The fact is part of the information which shows the reality, the situation and
relation that guarantee analysis and modeling.
For each of these steps, some tasks need to be done by a systems analyst. So that
makes it easy to do coordination and surveillance, the Coordinator of the team of
analysts can make a working paper containing the tasks that must be done for each
step of the analysis of these systems.
3. IDENTIFY THE PROBLEM
Identify (to know) the problem is the first step conducted in the phase analysis
system. The problem can be defined as a question that is desirable to solved. It was
this issue that led to a goal from system can not be achieved. Therefore, the first
step should be performed by a systems analyst is to identify in advance the
problems that occur.
The tasks to be done are: systems analyst:
1. Identify the cause of the problem
2. Identify a decision point
3. Identify key personnel-personnel
Analyzing the weakness of the system is otherwise done to answer the question:
1) why do done?
2) do done?
3) whether it has been done well?
The desired target by the new system is determined by the assessment criteria
are as follows: the relevance, capacity, efficiency, timeliness, accessibility,
flexibility, accuracy, reliability, security, economy, simplicity.
Based on this criteria and questions, systems analyst will be able to do the
analysts from the research results for find the weaknesses and the problems of the
existing system.
Report the results of the analysis submitted to the Steering Committee (the
Steering Committee) that will be forwarded to the management. Steering Committee
together with the management and users the system will learn the findings and
analysts who have performed by a systems analyst are presented in this report.
The main purpose of the submission of these reports to management are:
1) Analysis has been completed
2) Straighten out any conceptions about what has been found and analyzed by
system analysts but not in accordance According to the management
3) Asking for opinions and advice from the management
4) Asking for approval to the management to do the next action (can be either
forward to the stage of design the system or stop the project when it is deemed
not feasible anymore)
All the results obtained from the research need to be attached to the report the
results of this analysis, so that management and the user can check back the truth of
the data that has been retrieved.
REFERENCE
Thank to Almighty God who has given His bless to the writer for
finishing the APSIA paper assignment entitled “system analysis”.
Author
SYSTEM ANALYSIS
3EB14
Created by
Faculty of economics
University of gunadarma
Depok
2019