Professional Documents
Culture Documents
HJVTHT
HJVTHT
Air Kerja
Listrik Kerja
P1 2. Pasir Urug
Lantai Kerja pondasi tapak 1,5 x 1,2 x 1,2
0.05 x 1.2 x 1.2 x 12 = 0.864 m3
P1 3. Lantai Kerja
Pasir Urug pondasi tapak 1,5 x 1,2 x 1,2
0.05 x 1.2 x 1.2 x 12 = 0.864 m3
No. Perhitungan / Uraian Pekerjaan
P2 Pasir Urug pondasi tapak 1,5 x 0,6 x 1,2
0.05 x 0.6 x 1.2 x 8 = 0.288 m3
Besi D 13
Bott D 13 - 0.15
Y = 0.8 x 9 = 7.2
X = 1.4 x 5 7
Top D 13 - 0.3
Y = 0.6 x 5 = 3
X = 1.2 x 3 3.6
20.8 m' x 1.041885 x 12 =
Besi D 13
Bott D 13 - 0.15
Y = 1.4 x 5 = 7
X = 0.8 x 9 7.2
Top D 13 - 0.3
Y = 1.2 x 3 = 3.6
X = 0.6 x 5 3
20.8 m' x 1.041885 x 8 =
Besi D 13
Bott D 13 - 0.15
Y = 0.8 x 5 = 4
X = 0.8 x 5 4
Top D 13 - 0.3
Y = 0.6 x 3 = 1.8
X = 0.6 x 3 1.8
11.6 m' x 1.041885 x 5 =
No. Perhitungan / Uraian Pekerjaan
Tulangan Pokok
6 D 13
= 6 x 92.5 x 1.04189 = 578.246 Kg
Sengkang
Ø 8 - 0.2
= 462.5 x 0.395 = 182.484 Kg
Bekisting
= 0.4 x 92.5 x 2= 74 m2
Tulangan Pokok
4 D 13
= 4 x 31.25 x 1.04189 = 130.236 Kg
Sengkang
Ø 8 - 0.2
= 156.25 x 0.395 = 61.650 Kg
Bekisting
= 0.3 x 31.25 x 2= 18.75 m2
Tulangan Pokok
8 D 13
= 8 x 2.1 x 18 x 1.042 = 315.066 Kg
Sengkang
Ø 8 - 0.15
= 6 x 18 x 0.39456 = 40.245 Kg
Bekisting
= 0.4 x 0.7 x 2x 18 = 10.08 m2
= 0.25 x 0.7 x 2x 18 = 6.3 m2
16.38 m2
Tulangan Pokok
8 D 13
= 8 x 4.36 x 19 x 1.042 = 690.478 Kg
No. Perhitungan / Uraian Pekerjaan
Sengkang
Ø 8 - 0.20
= 22 x 19 x 0.39456 = 161.553 Kg
Bekisting
= 0.4 x 4.11 x 2x 19 = 62.472 m2
= 0.2 x 4.11 x 2x 19 = 31.236 m2
93.708 m2
Tulangan Pokok
6 D 13
= 6 x 5.86 x 5 x 1.042 = 183.163 Kg
Sengkang
Ø 8 - 0.20
= 29 x 5x 0.39456 = 57.310 Kg
Bekisting
= 0.3 x 5.61 x 2x 5 = 16.83 m2
= 0.2 x 5.61 x 2x 5 = 11.22 m2
28.05 m2
Tulangan Pokok
4 D 10
= 4 x 4.36 x 21 x 0.617 = 225.787 Kg
Sengkang
Ø 8 - 0.20
= 22 x 21 x 0.39456 = 178.558 Kg
Bekisting
= 0.15 x 4.11 x 2x 21 = 25.893 m2
= 0.15 x 4.11 x 2x 21 = 25.893 m2
51.786 m2
Tulangan Pokok
6 D 13
= 6 x 109.85 x 1.04189 = 686.706 Kg
Sengkang
Ø 8 - 0.2
= 549.25 x 0.395 = 216.712 Kg
Bekisting
No. Perhitungan / Uraian Pekerjaan
= 0.4 x 109.85 x 2= 87.88 m2
= 0.2 x 109.85 x 1= 21.97 m2
109.85 m2
Tulangan Pokok
4 D 13
= 4 x 28.15 x 1.04189 = 117.316 Kg
Sengkang
Ø 8 - 0.2
= 140.75 x 0.395 = 55.534 Kg
Bekisting
= 0.3 x 28.15 x 2= 16.89 m2
= 0.2 x 28.15 x 1= 5.63 m2
22.52 m2
Besi D 8
Bott D 13 - 0.15
Y = 21.2 x 56.5 = 1197.8 m'
X = 8.325 x 142.3333 = 1184.93 m'
Bott D 13 - 0.30
Y = 21.2 x 28.75 = 609.5 m'
