Proposed Group Housing Project

At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Conceptual


Conceptual Plan)
Plan)

BRIEF SUMMARY OF THE PROJECT

ABOUT PROJECT

M/s. ATS Homes Pvt. Ltd. Proposed to set up a Group Housing Project at Plot No. – SC-01/01, Sector – 152,
Noida, Uttar Pradesh having Plot Area 14.287 ha. (1,42,879.51 sq. m.) and built up area 682938.39 sq. m.
As per the EIA notification, 14.09.2006 (Amended time to time), this project falls under Category ‘B’ and
Project or Activity 8 (a) [Building Construction Project].

SALIENT FEAT
FEATURES
ATURES OF THE PROJECT

Particulars
Project Name Proposed Group Housing Project
Location Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh
Type of project Building Construction Project
Total Project area 14.287 ha. (1,42,879.51 sq. m.)
Built up 682938.39 sq. m (F.A.R- 4,52,552.98 sq. m + Area Under Services – 60,011.98
sq. m + Basement Area- 101138.42 sq. m+ non-F.A.R. area – 69235.01 sq. m)
Ground coverage Permissible: 42,863.86 sq. m (30 % of plot area)
Proposed: 26,398.46 sq. m (18.47% of plot area)
F.A.R Permissible Permissible: 473662.36 sq. m.
F.A.R Proposed Proposed: 452552.98 sq. m. (Proposed F.A.R. for Commercial: 14650.00 sq.
m. + Proposed F.A.R. for Residential: 437902.98 sq. m.)
Maximum height Tower- 111 m.
Number of Towers 32 Tower + 1 Commercial Center
Number of floors 2 Basement + Stilt + Upper 36 Floor
Basement Area detail Particular Parking Area Service Area Total Area in sq. m
Basement 89314 sq.m. 11824.42 sq.m. 101138.42 sq.m.
Parking For Required Parking-
Parking- F.A.R/50
Commercial = 14650.00/50
= 293 Cars
Proposed Parking-
Parking-
Particular Area for Car Parking No. of Parking
Provided
Surface Parking (@ 25 m2/ECS) 2350 Sq.m. 94 Cars
Basement (@ 35 m2/ECS) 12322Sq.m. 457 Cars
Total 551 Cars

M/s ATS Homes Pvt. Ltd. 55 JM EnviroNet Pvt. Ltd.


Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Conceptual
Conceptual Plan)
Plan)

Parking For Residential Required Parking-


Parking- F.A.R/80
= 437902.98/80
= 5474 Cars
Proposed Parking-
Parking-
Particular Area for Car Parking No. of Parking
Provided
Surface Parking (@ 25 m2/ECS) 13550 Sq.m. 542 Cars
Stilt Parking (@ 30 m2/ECS) 76157 Sq.m. 2482 Cars
Lower Basement (@ 35 m2/ECS) 76992 Sq.m. 2803 Cars
Total 5827 Cars
Powe
Power req
require
uirement
ment &
Powe
Power req
require
uirement
ment : 15455.7 KW, Source:
Source Local grid supply of Noida, UP
sou
source
Power backup DG Sets of total capacity 12120 KVA (12x1010 KVA) shall be provided for
power back up in case of power failure.
Wate
Water req
require
uirement
ment & Water requirement will be 2258 KLD
sou
source Fresh water: 1050 KLD
Recycled Treated Water: 1208 KLD
Sewag
Sewage treat
treatment
ment & Sewag
Sewage treat
treatment
ment facility:
facility: STP of 1410 KLD capacity
dispos
disposal
osal Sewag
Sewage disch
discharge: No untreated sewage will be discharged outside the project site.
The sewage water will be treated and utilized for flushing; and Green area irrigation.
Effluent disch
discharge: No waste or treated water will be discharged outside the
project site, the project will be zero-discharge project as all the treated water
will be utilized with-in the project site.
Estimated
Estimated population
opulation Total population: 26388 Persons
Fixed population: 14408 persons
Floating population: 11980 persons
Solid waste generation 9478.60 kg/day
Green Area Green Area Provided – 48006.30 m2 (33.60 % of total plot area)
Con
Connectivity The project site is well connected to other parts of City through service roads.
Project Cost 850 Crore
WATER CONSUMPTION-
CONSUMPTION-

Water requirement during Construction Phase: Requirement of water during construction period will be 100
KLD (Approx.)

Water requirement during the operation phase:


phase The total water requirement of the project will be 2258
KLD. The fresh water required will be 1050 KLD; the recycled water demand will be 1208 KLD. The waste
water generated during the operation phase will be 885 KLD which will be treated in STP of capacity 1410

M/s ATS Homes Pvt. Ltd. 56 JM EnviroNet Pvt. Ltd.


Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Conceptual
Conceptual Plan)
Plan)

KLD and whole of the treated water available will be used for flushing, horticulture, HVAC/D.G. Cooling
and Road Washing etc.

