Our Ref: REE/GEN-01/19-20 Date: 04.04.

2019

To
Superintending Engineer (CHP:INT)
HTPS, CSPGCL,
Korba West

Sub: Request for Permission to start the Erection work with our Authorized Contractor.

Ref: 1) Your Tender No. 03-03/T-22/2018/RFX 8100008681


2) LOI No. 03-03/TS-22/18/1846 dt. 27.07.2018
3) SAP Order No. 5500060410 Dtd. 13.08.2018

Dear Sir,
In Reference to the above “M/S ROHAN ENGINEERING ENTERPRISE” has got the PO of Supply, Erection
& Commissioning of 02 Nos Automatic Coal Sampler for 4x210 MW CHP:Int HTPS KWB.

“M/S ROHAN ENGINEERING ENTERPRISE” Supply the subjected system to CSPGCL and want to depute
“M/S BARON POWER AND INFRASTRUCTURE”, (Register Add: Nagoikhar, Darri Basti, Ward No.40,
Darri, Post. Jamnipali, Korba-495450) for Erection Work.

ESI Registration No of M/s Baron Power And Infrastructure is 5900159520000699


And PF No CGRAI1610153000

You are requested to give a permission to start the work.

Thanks & Regards

For Rohan Engineering Enterprise

Copy to.
1. The Sr. Chief Chemist, HTPS, CSPGCL, KORBA WEST
2. S.E (P&W) HTPS, CSPGCL: KORBA WEST

Encl.
1. PF & ESI Copy of “M/S Baron Power and infrastructure”