X = 8.325 x 71.66667 = 596.625 m'
3588.85 m' x 0.3946 = 1416.017 Kg
Besi D 8
Bott D 13 - 0.15
Y = 0.975 x 29.000 = 28.275 m'
X = 4.2 x 7.5 = 31.5 m'
Bott D 8 - 0.30
Y = 0.975 x 15.000 = 14.625 m'
X = 4.2 x 4 = 17.85 m'
92.25 m' x 0.3946 = 36.398 Kg
1452.415 Kg
Besi D 8
No. Perhitungan / Uraian Pekerjaan
Bott D 13 - 0.15
Y = 4.525 x 9 = 40.725 m'
X = 1.2 x 31.16667 = 37.4 m'
Bott D 8 - 0.30
Y = 4.525 x 5 = 22.625 m'
X = 1.2 x 16.08333 = 19.3 m'
120.05 m' x 0.3946 = 47.367 Kg
Besi D 8
Bott D 13 - 0.15
Y = 1.225 x 9 = 11.025 m'
X = 1.2 x 9.166667 = 11 m'
Bott D 8 - 0.30
Y = 1.225 x 5 = 6.125 m'
X = 1.2 x 5.083333 = 6.1 m'
34.25 m' x 0.3946 = 13.514 Kg
Besi D 8
Bott D 13 - 0.15
Y = 1.5 x 9 = 13.5 m'
X = 1.2 x 11 = 13.2 m'
Bott D 13 - 0.30
Y = 1.5 x 5 = 7.5 m'
X = 1.2 x 6 = 7.2 m'
41.4 m' x 0.3946 = 16.335 Kg
1375.199 Kg
Bekisting
= 21.2 x 8.325 = 176.49 m2
= 0.975 x 4.2 = 4.095 m2
180.585 m2
Void = 4.525 x 1.2 = 5.43 m2
1.225 x 1.2 = 1.47 m2
1.5 x 1.2 = 1.8 m2
171.885 m2
B PEKERJAAN LANTAI II
K1 Kolom 0.2 x 0.4 x 3.2 x 18
= 0.2 0.4 3.2 18 = 4.608 m3
Tulangan Pokok
8 D 13
= 8 x 3.45 x 18 x 1.042 = 517.608 Kg
Sengkang
Ø 8 - 0.20
= 17 x 18 x 0.39456 = 120.735 Kg
Bekisting
= 0.4 x 3.2 x 2x 18 = 46.08 m2
= 0.2 x 3.2 x 2x 18 = 23.04 m2
69.12 m2
Tulangan Pokok
6 D 13
= 6 x 3.45 x 1 x 1.042 = 21.567 Kg
Sengkang
Ø 8 - 0.20
= 17 x 1x 0.39456 = 6.708 Kg
Bekisting
= 0.3 x 3.2 x 2x 1 = 1.92 m2
= 0.2 x 3.2 x 2x 1 = 1.28 m2
3.2 m2
Tulangan Pokok
4 D 10
= 4 x 3.45 x 11 x 0.617 = 93.585 Kg
Sengkang
No. Perhitungan / Uraian Pekerjaan
Ø 8 - 0.20
= 17 x 11 x 0.39456 = 73.783 Kg
Bekisting
= 0.15 x 3.2 x 2x 11 = 10.56 m2
= 0.15 x 3.2 x 2x 11 = 10.56 m2
21.12 m2
Tulangan Pokok
6 D 13
= 6 x 97.275 x 1.04189 = 608.096 Kg
Sengkang
Ø 8 - 0.2
= 486.375 x 0.395 = 191.904 Kg
Bekisting
= 0.4 x 97.275 x 2= 77.82 m2
= 0.2 x 97.275 x 1= 19.455 m2
97.275 m2
Tulangan Pokok
4 D 13
= 4 x 23.475 x 1.04189 = 97.833 Kg
Sengkang
Ø 8 - 0.2
= 117.375 x 0.395 = 46.311 Kg
Bekisting
= 0.3 x 23.475 x 2= 14.085 m2
= 0.2 x 23.475 x 1= 4.695 m2
18.78 m2
Besi D 8
Bott D 13 - 0.15
Y = 1.825 x 34.33333 = 62.6583 m'
X = 5 x 1.053155 = 5.26578 m'
Bott D 13 - 0.30
Y = 0 x 1 = 0 m'
No. Perhitungan / Uraian Pekerjaan
X = 0 x 1 = 0 m'
67.9241 m' x 0.3946 = 26.800 Kg
Besi D 8
Bott D 13 - 0.15
Y = 7.525 x 29.16667 = 219.479 m'
X = 4.225 x 51.16667 = 216.179 m'
Bott D 13 - 0.30
Y = 7.525 x 26.08333 = 196.277 m'
X = 4.225 x 26.08333 = 110.202 m'
742.138 m' x 0.3946 = 292.818 Kg
