CONTENTS
NOTICE OF ISSUE 7
FOREWORD 8
INTRODUCTION AND LEGISLATIVE REQUIREMENTS 9
1.1 The Building Act 1991 9
1.1.2 The Building Regulations 10
1.1.3 Acceptable solutions 10
1.2 A summary of the Health and Safety in Employment Act 1992 11
1.2.1 Regulations 11
1.2.2 Approved codes of practice 11
1.2.3 Employers’ duties 11
1.2.4 Hazard management 12
1.2.5 Information for employees 12
1.2.6 Employers to involve employees in the development of health
and safety procedures 13
1.2.7 Training of employees 13
1.2.8 Safety of people who are not employees 13
1.2.9 Employees’ and self-employed persons’ duties 13
1.2.10 Accidents and serious harm (records and notification) 13
2. DEFINITIONS 15
3. GENERAL REQUIREMENTS 17
3.1 General 17
3.1.1 Duties of owners and principals 17
3.1.2 Duties of employers (demolition contractors) 17
3.2 Health and safety inspectors. 18
3.3 Construction work 18
3.3.1 Notifiable construction work 18
3.3.2 General safety provisions 19
3.3.3 Safety of mechanical plant, tools, and personal protective
equipment 19
3.3.4 Safe use of explosives 19
3.3.5 Noise control 19
3.3.6 Fire protection 19
4. PRE-DEMOLITION CHECKS 20
4.1 Introduction 20
4.2 Site inspection 20
4.2.1 General 20
4.2.2 Adjoining buildings 20
4.2.3 Use of the building 21
4.2.4 Public services 21
4.3 Dangerous structures 21
4.4 Structural inspection 21
4.4.1 Building plans 21
4.4.2 Roof 22
4.4.3 Walls 22
4.4.4 Cantilevered structures 22
4.4.5 Basements, cellars, and vaults 22
4.5 Wells and underground storage tanks 22
4.6 Concrete structures 23
4.7 Special buildings 23
4.8 Demolition plan (method statement) 23
5. SAFETY PRECAUTIONS DURING DEMOLITION 24
5.1 General 24
5.2 Earthquakes, wind and vibration 24
5.3 Supervision 24
5.4 Plant, tools and equipment 24
5.5 Personal protective equipment (PPE) 25
5.5.1 Safety helmets and safety footwear 25
5.6 Protection of public 25
5.7 Unauthorised access to site 26
5.8 Noise control 26
5.9 Dust control 26
5.10 Demolition procedures 27
5.10.1 General 27
5.10.2 Scaffolding 27
5.10.3 Health 27
5.10.4 Disposal of debris and waste material 28
5.10.5 Fire prevention 28
5.11 Buildings 29
5.12 Prestressed concrete structures 29
5.13 Storage tanks 30
5.14 Underwater demolition 31
5.14.1 Underwater blasting 32
5.15 Demolition of fire-damaged buildings 32
5.15.1 Inspection prior to demolition 32
5.15.2 Temperature effects on the materials 33
6. METHODS OF DEMOLITION 34
6.1 Demolition by hand 34
6.2 Demolition with the ball 34
6.3 Demolition by pusher arm 35
6.4 Demolition by deliberate collapse 36
6.5 Demolition by wire rope pulling 37
6.6 Demolition by explosion or implosion 37
6.7 Demolition using power grapples and shears 38
6.8 Other methods 38
7. SAFETY USING MECHANICAL PLANT 39
7.1 General plant safety 39
7.1.2 Inspection 39
7.1.3 Maintenance 40
7.2 Front-end loaders, backhoes, excavators and bulldozers 40
7.3 Trucks 41
7.4 Using plant indoors 41
8. GUIDELINES FOR CLEANUP OF CONTAMINATED
SITES 42
8.1 Introduction 42
8.2 Management of contaminated sites 42
8.3 Site control 43
9. HOUSE LIFTING FOR REMOVAL OR EXCAVATION
UNDER 44
9.1 Introduction 44
9.2 General requirements 44
9.2 Precautions during jacking 45
9.3 Pigsties 45
10 DEMOLITION SAFETY CHECKLIST 46
10.1 Before work starts 46
10.2 During the course of the work 46
APPENDIX A: THE SAFE USE OF TOOLS AND
PERSONAL PROTECTIVE EQUIPMENT 8
A.1 Hand tools 48
A.1.1 Sledge hammers and picks 48
A.1.2 Chisels 48
A.1.3 Crowbars 48
A.1.4 Shovels 49
A.2 Power tools 49
A.2.1 Electric power tools 49
A.2.2 Pneumatic power tools 49
A.2.3 Petrol- or diesel-powered tools 50
A.2.4 Abrasive blade tools 50
A.2.5 Chainsaws 50
A.3 Personal protective equipment (PPE) 51
A.3.1 Protective clothing 51
A.3.2 Safety footwear 51
A.3.3 Safety helmet 51
A.3.4 Eye and face protection 51
A.3.5 Hearing protection 51
A.3.6 Respiratory protection 51
APPENDIX B: CUTTING AND WELDING 52
B.1 Personal protective equipment 52
B.2 Fumes and gases 52
B.2.1 Ventilation 53
B.2.2 Containers that have held combustibles 53
B.3 Safe use of cutting torches 53
B.3.1 Cylinder handling 53
B.3.2 Cylinder storage 54
B.3.3 Empty cylinders 54
B.3.4 Torch set-up 54
B.3.5 Hoses 54
B.3.6 Leaks 55
B.3.7 Start-up procedures 55
B.4 Safety in arc welding 55
B.4.1 Electric shock 56
B.4.2 Cables 56
B.5 Liquid oxygen 56
APPENDIX C: ADDITIONAL REFERENCES 58
J. M. Chetwin
Secretary of Labour
September 1994
1.2.1 REGULATIONS
Regulations are promulgated from time to time under the HSE Act.
