You are on page 1of 1

Unit 7, San-Ei Trading Building, Diversion Project Title: LIGHTMORE TRADING - WIRE GUTTER Date: NOVEMBER 25, 2019

Road, Ma-a, Davao City 8000 Project Address: Checked by: Engr. Cecelio M. Dunton
Tel: +63 (082) - 287 - 8205 Scale: NTS Project Head Approval: Engr. Arnold S. Jondit
Mail: info@tscaelectrical.com Revision: Drawn by: Engr. William Crisanto Donayre
www.tscaelectrical.com

Notes:
1. ALL UNITS ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. PAINT & COLOR: POWDER COATED WRINKLED GRAY.
3. MATERIAL: G.I SHEET 1.6mm Thk (GAUGE 16)
CONCEALED HINGE/ KEYED PUSH LOCK/ RUBBER
GASKET/ SIDES ARE BENDED AND FULL WELDED.

PROVISION FOR PADLOCK

600 600

300
300

300 300 300 300

FRONT VIEW WITHOUT COVER FRONT VIEW


600
250

SIDE VIEW

You might also like