You are on page 1of 6
‘25/2018 CCAGIS Activity Report 100 W 4TH ST, CINC Print || Report Problem (|g Selected Activity Type: it Building Combo Permit 2 | | 2otepo1z04 © 2/6/2019 ‘New Residential 4th & Race |) 2017P03857 @si/2017 New Commercial 4th & Race - Garage Phase |, [ OPENASSUED Map | Details(2017P03857) | Owner Record ID: 2017P03857 Address: 100 W 4TH ST ' Permit Issued - 12/03/2018 Approvals Inspections —_ Conditions 5 - Erosion Control in Place - Not Approved (Required) 31712019, 3 AM Action: Comment Comments: Site visit. Gave contractor verbal warning about mud on the street. He immediately instructed bobcat operator to sweep the street. Inspector: ROWAGNER 20 - Soil Inspection - Not Approved (Required) «3 212212019 8:14:06 AM | | Action: Comment |_| Comments: Pirs ar progressing All micro pars are installed in accordance to plans cagismaps.hamiton-co.org/PropartyActly/cagisreport 16 + 1350018 CCAGIS Activity Report || Inspector: CCLARK 2111/2019 7:43:45 AM ‘Action: Comment | Comments: Meating with contractor for schedule of piers and inspections required. Inspector: CCLARK 2/8/2019 7:38:19 AM ‘Action: Partial Approval Comments: Micro piles are moving forward. Inspector: CCLARK 25 - Foundation steel placement - Not Approved (Required) é 10/29/2019 9:09:47 AM ‘Action: Partial Approval | Comments: Reinforcing steel in progress for next deck pour and swimming pool. Special inspector on site. Inspector: ROWAGNER 1078/2019 7:42:51 AM Acti Comments: Reinforcing steel in progress for next deck pour, 6th floor, south west. Special inspector on Inspector: ROWAGNER 10/7/2019 7:15:02 AM | Action: Partial Approval \: Partial Approval | | Comments: Reinforcing steel in place for slab pour, 6th floor, central south west area. Special inspector on site. | | | | Inspector: ROWAGNER 9/4/2019 9:33:34 AM ‘Action: Partial Approval ‘Comments: Site visit. Reinforcing steel in progress for next deck pour. Special inspector on site. Inspector: ROWAGNER Action: Partial Approval | Comments: Site visit. Reinforcing steel in progress for next deck pour. Special inspector on site | Inspector: ROWAGNER | 8/15/2019 3:05:17 PM Action: Partial Approval | | Comments: Site visit. Reinforcing steel in place for next deck pour, southwest quadrant of fourth floor deck. Special inspector on site. Inspector: ROWAGNER 7/9/2019 8:32:30 AM caglemaps.hamiton-co.org PropertyRethtyleageceport 216 = 1eero19 CAGIS Activity Report Action: Partial Approval | Comments: Site visit. Reinforcing steel in place for next deck pour, southwest quadrant of second floor deck. Special inspector on site. Inspector: ROWAGNER 6/5/2019 8:03:25 AM Action: Partial Approval Comments: Reinforcing steel in progress for second structural slab pour. Special inspector on site. Discuss night time permit with Site Superintendent. | Inspector: ROWAGNER 5/20/2019 7:44:25 AM Action: Partial Approval Comments: Reinforcing steel in progress for first structural slab pour, east elevation. Special inspector on site. Inspector: ROWAGNER | 4110/2019 10:01:30 AM. | Action: Partial Approval | Comments: Reinforcing see! in pace for new elevator pt lab, southwest, column ne KB. Special inspector onsite Inspector: ROWAGNER 41912019 2:45:55 PM Action: Partial Approval | | Comments: Walk site with job superintendent. Reinforcing steel in progress for pile caps and elevator cores. {| Inspector: ROWAGNER 3/7/2019 7:87:41 AM Action: Partial Approval Comments: Grade beam from comer of 4th and race to tower crane footing has steel installed per plans. | Inspector: CCLARK 27 - Foundation Anchors - No Actions (Required) gs 28 - Damproofing/water proofing - Not Approved (Required) «> 