You are on page 1of 1

FFL 32.

84

EX. LIFT
LOBBY DP
EX.TF
EX. LIFT 1
K EX. SSL 32.785

COS
SM.12
L EL. CUP'BD

COS
COS

960
CJ CST CJ
PB BH SSL 32.93
M ABOVE PB BH
JM.01
EX. LIFT 2
SM.01 ABOVE
TF
EX. STAIR WAITING AREA FFL 32.84

3,190

1,000
CPT6
SSL 32.83 200 EX. STAIR EXTENT OF NEW CONC SLAB
1,710 11

CLEAR
FHR SSL 32.84

MIN.
DM.04 CLEAR MIN.

200
NEW PB BH DM.02 DM.01
FACE OF EXIST. WALL L3 L3 P8 SM.11
ABOVE SHOWN DOTTED P8 CST
CONCRETE TOPPING TO P8 S11
EXISTING SLAB TO EX. DM.03
MATCH PROPOSED LEVEL SSL 32.79 SM.04 CB12
WD12
SM.06
TENANCY HR6

DM 03
EXISTING EXISTING

3,395
DM.05 CONC NEW CONCRETE / STAIR
PIPEWORK NEW MECHANICAL GRILLES CONTROL
IN EXIST. WALL, ROOM P8 PENETRATION

2,069
POSITION TO BE COS
NEW SLAB LVG.01 SSL 32.83 CEMENT TOPPING TO

400
SM.04
PENETRATIONS EXIST SLAB AND MATCH

295
LVG.02 L4 CORRIDOR
LINE OF EXISTING SLAB CONC PROPOSED LEVEL

C
L
800 1,370 SSL 32.83

COS
VOID
LVG.03

2,000
SM.03
NEW CONC SLAB P20 P3 VOID

3,480
EX. LVG.04 TENANCY
CHANGE CONC
ROOM 1,550
SSL 32.83

550
STF VOID
P20

P20
80
VOID
01 EX. FIRE STAIR 8
LINE UP STUD WALL WITH MECHANICAL
WD07 EX. EXISTING WINDOW MULLION RISER
CHANGE

3,100
2,970
ROOM

3,905
CAPPED OFF P20
EX. MEZZANINE
HYDRAULIC

2,900
CONCRETE FLOOR TO BE VOID
SERVICES
EXTENDED TO AREA SHOWN
P EX .TOILET
P3 (1000mm) P20

SC 700

1 2 3 4 6 7 8 10 11 13 14

Mezzanine Plan Construction 1:100

H C.L. OF COLUMNS

02 03
WD07 WD07
6,000
COS

FFL 29.425 FFL 30.085

S15
WD13 HR10 EX. CAFE EX. LIFT 1
K CT13
DG.12 TF3 DG.13 TF3
L FACE OF EX. WALL HR5

L4 CJ CJ L1
960
COS

INSIDE FACE OF EX. COLUMN JG 01 DW L5


M 5 4 3 2 1

1,100
EXIST. BULKHEAD DG.40 EX. LIFT 2
TF1 DG.49
ABOVE
A Issued for Construction 17/07/12
HR7 L1 SG.06
EX. STAIR 6
STAIR 13
L4 S13 REHEAT Nº Revision Date
WD12 D03 KITCHEN
L4 NEW INFILL P14 SG.16
WD11 DG.16 GARBAGE
WALL TO P19 CT1
EXIST. F STORE
P3 P3
NEW TIMBER STAIR OPENING P1 FFL 30.085 PCCT (EX)
OVER EXISTING TO DETAIL SG.17
SG.07 DG.17 BOOK
UNISEX P14

SG.07
1,950
RETURN
DA WC AP P14 PCCT (EX)
21.73

L3
D04 DG.41 CT10 EXIST. BOOK RETURN
5"

NEW L1
SG.02 P1 SG.11
121°01'3

WD11

92
STRUCTURAL STAIR ABOVE
EXISTING STAGE SG.01 L1 MALE
STEEL COLUMN P21
FFL30.450 UPGRADE PB PARTITIONS EXISTING TOWN HALL
TO ENGINEER'S DA WC DG.47 SHOWN DOTTED
ARY

