Professional Documents
Culture Documents
BARANGAY HALL
WITH GYMNASIUM
TACLOBO, DUMAGUETE CITY
BARANGAY HALL
SUNRISE
SUNSET
PREVAILING WIND
PREVAILING WIND
SITE DEVELOPMENT PLAN
2.150
RAMP
1.654
ENTRANCE
7
8
6
9
5
10
15G x 0.260
15R x 0.170
4.843
4
11
3
12
2
13
1
14
UP 15
4.604
AREA
INFO DESK
1.243
BADAC
BDRRMC
5.101
4.985
BHRAC CEDULA AND
BRGY.
CLEARANCE
VAWC
DESK
4.699
4.713
SK
ROOM
JANITOR'S
EQUIPMENT
ROOM
3.992
MEDICAL
ROOM MALE FEMALE PWD
1.505
CR CR CR
0.200
1.149 3.008 1.729 1.162 1.295 1.605
1.202
Balcony
7
8
6
9
5
10
15G x 0.260
15R x 0.170
4
11
3
12
2
13
OPEN TO
5.798
1
14
UP 15
BELOW DOWN
stairs
2.776
Hallway
Treasurer's
Desk
Hallway
9.688
Secretary's
Desk
10.896
50 seater
Conference
Room
Brgy. Captain's
0.114
Desk
2.127
Kitchenette
1.626
F
1.675
Male CR Janitor's
Equipment room
RG
Emergency
Exit
0.200
4.411 1.392 1.295
6.931
9.639
5.000
ROOF PLAN
SCALE: 1:100
1.034
CEILING LINE
3.000
SECOND FLOOR LINE
3.570
3.000
FIRST FLOOR LINE
0.400
GROUND FLOOR LINE
FRONT ELEVATION
SCALE: 1:100
1.055
CEILING LINE
3.000
SECONDFLOOR LINE
3.570
0.350 2.650
FIRST FLOOR LINE
GROUND FLOOR LINE
REAR ELEVATION
SCALE: 1:100
0.4040.651
TOP OF THE ROOF
CEILING LINE
3.000
SECOND FLOOR LINE
3.000
FIRST FLOOR LINE
0.400
GROUND FLOOR LINE
0.982
CEILING LINE
3.0
SECOND FLOORSECOND
LINE FLOOR LINE
3.0
FIRST FLOOR LINE
0.4
GROUND FLOOR LINE
SCHOOL
X-X
PROJECT NAME
Building Section
INSTRUCTOR SUBJECT 1:56.8
FRONT ELEVATION
SCALE: 1:100