Professional Documents
Culture Documents
NO KEBERTERIMAAN
ITEM PEKERJAAN DAN SUB ITEM
ITEM
PEKERJAAN
PEK. BAHAN PRO
b)
(4) Construction 1)
a)
b)
c)
d)
b)
c)
-
-
b)
c)
d)
e)
f)
g)
h)
2)
3)
4)
(3) Construction
4.06 RAILWAY SWITCHES
(2) Materials 1)
a)
b)
2)
3)
-
-
(4) Construction
(3) Construction
a)
b)
c)
(4) Construction
a)
b)
c)
d)
e)
f)
g)
(4) Construction
(3) Construction 1)
2)
a)
b)
a)
b)
c)
d)
e)
f)
(4) Construction
2)
a)
b)
c)
d)
Diperiksa oleh:
NO BAGIAN PARAF
1 SOM/GSP
2 SPLEM
3 SCARM
4 SQHSEM
5 QHSE MANAGER BU
oject (I), Package A
Concrete Sleepers
Fastenings
Item Name
Concrete Sleeper R 54
Fastening for Concrete Sleeper
Rail R54
New rail shall be manufactured from steel ingots or
continuous casting blooms (hereinafter referred to
as C.C. blooms) made either by basic open hearth,
electric, or basic Bessemer process or basic oxygen
converter.
Chemical composition shall be as follows:
Rail Joint
Chemical Composition
AASHTO-T-96
Any track irregularities at unloaded
Horizontal and vertical alignment of track shall be conditions shall be within the following
as shown on the Contractor's track layout drawings tolerances:
as approved by the Engineer. All tamping work and
track realignment by raising and shifting works shall
be based on the staking marks established by this
Specification. Ballast shall be well packed with
Multiple Tie Tamper (MTT) or equipment
approved by the Engineer as final tamping works
after regular train operation. The Contractor shall
trim the ballast to conform to the standard ballast
section shown on the Drawings or instructed by the
Engineer.
Rail shall be used rails salvaged from the site and
arranged by the Contractor. Concrete and wooden
sleepers, together with fastening and rail joints,
shall be used sleepers salvaged from the site and
arranged by the Contractor. Quantity necessary and
required for buffer stock works shall be the
responsibility of the Contractor. Assembling parts
shall be fabricated from locally available materials.
Type of buffer stops shall be as follows:
Item Name
Level Crossing Ballast Supporter
Temporary Level crossing
Item name
Track Panel Removal
Scissor Crossing Removal
Double Slip Switch Removal
Ballast Removal
Disetujui oleh,
Project Manager
Fo
R
N TES
Halaman
: 1 dari 1
NO KEBERTERIMAAN RINCIAN DOKUMEN INSPEKSI & TES KEBERTERIMAAN KODE INSPEKSI & TES
ITEM PEKERJAAN DAN SUB ITEM TOLERANSI KEBERTERIMAAN
ITEM SUMBER DOKUMEN YANG DIGUNAKAN
PEKERJAAN BAHAN
PEK. PERSYARATAN MUTU
BAHAN PRODUK BAHAN PRODUK I T W H D
A PEKERJAAN STRUKTUR
1 Pekerjaan wash boring a. Beton a. Dimensi pengeboran : Ø 80 cm a. Beton a. Trial mix dan jobmix design beton a. Cek dimensi pengeboran v v v v v a. Berita acara trialmix beton
1) Mutu Beton : fc’ 30 MPa (K-350) b. Kedalaman bor : ± 23 m dibawah peil ± - Slump beton 14-16 cm b. Cek mutu & slump beton b. Cek kedalaman pengeboran b. Berita acara tes besi beton
0.00
2) Portland cement : type I b. Besi Beton (uk mm) c. Kuat tekan benda uji beton c. Pencatatan bor log c. Form approval material
3) Pengambilan sample tiap 40 m3 Berdasarkan SNI 07-2052-2002 d. Cek type bentonite sesuai approval d. Cor beton sesuai level yang d. Form bor log
ditentukan
4) Tiap 1 set diambil 4 bh - Dia 6 → ± 0,3 mm e. Tes kuat tarik dan tekuk besi beton e. IMTP beton-01 sd 04
RKS Struktur Pasal 2
5) Tes kuat tekan umur 7 hr = 1bh, 14 hr = 1bh dan 28 hal 9 s/d 28
- Dia 8 ≤ d ≤ 14 → ± 0,4 mm f. Cek diameter besi dengan stigmate e. Tes axial load f. Form inspeksi & tes PROD-51
hr = 2 bh Cek jumlah besi sesuai surat jalan
- Dia 16 ≤ d ≤ 25 → ± 0,5 mm g. g. Berita acara tes axial load
b. Bentonite ex SIKA, FOSROC, setara - Dia 28 ≤ d ≤ 34 → ± 0,6 mm h. Cek nama suplier sesuai approval i. Instruksi Kerja (metode kerja)
c. Besi beton - Dia d > 36 → ± 0,8 mm j. Shop drawing yang sudah disetujui
1) Besi ulir BJTD 40 untuk diameter ≥ 10 mm
2) Besi polos BJTP 24 untuk diameter < 10 mm
B PEKERJAAN ARSITEKTUR
1 Pasangan dinding a. Bata ringan uk 60x10x20 cm ex hebel, primacon atau a. Ketinggian pemasangan bata ringan a. Bata ringan a. Cek ukuran bata ringan & jumlahnya a. Cek ketinggian pemasangan v v a. Form approval material
setara dalam 1 hari = 1,5 m - Ukuran dimensi → 2-3 mm b. Cek nama bahan sesuai approval b. Cek pengecoran kolom praktis b. Form inspeksi & tes PROD-51
b. Perekat bata ringan ex MU, drymix atau setara b. Kolom praktis harus sudah dicor c. Cek kondisi mortar belum mengeras c. Cek kondisi plesteran c. Instruksi Kerja (metode kerja)
c. Plesteran ex MU, drymix atau setara sebelum dilanjutkan penambahan d. Cek kerataan vertikality d. Shop drawing yang sudah disetujui
pemasangan bata ringan RKS Struktur Pasal 7
d. Acian ex MU, drymix atau setara hal 21 s/d 27 e. Cek adanya retak rambut acian
c. Ring balk dan kolom praktis dipasang
dengan luasan dinding tiap 25 m²
d. Pasangan dinding bata harus tegak lurus
setelah diplester
e. Acian dilakukan setelah plesteran kering
sehingga tidak terjadi retak rambu
setelah selesai diaci