WATER REQUIREMENT
REQUIREMENT CALCULATION
Base of
Type of Expected Fresh Treated Recycled Water Total Water
S. Calculation
Particulars Populatio Populatio Water (KLD) (KLD) Consumption
No. (KLD)
n n (KLD)
(KLD
Domestic Flushing Domestic Others Flushing Others

A. Water Requirement
Requirement for Commercial
Ground + First + Fixed 1111 15 30 16.66 - 33.33 - 49.99
1. Second Floor (Retail &
Common Area) Floating 2223 5 10 11.11 - 22.23 - 33.34
Ground + First + Fixed 67 15 30 1.00 - 2.01 - 3.01
2. Second Floor (Food
Court) Floating 600 21 49 12.60 - 29.40 - 42.00

3. Gardening - - LSM - - - 25.00 25.00

4. HVAC/D.G. Cooling - - LSM - - - 25.00 25.00

5. Road Washing - - LSM - - - 5.00 5.00

Sub Total - 4001 - 41.37 - 86.97 55.00 183.35

B. Water Requirement for Group Housing


Residential Towers
(Tower-1 to Tower- Fixed 13230 65 21 859.95 - 277.83 - 1137.78
32) @ 5
6.
Person/Dwelling Unit
[Dwelling Floating 1323 5 10 6.61 - 13.23 - 19.84
Units=2646]
7. Club (1+2 +3) - 5001 15 30 75.01 - 150.03 - 225.04

8. Commercial - 2833 5 10 14.16 - 28.33 - 42.49


Nursing Home +
9. - - - - - 27.50 - 7.50 35.00
Crèche/Nursery
10. Horticultures - - LSM - - - 569.65 569.65
Water
11. - - LSM - 25.00 - - 25.00
body/Swimming Pool
12. Road Washing - - LSM - - - 20.00 20.00
Sub Total - 22387 - 955.73
955.73 52.50 469.42 597.15 2074.80
997.10 52.50 556.39 652.15
26388 KLD say KLD say KLD say KLD say 2258.15 KLD
Grand Total - - 997 KLD 53 KLD 556 KLD 652 KLD say
Persons
1050 KLD 1208 KLD 2258 KLD

M/s ATS Homes Pvt. Ltd. 57 JM EnviroNet Pvt. Ltd.


Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Conceptual
Conceptual Plan)
Plan)

WATER BALANCE FLOW CHART

WATER REQUIREMENT

TOTAL
OTAL WATER REQUIREMENT (FRESH 1050 KLD + RECYCLED1208
RECYCLED1208 KLD) 2258 KLD
TOTAL FRESH WATER REQUIREMENT 1050 KLD
FRESH DOMESTIC WATER REQUIREMENT 997 KLD
WATER REQUIRED FOR GREEN AREA DEVELOPMENT 595 KLD
TOTAL WASTE WATER GENERATION 885 KLD
TREATED WATER RECOVER FROM STP 796 KLD
RAIN WATER HARVESTING
The rainwater collected from the rooftop and other paved areas within the project area will be
conveyed into to the rainwater harvesting system consisting of de-silting-cum-filter Chamber, Oil &
Grease Separators and Boreholes for recharge into the groundwater. Rainwater harvesting plan is as
per the design approved in the manual issued by the GOI.

RAIN WATER HARVESTING CALCULATION

Catchment's Area Run Intensity


Total
S. Type of off of Discharge (Run Off)
(m3/hr)
No. Surface Coeff. Rainfall [Q=10CIA] m3/hr
sq. m Ha. [Q]
[C] (mm/hr)
1 Building (Terrace)
(a) Area 26398.46 2.639846 0.50 35 10X0.50X35X2.639846 461.97

M/s ATS Homes Pvt. Ltd. 58 JM EnviroNet Pvt. Ltd.


Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Conceptual
Conceptual Plan)
Plan)

2 Paved Surface / Road Surface


(a) Area 21503.50 2.150350 0.65 35 10X0.65X35X2.150350 489.20
3 Natural Ground & Greens Area
(a) Area 94942.22 9.494222 0.15 35 10X0.15X35X9.494222 498.44
1449.6
Grand Total ( 1+2+3) say
1450

VOLUME OF STORM WATER DRAINAGE


Considering 15 min (0.250 Hr) Retention Period
Volume Required = 1450 X 0.250
Volume = 362.50 say 363 cu. m.

VOLUME OF 1 RAINWATER HARVESTING PIT WITH DIAMETER- 2.90 M & DEAPTH – 1.90 M
= πr2 h
= 3.14 X 1.45 X 1.45 X 1.90
= 12.54 SAY 13
TOTAL NO. OF RAINWATER HARVESTING PIT
= 363 /13
= 27.92 Number SAY
= 28 Number
As per calculation the total 28 no. of RWH pits required and we are providing 35 no of RWH pits.
PARKING NEEDS-
NEEDS- There will be the sufficient parking space for the vehicles. The provision of
parking space will be as per the Norms. The parking provision will be made at basements and open
surface. We are providing total 5474 ECS.
PARKING DETAIL
Required Parking for Commercial - F.A.R/50
= 14650.00/50
= 293 Cars
Required Parking for Residential - F.A.R/80
= 437902.98/80
= 5474 Cars

Total Required Parking = 293 + 5474 = 5765 ECS


Proposed Parking for Commercial-
Commercial-
Particular Area for Car No. of Parking
Parking Provided
Surface Parking (@ 25
2350 Sq.m. 94 Cars
m2/ECS)

M/s ATS Homes Pvt. Ltd. 59 JM EnviroNet Pvt. Ltd.


Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Conceptual
Conceptual Plan)
Plan)

Basement (@ 35
12322Sq.m. 457 Cars
m2/ECS)
Total 551 Cars
Proposed Parking for Residential-
Residential-
Particular Area for Car No. of Parking
Parking Provided
Surface Parking (@ 25
13550 Sq.m. 542 Cars
m2/ECS)
Stilt Parking (@ 30
76157 Sq.m. 2482 Cars
m2/ECS)
Lower Basement (@
76992 Sq.m. 2803 Cars
35 m2/ECS)
Total 5827 Cars
As per calculation the total no. of parking required comes out to be 5474 ECS and we are providing
5827 ECS.
********