WORKS
d 10 d/10/3
ITEM ITEM DESCRIPTION CESMM3 UNIT AMOUNT
QUANTITY RATE
U.A.E. Dhs.
Ref.
PIPE WORK
B Imported granular material surround to 500mm dia L533.1 m 247.30 232.44 57,482.41
GRP pipe
E Imported granular material surround to 600mm dia L533.2 m 256.03 278.91 71,409.33
GRP pipe
Connection to Pipes/Manhole
Connect new 600mm GRP pipe to existing K853 nr 3.00 89,598.00 268,794.00
manhole / Network including additional fillings,
excavation, backfill, diversions and all necessary
works and accessories to complete as per
drawings and specification.
LM 256.00
Non disruptive special pipe laying using micro
tunneling method for installing pipes. (The
rate shall include for all caissons, grouting,
service diversions, control and diversion of
existing flows in pipes by blocking, plugging
or over pumping during 'no dig' operations.)
G Nominal bore 600 mm dia GRP pipe using Pipe K135 nr 2.00 13,832.42 27,664.84
Jacking Method
LM 56.00
Page 3 of 5
BILL OF QUANTITIES BILL PART PAGE
MOHAMMED BIN RASHID AL MAKTOUM
CITY DISTRICT 11 SECTION Nr. Nr.
EXTERNAL ROADS AND UTILITIES - SEWERAGE WORKS
d 10 d/10/4
ITEM ITEM DESCRIPTION CESMM3 UNIT AMOUNT
QUANTITY RATE
U.A.E. Dhs.
Ref.
Page 4 of 5
BILL OF QUANTITIES BILL PART PAGE
MOHAMMED BIN RASHID AL MAKTOUM
CITY DISTRICT 11 SECTION Nr. Nr.
EXTERNAL ROADS AND UTILITIES - SEWERAGE WORKS
d 10 d/10/5
ITEM ITEM DESCRIPTION AMOUNT
U.A.E. Dhs.
PART SUMMARY
Page 5 of 5