GENERATION FROM
LANDFILL GAS
Project funding options
Feasibility studies
Pumping trials
Complete project design
Manufacture, install and commission
Operation and maintenance
CAPACITY DETERMINATION
This is an important decision gate for
any project. There is a temptation to
consider that as landll gas is “free” it
is not important. However, it is clear
that any investment should be made to
work to the maximum that is available,
without taking undue risks.
GAS EXTRACTION select the source of nance most suited the staff of Organics. This provides a
to the needs of any one particular thorough grounding for the team to
Gas extraction from landll sites is
situation. be able to select the best equipment
a critical element of a good landll
congurations, to design with an
gas utilisation system. If well
PROCUREMENT awareness of the issues involved and to
designed, it will allow tight control
monitor fabrication quality to ensure
of the equilibrium gas production, As a nal lead-in to the actual
that quality failures do not obstruct
ensuring stable operation for the implementation of the project, the
project performance.
duration of the project. procurement cycles will begin. There
are several elements of the project
OPERATION AND MAINTENANCE
The specialised ow-control valve which must be timed to arrive when
commonly employed by Organics required.
The nal, and by no means least
will permit wellhead calibration
important, element in attaining a viable
by means of gas quality and ow A common delay, and surprisingly
outcome is to maintain and operate
rate; ow rate being adjustable to a mostly unexpected one, is the
installed systems in an optimum
approximately 1 Nm3/hr. By use of establishment of an electricity export
manner. As with all commercial
this system operators have been connection. As with many other aspects
activities there is a point at which
able to nely balance systems to of this type of project, each situation
every additional element of revenue
allow higher productivity on the has its unique sensitivities. It is
goes straight to the bottom line.
back-end of the gas production necessary to maintain a critical
curve. awareness of the key elements to
Operating at 90% availability may be
ensure that they are adequately
commercially viable but if the plant can
Water is another difcult element covered.
be run with 99% uptime the additional
in a gas collection system, both
9% makes a signicant impact upon the
from ground water ingress through MANUFACTURE, INSTALLATION AND
overall prot margin of the operation.
well-liners as well as condensate COMMISSIONING
formation during active gas
The staff at Organics has worked on All the elements of such projects come
extraction. Care must be taken,
over three hundred landll sites during round eventually to the same end point
down to a very detailed level, to
the course of the last fteen years. - excellence in application of knowhow
ensure that water build-up does
This includes locations in the United leading to unassailable commercial
not effect system performance.
Kingdom, the United States, Greece, success. This is the speciality of
Portugal, Turkey, Mexico, Thailand, Organics
FINANCE
Hong Kong, Singapore, New Zealand,
Given the success of companies Australia, and Ireland - to name but a
operating landll gas utilisation few.
systems around the world, the
question of nance is not as much On all of these landll sites the
of an issue as it used to be. The equipment that has been installed has
issue now is one of choice; to been designed and manufactured by
Organics Limited
The Barclay Centre
University of Warwick Science Park
Coventry CV4 7EZ,
United Kingdom
T: +44 (0)2476 692141
F: +44 (0)2476 692238
E: comms@organics.com
W: www.organics.com