Professional Documents
Culture Documents
CS6052
CS6052
Campus[psmd01]Samundri
miansufyan106@gmail.com
► set the price point for a software product based on development effort
► Risk monitoring
WWW.VIRTUALINSPIRE.COM
Prepared byDil-E-Nadan
Campus[psmd01]Samundri
miansufyan106@gmail.com
► Continuous
►True
►False
►True
►False
►True
►False
►Product Upgrade
►Defect Removal
►Product Performance
►
WWW.VIRTUALINSPIRE.COM
Prepared byDil-E-Nadan
Campus[psmd01]Samundri
miansufyan106@gmail.com
►
►Schedule Product
►Defective Product
► True
► False
► Perceived quality
WWW.VIRTUALINSPIRE.COM
Prepared byDil-E-Nadan
Campus[psmd01]Samundri
miansufyan106@gmail.com
► True
► False
► true
► false
► Spiral model
► Waterfall model
WWW.VIRTUALINSPIRE.COM
Prepared byDil-E-Nadan
Campus[psmd01]Samundri
miansufyan106@gmail.com
► the best approach to use for projects with large development teams.
WWW.VIRTUALINSPIRE.COM
Prepared byDil-E-Nadan
Campus[psmd01]Samundri
miansufyan106@gmail.com
Cs605
1. Do you think that a long parameter list of a function/method, can be a “bad smell”? Give
reason for your answer.
2. Why prototyping is used in modeling the change in business processes before making it
part of the new system?
3. Name two techniques that can be used to schedule the project once the task network is
defined.
5.
A chat messenger is realeased and its version is 1.0.0 .it only posses chat functionality now.
after 1 year there are different major features are added lilke audio/video calls, files sharing and
data sharing. now what version number this chat messenger posses?
6.
WWW.VIRTUALINSPIRE.COM
Prepared byDil-E-Nadan
Campus[psmd01]Samundri
miansufyan106@gmail.com
7.
Ans:
Formula
Cmentainence = [P3-(P1 + P2)] * L
Cmentainence= 150000 * 4
Cmentainence = 600000
WWW.VIRTUALINSPIRE.COM
Prepared byDil-E-Nadan
Campus[psmd01]Samundri
miansufyan106@gmail.com
Do you think that a long parameter list of a function/method, can be a “bad smell”? Give
reason for your answer.
Why prototyping is used in modeling the change in business processes before making it
part of the new system?
Name two techniques that can be used to schedule the project once the task network is
defined.
Suppose for a certain project Preliminary design generated 12 defects which were passed on to
detailed design. Now at detailed design phase, 6 defects were passed on to the next stage and 6
were amplified at a ratio of 1:1.5. In addition, there were 20 new defects introduced at this
(detailed design) stage. Calculate how many defects were passed to next stage by detailed design
stage?
1. Why prototyping is used in modeling the change in business processes before making it
part of the new system?
5 marks
1. Why prototyping is used in modeling the change in business processes before making it
part of the new system?
Mcqs were 30percent from new updated moaz file my ppr today 4/3/2017 remember in prayer
WWW.VIRTUALINSPIRE.COM