ELECTRICITY

GENERATION FROM
LANDFILL GAS
Project funding options
Feasibility studies
Pumping trials
Complete project design
Manufacture, install and commission
Operation and maintenance

DATA SHEET ODSG06


PROJECT ROUTE PRE-REQUISITES well as the hydrogeological regime in a
site may make a signicant difference
DESK STUDY TO EVALUATE The utilisation of landll gas for
to the overall project viability.
electricity generation is an established
POTENTIAL FOR
commercial activity. The days of risk
ELECTRICITY GENERATION If, for example, the site is ooded,
assessment and uncertainty have long
it may be necessary to allow for a
since passed. The technology involved
FIELD DATA COLLECTION TO full leachate extraction and treatment
may be applied with certainty.
system prior to being able to access
DETERMINE FACTORS THAT
the landll gas. The extent and cost of
WILL IMPACT UPON In the late 1980s it was not unknown
such an option must be assessed before
VIABILITY for a banker to require that a full
the project progresses to a pumping
gas extraction system be installed and
trial.
PUMPING TRIALS TO operated for one or two years before
DETERMINE EQUILIBRIUM it could be accepted that there was
A desk study would feed relevant
PRODUCTION RATE OF adequate gas for a commercially viable
information into a mathematical
LANDFILL GAS project.
model. The mathematical model,
showing the future prole of gas
DECIDE UPON CAPACITY FOR Today the technology and
production is a key tool in determining
POWER STATION understanding has advanced to the
the capacity of a given landll site
point where a desk study followed
SYSTEM DESIGN INCLUDING by a pumping trial, carried out by
With a good desk study it is possible to
GAS EXTRACTION SYSTEM, a suitably qualied, experienced and
establish to some degree of accuracy
GAS TREATMENT (IF competent company, is adequate. It is
the potential for landll gas utilisation.
REQUIRED), ENGINE LOCA- now recognised that one or two years
Further project establishment activities
TIONS AND ELECTRICAL CON- of full extraction is a signicant waste
would then be aimed at conrming this
NECTION of a valuable asset.
position, rather than discovering new
information.
ESTABLISH THAT FINANCE IS In landll gas engineering, experience
IN PLACE AND ADEQUATE is of paramount importance. Every site
FIELD DATA COLLECTION
FOR THE FULL PROJECT is different and every site has its own
IMPLEMENTATION pitfalls. Much can be learned from an on-the-
ground study of a landll. Aspects such
PROCURE COMPONENT DESK STUDIES as the best route to power lines and
PARTS OF THE PROJECT the fall of the land are important in
A good desk study will establish very
deciding not only feasibility but also
clearly the scale of the opportunity
CONSTRUCTION AND the optimum use of technology.
involved.
COMMISSIONING
It is also important to have some
It is necessary, as a minimum, to
OPERATION AND understanding of the options for
know approximately the quantities of
MAINTENANCE locating the power plant itself. These
waste in place and the tipping history
may be as much operational as
of the site. The type of waste and
geographic.
its approximate composition is also
important.
An experienced designer and generator
will immediately pick up those aspects
Other factors, such as the extent and
that will need to be addressed in
quality of the capping employed, as
formulating a plan of action.
PUMPING TRIALS As the graph at the foot of this column KEY FEATURES
shows, a curve may be tted with up
A pumping trial is an advisable adjunct
to 3.5 MW maximum at the appropri-
to a desk study. This will ensure
ate time, or in the “play-safe” mode, PROVEN EXPERIENCE IN
that no unexpected conditions are
this may be reduced to 2 or 3 MW. POWER GENERATION FROM
encountered farther into the project.
LANDFILL GAS OVER MORE
There is nothing worse for a developer
Being able to produce the maximum THAN 15 YEARS
than to discover that the gas prole
commercial return from a given
envisaged by the desk study was
situation requires a thorough EQUIPMENT PROVIDING
actually incorrect.
understanding of the parameters MORE THAN 95%
involved and the realistic options that AVAILABILITY FOR COMPLETE
It has been noted, for example, that
are available. FACILITIES AND 99% FOR GAS
in certain localities around the world
PUMPING AND PROCESSING
SYSTEM DESIGN
EQUIPMENT
As an understanding of the market
and the needs of its customers have TURNKEY DESIGN,
developed, so the main engine suppliers MANUFACTURE AND
have progressively improved the quality INSTALLATION SERVICES
of the t between their product and AVAILABLE OR COMPONENT
market demand. SUPPLY ONLY