319.618 Kg
Bekisting
= 1.825 x 4.85 = 8.85125 m2
= 7.15 x 4.225 = 30.2088 m2
39.06 m2
V= 160.000 m2
V= 64.000 m'
V= 6.000 bln
V= 6.000 bln
V= 25.920 m3
V= 8.640 m3
V= 1.800 m3
V= 9.250 m3
V= 1.875 m3
V= 0.864 m3
V= 0.288 m3
V= 0.090 m3
V= 1.156 m3
V= 0.313 m3
V= 0.864 m3
Volume Ket
V= 0.288 m3
V= 0.090 m3
V= 1.156 m3
V= 0.313 m3
V= 2.592 m3
260.054 kg V= 260.054 Kg
V= 1.728 m3
V= 0.540 m3
V= 9.250 m3
= 578.246 Kg
= 182.484 Kg
= 74.000 m2
V= 1.875 m3
= 130.236 Kg
= 61.650 Kg
= 18.750 m2
= 1.260 m3
= 315.066 Kg
= 40.245 Kg
= 16.380 m2
= 6.247 m3
= 690.478 Kg
Volume Ket
= 161.553 Kg
= 93.708 m2
= 1.683 m3
= 183.163 Kg
= 57.310 Kg
= 28.050 m2
= 1.942 m3
= 225.787 Kg
= 178.558 Kg
= 51.786 m2
V= 8.788 m3
= 686.706 Kg
= 216.712 Kg
Volume Ket
= 109.850 m2
V= 1.689 m3
= 117.316 Kg
= 55.534 Kg
= 22.520 m2
= 22.345 m2
Volume Ket
= 1,375.199 Kg
= 171.885 m2
= 32.689 m2
Volume Ket
= 50.220 m2
= 261.099 m2
= 100.440 m2
= 522.197 m2
= 4.608 m3
= 517.608 Kg
= 120.735 Kg
= 69.120 m2
= 0.192 m3
= 21.567 Kg
= 6.708 Kg
= 3.200 m2
= 0.792 m3
= 93.585 Kg
Volume Ket
= 73.783 Kg
= 21.120 m2
V= 7.782 m3
= 608.096 Kg
= 191.904 Kg
= 97.275 m2
V= 1.409 m3
= 97.833 Kg
= 46.311 Kg
= 18.780 m2
Volume Ket
= 319.618 m2
= 39.060 m2
= 29.583 m2
= 272.574 m2
= 545.148 m2
Volume Ket
RENCANA ANGGARAN BIAYA
PEMBANGUNAN RUMAH
PAK YAHYA
JL. FLAMBOYAN - MEDAN
HARGA SATUAN
NO PEKERJAAN UNIT VOLUME MATERIAL
RP
A PEKERJAAN PENDAHULUAN
1 Pengukuran/ Bowplank m1 64.00
Jumlah
B LANTAI I
PEKERJAAN TANAH
1 Galian
1 Galian Pondasi (P1) m3 25.92
2 Galian Pondasi (P2) m3 8.64
3 Galian Pondasi (P3) m3 1.80
4 Galian Sloof (S1) m3 9.25
5 Galian Sloof (S2) m3 1.88
2 Pasir Urug
1 Pondasi (P1) m3 0.86
2 Pondasi (P2) m3 0.29
3 Pondasi (P3) m3 0.09
4 Sloof (S1) m3 1.16
5 Sloof (S2) m3 0.31
3 Lantai Kerja 1:3:5
1 Pondasi (P1) m3 0.86
2 Pondasi (P2) m3 0.29
3 Pondasi (P3) m3 0.09
4 Sloof (S1) m3 1.16
5 Sloof (S2) m3 0.31
2 P2
Beton K 225 m3 1.73
Besi D13 Kg 173.37
3 P3
Beton K 225 m3 0.54
Besi D13 Kg 60.43
D PEKERJAAN STRUKTUR
1 Pekerjaan Lantai
a. Pemadatan tanah Timbun + 60 cm m3 73.84
b. Rabat Lantai 1:3:5 m3 8.79
2 Sloff (S1)
a. Beton K 225 m3 9.25
b. Bekisting m2 74.00
c. Besi D 13 Kg 578.25
d. Besi Ø 8 mm Kg 182.48
3 Sloff (S2)
a. Beton K 225 m3 1.88
b. Bekisting m2 18.75
c. Besi D 13 Kg 130.24
d. Besi Ø 8 mm Kg 61.65
4 Pedestal (Pd)
a. Beton K 225 m3 1.26
b. Bekisting m2 16.38
c. Besi D 13 Kg 315.07
d. Besi Ø 8 mm Kg 40.25
5 Kolom (K1)
a. Beton K 225 m3 6.25
