2 Section details
❑ E/S Payyanur is functioning under ESD Payyanur.
❑ The present office is working in a rented building near SS Temple
road, South bazar
❑ The section’s jurisdiction is around 45 sq kms and covers Payyanur
Municipality and Kankol – Alapadambha Grama Panchayat.
❑ Five11kV feeders(Payyanur, Kavvayi, Kadannapalli, Korom, IT
park) from 110kV substation Kankol, payyanur and Three 11kV
feeders(Kunhimangalam, Perumba, Kandoth) from 33kV Town
substation, Payyanur

ES PAYYANUR
System as on 31.10.2019
3 ❖ Area covered by the section : 45 sq. km
❖ 11kV OH line length : 85 km
❖ 11kV UG cable length : 7 km
❖ LT line length : 325km
❖ Total number of Transformers : 165 Nos
❖ 100KVA : 129 Nos
❖ 160KVA : 19 Nos
❖ 250KVA : 17 Nos
❖ Total number of LT consumers : 26084 Nos
❖ Number of HT consumers : 24 Nos
❖ Number of DTR meters : 155 Nos
❖ Faulty Meters : Nil
▪ Number of CT meters : 40 Nos
4 ▪ Number of Deemed HT consumers : Nil
▪ Average new connection per month : 60
▪ Average Dismantling per month :20
▪ Healthy meter status : 100%
▪ Status of Mechanical meter change : 95% ( 900 is replaced out of 940)

▪ Number of registered NACH consumers : 213 Nos


▪ Presently active NACH consumers :154 Nos
▪ OMS Efficiency :99.48%
▪ E- Payment : 19.80% ( in section) (21% in Division level)
▪ E- Payment : 21.10% ( in state level)
ES PAYYANUR
Single Phase Consumers=
Total no. of LT 23968
5 Total no. of Consumers=26084
Consumers =
26108 Three Phase Consumers=
Total no. of HT 2116
Consumers=24

Tariff Single Three Total


Phase Phase
Domestic 16002 1140 17142
Commercial 7062 610 7672
Industrial 57 332 389
Agriculture 695 33 728
Street Light 152
KWA 1 1
Total = 26084
ES PAYYANUR
6
Achievementes during 2018-19
❑ Completed IPDS work-
• Construction of 11kV line in 2.5kms
• Reconductoring done on 11kV line is 1.5kms
• New LT line - 1.8kms
• LT coversion – 4.9kms
• Reconductoring LT line – 6kms
• New transformer installation - 3Nos

ES PAYYANUR
Progress of PMU Work 2018-19
7 ❑ Total Number of Scheduled works – 11 Nos
❑ Number of Works Completed - 4 Nos
❑ Seven works are pending due to material shortage.
❑ Financial Progress – 67.15%

Progress of PMSU Work 2018-19


❑ Total Number of Scheduled works – 10 Nos
❑ Number of Works Completed - 5 Nos
❑ Number of Works in progress – 5 Nos
❑ Financial Progress – 52.79%

ES PAYYANUR
8 RAPDRP SCHEME

❑ Communication of Feeder meter and Border meter is 100%.


❑ DTR meter communication is 50%.
❑ Consumer indexing completed upto 09/2019.
❑ Delta updation (LT OH Service) is handed over to Redleaf upto
07/2019.
❑ AT&C loss is 7.3%

ES PAYYANUR
Collection Details
9
 Total Collection around : 2Crore
 Demand variation : 14,50,000 – 2,23,00,000
 Collection Efficiency : 99 – 100 %
 Approximate balance to be collected on every month : Rs.40,000/-
 APTS and Section Inspections during last year : 6 NoS (16612, 18802,
12433, 31481, 2830, 5760) – Amount collected as fine = Rs.1,87,918/-
 Revenue Recovery for last one year : Nil
 Pending amount in Revenue recovery = Rs.38387/- 2 Nos. (652 &17) , OTS
Notice issued.
 Number of consumers under litigation : 1 No. ( Click Studio) –
Electricity Charge = Rs.4,04,527/- and Belated Interest= Rs.675561/- , OTS
Notice issued.

ES PAYYANUR
Collection Efficiency for the last one year
10 Month With in 5 days (in %) Collection after 5 days (in %)

10/2018 99.41 99.87


11/2018 99.57 99.86
12/2018 99.21 99.78
01/2019 99.45 99.77
02/2019 99.56 99.85
03/2019 99.58 99.75
04/2019 99.21 99.80
05/2019 98.76 99.31
06/2019 99.09 99.75
07/2019 98.27 99.48
08/2019 98.67 99.73
09/2019 98.63 99.11
ES PAYYANUR
❑ Consumption Details
Maximum Demand : 3506597 Units – Rs.23652779/- on 06/2019
11 Minimum Demand : 2463595 Units – Rs.17440895/- on 10/2019

❑ In 10/2019
Revenue/Consumer = Rs.1310.41/-
Revenue/Connected Load = Rs.596.54/-
Revenue/Unit = Rs.6.76/-

❑ In 10/2019 D/C = 96.61%

DC RC Remarks
Domestic 683 678 ---
Commercial 752 704 Govt. Consumers
Industry 62 62 ---
Agricultre 68 68 272 KB

ES PAYYANUR
12
VDS Details
✓ Number of Consumers Declared Load through VDS for the
last one year : 1439 Nos
✓ Number of Commercial Consumers Declared Load through
VDS for the last one year : 254 Nos
✓ Increment in Amount by effecting VDS during last Two
Months is approximately around Rs.30,000/-

❑Krishi Bhavan Demand

KB Demand issued upto 09/2019 = Rs.20832/-


KB Paid upto 09/2019 = Rs.20832/-

ES PAYYANUR
Arrear Analysis (as on 31.10.2019)
13 ❑ Arrears as on 31.10.2019 = Rs.60,23,002/-
>5 3-5 1-3 Years 6 Months- 1-6 Months Current Total
Years Years 1Year
Domestic 31392 --- 6577.20 4899 40897 3940806.47 4024571.67

Police 355503 --- --- --- 12556.41 --- 368059.41

Krishi --- --- --- 819.13 4139.47 385.04 5343.64


Bhavan
BSNL --- --- --- --- 131565 5912 137477

KWA --- --- --- 265361 4426 --- 269787

Others 7634 --- 1508 45510 9.54 --- 54661.54

Total 394529 0 8085.20 316589.13 193593.43 3947103.51 4859900.26

• Rs.31392/- , Con.No. :672 , Rs.6577.20/- Con.No.: 28616


•Rs.7634/- , Con.No.:17 , Rs.1508/- Con.No.: 8856(KWA)
14 Billing Efficiency for the last Six Months
Month Billing Efficiency (%)

05/2019 99.30
06/2019 99.27
07/2019 99.09
08/2019 87.30
09/2019 73.70
10/2019 94.08

❑Billing Efficiency of 11/2019 upto 19.11.2019 : 88.71%

ES PAYYANUR
15 Strengths
▪ Experienced and Efficient Staff.
▪ Excellent and commited Revenue, Maintanance and
Breakdown Team.
▪ Multiple options for arranging HT feedback, thus enabling
to cut down time of feeders.
▪ Willing to take up challenges and meet deadlines.

ES PAYYANUR
16
Weakness
▪ During summer season the transformer oil
temperature of 33kV S/S transformer raise to
maximum and back feed is needed from 110kV S/S
on each day.

ES PAYYANUR
17

ES PAYYANUR