There are, therefore, no hard and fast FINANCE AVAILABLE


rules about how a new system should THROUGH AFFILIATED
be designed. Advantage should be COMPANIES
taken of every commercial opportunity
available. OPERATION AND
MAINTENANCE SERVICES
Being at the forefront of this PROVIDED
technological development has allowed
Organics to offer the most appropriate A ONE STOP SOLUTION FOR A
solutions based upon the latest COMPLETE SERVICE
developments. RELATING TO THE
EXPLOITATION OF LANDFILL
GAS AS A COMMERCIAL
RESOURCE

waste is burned in-situ in the landll,


both during and after tipping. Where
this has occurred on a large-scale over
a signicant period of time the result
may be that the actual organic content
of the waste is at variance with that
derived from the tipping history.

A pumping trial establishes the current


equilibrium gas production rate at
specic locations around a landll site.
From this information it is possible to
conrm the accuracy of the production
prole determined by a mathematical
model.

CAPACITY DETERMINATION
This is an important decision gate for
any project. There is a temptation to
consider that as landll gas is “free” it
is not important. However, it is clear
that any investment should be made to
work to the maximum that is available,
without taking undue risks.

A power generation facility may be


sized to take the full duty out of a gas
production curve or it may be set up to
play safe and avoid risk.
DATA SHEET ODSG06

GAS EXTRACTION select the source of nance most suited the staff of Organics. This provides a
to the needs of any one particular thorough grounding for the team to
Gas extraction from landll sites is
situation. be able to select the best equipment
a critical element of a good landll
congurations, to design with an
gas utilisation system. If well
PROCUREMENT awareness of the issues involved and to
designed, it will allow tight control
monitor fabrication quality to ensure
of the equilibrium gas production, As a nal lead-in to the actual
that quality failures do not obstruct
ensuring stable operation for the implementation of the project, the
project performance.
duration of the project. procurement cycles will begin. There
are several elements of the project
OPERATION AND MAINTENANCE
The specialised ow-control valve which must be timed to arrive when
commonly employed by Organics required.
The nal, and by no means least
will permit wellhead calibration
important, element in attaining a viable
by means of gas quality and ow A common delay, and surprisingly
outcome is to maintain and operate
rate; ow rate being adjustable to a mostly unexpected one, is the
installed systems in an optimum
approximately 1 Nm3/hr. By use of establishment of an electricity export
manner. As with all commercial
this system operators have been connection. As with many other aspects
activities there is a point at which
able to nely balance systems to of this type of project, each situation
every additional element of revenue
allow higher productivity on the has its unique sensitivities. It is
goes straight to the bottom line.
back-end of the gas production necessary to maintain a critical
curve. awareness of the key elements to
Operating at 90% availability may be
ensure that they are adequately
commercially viable but if the plant can
Water is another difcult element covered.
be run with 99% uptime the additional
in a gas collection system, both
9% makes a signicant impact upon the
from ground water ingress through MANUFACTURE, INSTALLATION AND
overall prot margin of the operation.
well-liners as well as condensate COMMISSIONING
formation during active gas
The staff at Organics has worked on All the elements of such projects come
extraction. Care must be taken,
over three hundred landll sites during round eventually to the same end point
down to a very detailed level, to
the course of the last fteen years. - excellence in application of knowhow
ensure that water build-up does
This includes locations in the United leading to unassailable commercial
not effect system performance.
Kingdom, the United States, Greece, success. This is the speciality of
Portugal, Turkey, Mexico, Thailand, Organics
FINANCE
Hong Kong, Singapore, New Zealand,
Given the success of companies Australia, and Ireland - to name but a
operating landll gas utilisation few.
systems around the world, the
question of nance is not as much On all of these landll sites the
of an issue as it used to be. The equipment that has been installed has
issue now is one of choice; to been designed and manufactured by

Organics Limited
The Barclay Centre
University of Warwick Science Park
Coventry CV4 7EZ,
United Kingdom
T: +44 (0)2476 692141
F: +44 (0)2476 692238
E: comms@organics.com
W: www.organics.com

You might also like