00 AM | | Action: Partial Approval | Comments: Installation of box culvert system is in progress. Special Inspector is on site. Inspector: ROWAGNER | 4 Framing Inspection - Not Approved (Required) @ 10/3/2019 1:35:37 PM | scon: Pat opel | Comments: Light gage metal stud framing continuing for exterior ish system, frst lor, south elevation far | west comer. cagiomapshamiton-co.orProperyActviyicagisrepart = 1resreo19 CAGES Actvty Report Inspector: ROWAGNER 9/10/2019 8:08:43 AM Action: Partial Approval Comments: Light gage metal stud framing continuing for exterior finish system, first floor, south elevation. Inspector: ROWAGNER 8/22/2019 7:03:25 AM ‘Action: Partial Approval Comments: Light gage metal stud framing in progress for EIFS system, first floor east elevation and southeast corner. Dane in compliance with approved construction documents. Inspector: ROWAGNER 5/9/2019 7:33:53 AM Action: Comment Comments: Site visit. Erection of scaffolding / work platform in progress on east side of building. Inspector: ROWAGNER 412212019 7:23:57 AM Action: Partial Approval Comments: Concrete forms being installed for next concrete pour on core #2 walls. Installation of re-bar progressing. Inspector: ROWAGNER 4116/2019 9:06:11 AM Action: Partial Approval Comments: Concrete pour in progress for core #2, Special inspector on site. Inspector: ROWAGNER 50 - Firestoping Inspection - No Actions (Required) & 351 - Piping Inspection - Not Approved (Required) ¢ 9 AM ‘Action: COMMENT Comments: Initiate hydro for underground suppression piping. Pressure at 200 PSI. Inspector: JURESSMAN 10/8/2019 7:11:59 AM Action: Partial Approval Comments: Initiate hydro for underground suppression piping. Pressure at 200 PSI. Inspector: ROWAGNER 10/7/2019 7:17:22 AM Action: Meeting ‘Comments: Met with underground suppression contractor. Go over requirements for hydro and flush, Inspector: ROWAGNER ‘cagismaps.hamiton-coorg/PropertyActvityleagiseport ~ 128019 CCAGIS Activity Report 900 - Final Grading Inspection - No Actions (Optional) Joyo 910 - Final Plumbing Inspection - No Actions (Required) ¢ 920 - Final HVAC Inspection - No Actions (Required) 930 - Final Elevator Inspection - No Actions (Required) 982 - MSD C of 0 Sign-off - No Actions (Required) 983 - CWW C of O Sign-off - No Actions (Required) & 990 - Final Permit Inspection - Not Approved (Required) 911012019 8:10:46 AM | Action: Comment Comments: Temporary standpipe construction is in progress. Inspector: ROWAGNER 8/19/2019 9:44:06 AM Action: Meeting ‘Comments: Met with Tumer staff, Joe Mundy, and Darryl Meadows. Discuss requirements for occupancy of garage, Inspector: ROWAGNER 11712019 2:34:10 PM Action: Comment Comments: Met with site superintendent regarding extension of night time construction permit due to wet weather conditions. Also discuss requirements for obtaining temporary c.o. for parking garage. inspector: ROWAGNER ‘Action: Meeting ‘Comments: Met with site superintendent regarding upcoming concrete deck pour. Pour has been pushed back | to Thursday 6/13/19. Inspector: ROWAGNER 4111/2019 8:55:38 AM Action: Meeting i Comments: Meet with Tumer staff and Supervisor Joe Mundy regarding night time construction permits. Inspector: ROWAGNER 1123/2019 10:23:31 AM Action: Comment ‘Comments: Demo of old foundation stil in progress. Inspector: ROWAGNER __ 991 - Conditions Inspection - No Actions (Required) es cagismaps,hamiton-o org PropertyActtyicagisreport ndsr2019 CAGIS Activity Report 999 - Supervisor Approval - No Actions (Required) «3 1001 - EXPIRED - Permit is expired - No Actions (Optional) cagismaps.hamiton-o.orgPropertyActvtyicagisreport 66

You might also like