You are on page 1of 69

MULTI 11th Floor Clipp Center CTRL No.

PF-3309
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 601
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2070mm x 896mm (SWING: RH) -For Vanity
2 1 set T5 - 2090mm x 1096mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 794mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3310
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 602
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2073mm x 898mm (SWING: LH) -For Vanity
2 1 set T5 - 2095mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2077mm x 797mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3311
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 603
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2070mm x 894mm (SWING: LH) -For Vanity
2 1 set T5 - 2090mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 799mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3312
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 604
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2068mm x 896mm (SWING: RH) -For Vanity
2 1 set T5 - 2083mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2065mm x 797mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3313
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 605
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2075mm x 894mm (SWING: RH) -For Vanity
2 1 set T5 - 2094mm x 1097mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2060mm x 796mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3314
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 606
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2070mm x 898mm (SWING: LH) -For Vanity
2 1 set T5 - 2090mm x 1099mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2090mm x 1099mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3315
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 607
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2070mm x 898mm (SWING: LH) -For Vanity
2 1 set T5 - 2088mm x 1097mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2062mm x 796mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3316
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 608
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2070mm x 894mm (SWING: RH) -For Vanity
2 1 set T5 - 2088mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2072mm x 794mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3317
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 609
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2065mm x 899mm (SWING: RH) -For Vanity
2 1 set T5 - 2090mm x 1097mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 797mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3318
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 610
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2075mm x 894mm (SWING: LH) -For Vanity
2 1 set T5 - 2090mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 794mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3319
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 611
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2072mm x 894mm (SWING: RH) -For Vanity
2 1 set T5 - 2090mm x 1099mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2072mm x 794mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3320
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 612
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2073mm x 899mm (SWING: RH) -For Vanity
2 1 set T5 - 2095mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 794mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-33021
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 613
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2072mm x 899mm (SWING: LH) -For Vanity
2 1 set T5 - 2095mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 802mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3322
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 614
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2072mm x 899mm (SWING: LH) -For Vanity
2 1 set T5 - 2097mm x 1097mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2072mm x 798mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3323
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 615
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2075mm x 899mm (SWING: RH) -For Vanity
2 1 set T5 - 2092mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 796mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3324
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 616
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2077mm x 899mm (SWING: RH) -For Vanity
2 1 set T5 - 2095mm x 1096mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2073mm x 794mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3325
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 617
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2082mm x 896mm (SWING: LH) -For Vanity
2 1 set T5 - 2092mm x 1096mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2075mm x 794mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3326
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 618
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2070mm x 899mm (SWING: LH) -For Vanity
2 1 set T5 - 2087mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 799mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3327
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 619
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2068mm x 897mm (SWING: RH) -For Vanity
2 1 set T5 - 2088mm x 1099mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2065mm x 801mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3328
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 620
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2065mm x 894mm (SWING: LH) -For Vanity
2 1 set T5 - 2085mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2063mm x 798mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3329
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 621
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2074mm x 896mm (SWING: RH) -For Vanity
2 1 set T5 - 2092mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2076mm x 794mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3330
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 622
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2078mm x 899mm (SWING: RH) -For Vanity
2 1 set T5 - 2093mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2075mm x 796mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3331
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 623
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2074mm x 894mm (SWING: LH) -For Vanity
2 1 set T5 - 2093mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2075mm x 799mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3332
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 624
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2070mm x 894mm (SWING: LH) -For Vanity
2 1 set T5 - 2090mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 803mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3333
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 625
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2070mm x 898mm (SWING: RH) -For Vanity
2 1 set T5 - 2090mm x 1100mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 794mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3334
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 626
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2064mm x 897mm (SWING: RH) -For Vanity
2 1 set T5 - 2090mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2073mm x 794mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3335
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 627
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2072mm x 896mm (SWING: LH) -For Vanity
2 1 set T5 - 2093mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2073mm x 794mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3336
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 628
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2075mm x 894mm (SWING: LH) -For Vanity
2 1 set T5 - 2095mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2075mm x 795mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3337
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 629
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2067mm x 894mm (SWING: RH) -For Vanity
2 1 set T5 - 2095mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2075mm x 800mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3338
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 630
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2076mm x 896mm (SWING: RH) -For Vanity
2 1 set T5 - 2097mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2078mm x 794mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3339
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 631
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2073mm x 894mm (SWING: LH) -For Vanity
2 1 set T5 - 2090mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 794mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3340
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 632
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2070mm x 899mm (SWING: RH) -For Vanity
2 1 set T5 - 2095mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2072mm x 807mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3341
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 633
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2075mm x 894mm (SWING: LH) -For Vanity
2 1 set T5 - 2090mm x 1099mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2075mm x 794mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3342
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 6
BASED ON ACTUAL SITE DIMENSION ROOM 634
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2072mm x 900mm (SWING: LH) -For Vanity
2 1 set T5 - 2092mm x 1098mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2078mm x 799mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: December 16, 2021 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 13, 2022 Finishes:
Others, Specify:

Prepared by: Engr. Trina C. Serrano Received By:


Date/Time: December 16, 2021 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3346
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 701
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2222mm x 900mm (SWING: RH) -For Vanity
2 1 set T5 - 2094mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2077mm x 774mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3347
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 702
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2075mm x 899mm (SWING: LH) -For Vanity
2 1 set T5 - 2099mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 769mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3348
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 703
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2075mm x 899mm (SWING: LH) -For Vanity
2 1 set T5 - 2094mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2075mm x 769mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3349
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 704
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2069mm x 899mm (SWING: RH) -For Vanity
2 1 set T5 - 2094mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 769mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3350
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 705
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2077mm x 899mm (SWING: RH) -For Vanity
2 1 set T5 - 2104mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2075mm x 772mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3351
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 706
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2080mm x 894mm (SWING: LH) -For Vanity
2 1 set T5 - 2099mm x 1099mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2075mm x 759mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3352
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 707
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2070mm x 894mm (SWING: LH) -For Vanity
2 1 set T5 - 2099mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2067mm x 764mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3353
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 708
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2068mm x 899mm (SWING: RH) -For Vanity
2 1 set T5 - 2094mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2068mm x 769mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3354
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 709
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2075mm x 894mm (SWING: RH) -For Vanity
2 1 set T5 - 2099mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2075mm x 754mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3355
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 710
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2075mm x 894mm (SWING: LH) -For Vanity
2 1 set T5 - 2094mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2073mm x 769mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3356
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 711
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2073mm x 894mm (SWING: RH) -For Vanity
2 1 set T5 - 2094mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2072mm x 764mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3357
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 712
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2076mm x 899mm (SWING: RH) -For Vanity
2 1 set T5 - 2099mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2075mm x 764mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3358
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 713
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2075mm x 894mm (SWING: LH) -For Vanity
2 1 set T5 - 2094mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 769mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3359
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 714
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2067mm x 894mm (SWING: LH) -For Vanity
2 1 set T5 - 2094mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 769mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3360
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 715
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2070mm x 894mm (SWING: RH) -For Vanity
2 1 set T5 - 2089mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 769mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3361
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 716
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2070mm x 894mm (SWING: RH) -For Vanity
2 1 set T5 - 2096mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 759mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3362
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 717
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2070mm x 894mm (SWING: LH) -For Vanity
2 1 set T5 - 2094mm x 1097mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 764mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3363
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 718
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2070mm x 894mm (SWING: LH) -For Vanity
2 1 set T5 - 2094mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 769mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3364
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 719
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2072mm x 894mm (SWING: RH) -For Vanity
2 1 set T5 - 2094mm x 1097mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 767mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3365
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 720
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2073mm x 894mm (SWING: LH) -For Vanity
2 1 set T5 - 2094mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2073mm x 769mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3366
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 721
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2075mm x 894mm (SWING: RH) -For Vanity
2 1 set T5 - 2094mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2075mm x 770mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3367
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 722
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2075mm x 894mm (SWING: RH) -For Vanity
2 1 set T5 - 2096mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2075mm x 764mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3368
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 723
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2073mm x 894mm (SWING: LH) -For Vanity
2 1 set T5 - 2094mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 769mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3369
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 724
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2070mm x 899mm (SWING: LH) -For Vanity
2 1 set T5 - 2094mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2078mm x 769mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3370
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 725
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2075mm x 892mm (SWING: RH) -For Vanity
2 1 set T5 - 2094mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 764mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3371
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 726
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2070mm x 894mm (SWING: RH) -For Vanity
2 1 set T5 - 2094mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 764mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3372
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 727
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2067mm x 894mm (SWING: LH) -For Vanity
2 1 set T5 - 2094mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2097mm x 764mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3373
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 728
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2070mm x 896mm (SWING: LH) -For Vanity
2 1 set T5 - 2094mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2073mm x 764mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3374
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 729
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2070mm x 894mm (SWING: RH) -For Vanity
2 1 set T5 - 2094mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2067mm x 774mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3375
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 730
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2070mm x 894mm (SWING: RH) -For Vanity
2 1 set T5 - 2099mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 764mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3376
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 731
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2070mm x 894mm (SWING: LH) -For Vanity
2 1 set T5 - 2094mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 764mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3377
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 732
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2077mm x 894mm (SWING: RH) -For Vanity
2 1 set T5 - 2099mm x 1099mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2080mm x 761mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3378
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 733
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2075mm x 894mm (SWING: LH) -For Vanity
2 1 set T5 - 2099mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 769mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3379
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 734
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2075mm x 894mm (SWING: LH) -For Vanity
2 1 set T5 - 2099mm x 1094mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 759mm (SWING: RH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time:
MULTI 11th Floor Clipp Center CTRL No. PF-3380
DEVELOPMENT AND 11th Avenue cor. 39th Street
CONSTRUCTION Fort Bonifacio Global City, Taguig
CORPORATION
WORK ORDER
ITEM # QTY UNIT ITEM CODE / DESCRIPTION REMARKS
PAINTING AND RESIZING OF OSCI DOORS IN DUCCO FINISH, COLOR: SUGAR DUST SEMI-GLOSS FINISH NOTE: For Hotel Level 7
BASED ON ACTUAL SITE DIMENSION ROOM 735
(NOTE: PROCEED ON BORING OF HOLE LOCKSET AND CUT OUT FOR HINGES ON T2 & T6)
(NOTE: PROCEED CUT OUT FOR THE HINGES FOR T5)
1 1 pc T2 - 2075mm x 894mm (SWING: RH) -For Vanity
2 1 set T5 - 2099mm x 1099mm double door (SWING-OUT) -For Walk-In-Closet
3 1 pc T6 - 2070mm x 769mm (SWING: LH) -For Toilet
ATTACHMENTS:
1. Approved material under SUT
RIR-MDCC-SUT-H089B
2. Picture of Lockset and Hinge
3. Keyplan
4. W.O checklist
Engineering's Evaluation

Requested Date: January 14, 2022 Attachment/Drawing: (Checklist)

Requested By:
Engr. John Rae V. Pascual Key Plan:
E-mail Address:
john.pascual@mdcc.com.ph Floor Plan:
Mobile No. :
09279214821 Elevation Plan:
Project Title:
ROYCE WP2 Plan Details:
Area/Location:
HOTEL LEVEL 6 CAD File:
Due Date: January 31, 2022 Finishes:
Others, Specify:

Prepared by: Engr. John Rae V. Pascual Received By:


Date/Time: January 14, 2022 Date/Time: