100.1 The work herein specified shall be done in accordance with the
accompanying plans and specifications. It is also understood that
all works covered in this sub-project shall be executed in the form
of workmanship and quality of materials.
installed replacing the old fixture must be conform to the quality standard approved
by the owner.
205 The contractor shall be responsible for proper disposal of the debris
/ garbage of the project.
301 All concrete works shall be done in accordance with the standard
specifications for the concrete materials as adopted and the
following proportion shall be used:
Class A (1:2:4) for columns and roof beams
Class B (1:2½:5) for column and wall footings, slab on fill
and other structures not specified
Mortar (1:4) for CHB filler
(1:3) for cement plaster