CT10

SG.08
CT1

2,150
AROUND STAGE TO FRL -/60/60 DETAIL
13580

FFL 29.425 SG.08 L3


COS

LINE OF NEW PB WALL

CORRIDOR
(ADDITIONAL LAYER 16mm P20
BOUND

EX 29.350 P19 MALE WC P14


FYRCHEK) ON MEZZ. OVER

SG.05
DG.52 NEW LIGHTING BAR DG.45 P13 NORTH
TO ELECTRICAL DRAWINGS P2 P1
Ashfield Civic Centre

92
WING
DG.51 D03 SG.08A
ENTRY

SG.08A
AIRLOCK
HEARING INDUCTION
Phase 2 - Stage 3

1,550
WD11 P2 SG.12
EXISTING BULKHEAD LOOP IN FLOOR REFER DG.42 P1
OVER TO ELECTRICAL SERVICES CT10 P20
DG.56 ENTRY DOOR TO BE INSTALLED

92
SG.03 DRAWING P1 P1 CT10 FOLLOWING COMPLETION OF
STORE
DG.43 DG.46 SG.09 REMAINING PHASE 2 WORKS

SG.09A
1,948
EX.TF L1
SG.09A FEMALE WC P20
NEW TIMBER STAIR
01 OVER EXISTING
AIRLOCK
P1 NEW INFILL CT10
WD07 L4 WALL TO

92
STAIR 12 EXIST. P3 P3 P20 D02
OPENING P19 WD08
SG.04 DG.50 L4 L4 SG.10
S12

SG.10
2,115
ACCESSIBLE TO DETAIL L1 FURNITURE
SG.04

P20
2,870

CHANGE ROOM HR7 WD12 STORE

1,100
EX.TF TF1 DG.48
DG.44 SR1 NEW VOID
INSIDE FACE OF EX. COLUMN 5 4 3 2 1

P STAGE
TO EXIST.

600
L4 JG 02 P3 P20 P20 SLAB
EXIT DG.54

DG.55 HR9 92 92
HR5 1,325 900 92 600 100 125 1,250
9 8 7 6 5 4 3 2 1
SG.05 SG.08 SG.08 Clear SG.17 Suite 1201, 54 Miller Street
TGI TGI STAIR 14 HR8 EXISTING DOOR AND HOOD
/09A
McDivitt Group North Sydney NSW 2060
T: 02 99675392 M: 0402 053 704
E mga@tpg.com.au
HR5 OVER ALTERED TO SUIT W: www.mcdivittgroup.com.au
NEW FLOOR LEVEL NEW FIXED GLAZING
EXIST PAVING TO BE RELAID TO
TO MATCH EXISTING
WHERE DOORS REMOVED
Architects NSW Architects Registration Board Nº: 4207
ACHIEVE LOCALISED RAMP 1:8 ABN Nº: 13 050 059 811

S16 S14 TO THRESHOLD


WD12 WD13
Ground & Mezzanine
INSIDE FACE OF EX. WALL

5 PORTION 3 PORTION 1

C.L. OF EX. COLUMNS


C.L. OF EX. COLUMNS
C.L. OF EX. COLUMNS

C.L. OF EX. COLUMNS


C.L. OF EX. COLUMNS

C.L. OF EX. COLUMNS


C.L. OF EX. COLUMNS

TOWN HALL WORKS GROUND FLOOR

02 03 04 Construction Plan
WD07 WD07 WD07
THE PROPERTY IN THIS DRAWING AND IN THE
CONCEPTS REMAIN WITH McDIVITT GROUP
ARCHITECTS. ANY UNAUTHORISED USE OF THIS
DRAWING, AS TO THE WHOLE OR PART MAY RENDER
4,600 4,750 4,750 4,750 4,745 4,750 4,200 THE USER LIABLE TO AN ACTION FOR DAMAGES.
CONSEQUENTIAL EVENTS OR DAMAGES ARISING FROM
COS COS COS COS COS COS COS UNWARRENTED OR UNAUTHORISED USE SHALL NOT
RENDER McDIVITT GROUP ARCHITECTS OR THEIR

1 2 3 4 6 7 8 10 11 ASSOCIATED COMPANIES LIABLE.

Date: Project No: AMEND


June 2012 12 852
Scale: Drawing No:

Ground Floor Plan Construction 1:100


1:100@A1
WD05 A

You might also like