CONSTRUCTION AND COMPLETION OF LIGHT RAIL Inspection
TRANSIT LINE 3 (LRT 3) FROM BANDAR UTAMA TO JOHAN SETIA , Western Corridor, GS06 Page Page 1 of 2 SIR REF NO : KVLRT3-RKSB-GS06-WC-SIR-UTL-xxxxx LOCATION : DESCRIPTION OF WORK: Photos of xxxx Works at xxx
Trial hole at xxxx
PROJECT : Date of CONSTRUCTION AND COMPLETION OF LIGHT RAIL Inspection TRANSIT LINE 3 (LRT 3) FROM BANDAR UTAMA TO JOHAN SETIA , Western Corridor, GS06 Page Page 2 of 2 SIR REF NO : KVLRT3-RKSB-GS06-WC-SIR-UTL-00xxxx LOCATION : DESCRIPTION OF WORK: Photos of xxxx Works at xxx