b. Bekisting m2 93.71
c. Besi D 13 Kg 690.48
d. Besi Ø 8 mm Kg 161.55
6 Kolom (K2)
a. Beton K 225 m3 1.68
b. Bekisting m2 28.05
c. Besi D 13 Kg 183.16
d. Besi Ø 8 mm Kg 57.31
8 Balok (B1)
a. Beton K 225 m3 8.79
b. Bekisting m2 109.85
c. Besi D 13 Kg 686.71
d. Besi Ø 8 mm Kg 216.71
7 Balok (B2)
a. Beton K 225 m3 1.69
b. Bekisting m2 22.52
c. Besi D 13 Kg 117.32
d. Besi Ø 8 mm Kg 55.53
E PEKERJAAN DINDING
1 Pasangan Dinding bata Transtram 1 : 3,Elev -0.6~+0.0 m2 50.22
2 Pasangan Dinding bata 1 : 4, Elev +0.0~+3.91 m2 261.10
3 Plesteran Dinding bata 1 : 4, Elev -0.6~+0.00 m2 100.44
4 Plesteran Dinding bata 1 : 4, Elev +0.0~+3.91 m2 522.20
J Pekerjaan cat
1 Pek. Cat Exterior (Ligth Gray) m2 122.866
2 Pek. Cat Exterior (Dark Gray) m2 4.240
3 Pek.Cat Interior (White) m2 371.00
4 Pek. Cat Plapon m2 161.04
5 Pek. Cat Kosen + Daun Pintu/Jendela m2 18.05
K PEKERJAAN SANITARI
1 Shower bh 1.00
2 Kran Air 1/2" bh 4.00
3 Kran Angsa 1/2" bh 1.00
4 Kloset Duduk bh 1.00
5 Kloset Jongkok bh 2.00
6 Kitchen Sink 2 Lubang + Acessoris bh 1.00
7 Floor Drain bh 5.00
L PEKERJAAN PLUMBING
1 Air Bersih
a. Instalasi Pipa Air Bersih AW Ø 3/4" m1 31.00
b. Instalasi Pipa Air Bersih AW Ø 1/2" m1 4.00
Jumlah
C LANTAI II
A PEKERJAAN STRUKTUR - LANTAI II
1 Kolom (K1)
a. Beton K 225 m3 4.61
b. Bekisting m2 69.12
c. Besi D 13 Kg 517.61
d. Besi Ø 8 mm Kg 120.74
2 Kolom (K2)
a. Beton K 225 m3 0.19
b. Bekisting m2 3.20
c. Besi D 13 Kg 21.57
d. Besi Ø 8 mm Kg 6.71
4 Balok (B1)
a. Beton K 225 m3 7.78
b. Bekisting m2 97.28
c. Besi D 13 Kg 608.10
d. Besi Ø 8 mm Kg 191.90
5 Balok (B2)
a. Beton K 225 m3 1.41
b. Bekisting m2 18.78
c. Besi D 13 Kg 97.83
d. Besi Ø 8 mm Kg 46.31
6 Cor Plat Lantai
a. Beton K 225 m3 4.13
b. Bekisting m2 30.21
c. Besi Ø 8 mm kg 319.62
B PEKERJAAN DINDING
1 Pasangan Dinding bata 1 : 4,Elev +3.91~+7.11 m2 272.57
3 Plesteran Dinding bata 1 : 4,Elev +3.91~+7.11 m2 545.15
H Pekerjaan cat
1 Pek. Cat Exterior (Ligth Gray) m2 131.00
2 Pek. Cat Exterior (Dark Gray) m2 3.180
3 Pek.Cat Interior m2 349.00
4 Pek. Plapon m2 155.84
5 Pek. Cat Kosen + Daun Pintu/Jendela m2 14.30
I PEKERJAAN SANITARI
1 Shower bh 2.00
2 Kran Air 1/2" bh 2.00
3 Kran Angsa 1/2" bh 1.00
4 Kloset Duduk bh 2.00
6 Kitchen Sink 2 Lubang + Acessoris bh 1.00
7 Floor Drain bh 6.00
J PEKERJAAN PLUMBING
1 Air Bersih
a. Instalasi Pipa Air Bersih AW Ø 3/4" m1 15.00
b. Instalasi Pipa Air Bersih AW Ø 1/2" m1 4.50
Jumlah
TOTAL
PAK YAHYA
PEMILIK
YA
RP RP RP RP