Regulations may, among other things, impose duties on employers,
employees, designers, manufacturers, and others relating to health and
safety. These regulations may apply with respect to places of work,
plant, processes or substances and may deal with particular problems
that have arisen. Under the Health and Safety in Employment
(Construction) Regulations (yet to be promulgated), it is expected that
demolition works will be notifiable to the Occupational Safety and
Health Service of the Department of Labour.
3.1 GENERAL
Demolition must be carried out in accordance with the Health and
Safety in Employment Act 1992 (HSE Act) and the proposed Health
and Safety in Employment Regulations (HSE Regulations).
4.1 INTRODUCTION
The potential risk of a fatal or serious injury accident is high during
any demolition project, both to employees and to the public. The
identification of hazards and the promotion of safe methods of work
are essential and these should also reflect responsibilities to third
parties.
The public is primarily concerned with materials falling, or dust
billowing from the site onto public roadways or onto adjacent
properties. Two other main concerns are the potential instability of
partially demolished structures, and noise emanating from demolition
sites.
Every demolition job, no matter how small, must be planned. The
planning period is the time to identify the hazards and consider the
precautions to be taken. Safety planned at the start of the demolition
process will always be more cost-effective than safety introduced
midway during the project.
Managers (including principals, agents of principals, and employers) of
demolition projects must lay a solid foundation for safety by adopting
safe systems of work, and employees must co-operate to ensure that
their actions do not compromise safety. This may mean rejecting some
long-established trade practices.
4.2.1 GENERAL
Check the site, building or structure, and its contents, for likely
hazards. These may include asbestos, electric power lines or cables,
gas reticulation, telecommunications, and unsafe structural members.
Pedestrian and vehicle movements passing the site must be determined
and traffic control facilities protected. (See also 5.15.)
4.4.2 ROOF
Examine the roof structure. Check the condition of roof trusses and
identify and mark any bracing that is essential for its stability. Check
the nature and condition of roof cladding. If it is brittle, special
precautions must be taken to prevent employees from falling through
it. In particular, care must be taken with corrugated “plastic” and
asbestos cement roofing.
4.4.3 WALLS
Examine the walls. Identify and mark load-bearing walls and check
whether party or cross walls are properly bonded into front and rear
walls. Check the thickness and condition of walls and gables which are
to remain after the demolition has been completed. Note particularly
any reduction in wall thickness. Any effect on remaining buildings due
to the removal of buttressing walls must also be considered. If in
doubt, consult a registered engineer.
5.1 GENERAL
Accidents have been caused during demolition by:
(a) Persons falling from high, unprotected workplaces and through
openings;
(b) Persons being struck by falling objects;
(c) The building collapsing suddenly and unexpectedly;
(d) Insecure materials in or on the structure;
(e) Plant being used on elevated slabs without proper precautions
being considered.
Safety precautions must be taken to safeguard persons working on the
site and members of the public who are in the vicinity, as well as to
protect property likely to be affected by the demolition.
5.3 SUPERVISION
The contractor must ensure that a competent person is in constant
charge of the demolition while it is being carried out.
5.10.1 GENERAL
All temporary works and protective structures, including hoardings,
gantries, screens, scaffolds and propping, should be erected before
demolition begins, and be maintained in good order throughout the
duration of the work. Demolition must be carried out in a planned
sequence. Ensure that everybody is kept at a safe distance, and that no
one enters the building once demolition by pulling, balling or
deliberate collapse has begun.
5.10.2 SCAFFOLDING
Where “special” scaffolding (refer to the OSH Approved Code of
Practice for the Safe Erection and Use of Scaffolding) is used for
demolition work, it must be designed by a competent person to carry
the loads placed upon it during demolition. Scaffolding 8 metres or
more in height can only be erected by a certificated scaffolder.
Where there is a danger of materials falling onto employees or the
public below, the entire face of the scaffold must be covered with
small mesh netting unless other precautions are taken. Where public
access ways pass alongside these scaffolds, catch screens covered with
suitable protective material must be provided. These scaffolds must be
lit during the hours of darkness and be provided with large notices
warning the public to keep out of the demolition site because danger
exists.
Precautions should be taken to prevent the collapse of scaffolds at
demolition sites. Accidents have occurred due to the removal of the
parts of the building to which the scaffold was tied, making the
scaffold unstable. In general, scaffolding can only remain free-standing
after the removal of supporting ties, if its base equals one-third or
more of its height.
5.10.3 HEALTH
The main hazards to health during demolition work are:
(a) Asbestos dust, chiefly from insulation materials, and frequently
found in fire-protective cladding around structural steel mem-
bers, partition walls, sprayed ceilings and lagging to steam and
chemical plant. All asbestos must be removed from a building or
structure prior to demolition commencing. Such asbestos could
include asbestos cement siding and roofing, asbestos cement
piping, some ceiling materials, acoustic sprays, fireproofing
materials for steel or concrete, insulation of ducts, pipes and
cavities, and so on. All work involving the removal of asbestos is
to be in accordance with the Asbestos Regulations 1983.
5.11 BUILDINGS
To prevent injury from broken glass, all glass must be removed from
windows before demolition begins. Window openings on street
frontages, or adjacent to access ways, must be blocked off.
Openings in walls, floors, roofs, and stairwells, through which people
could fall, must be boarded up or be provided with a guardrail and
toeboard, or both. Access to the areas where flooring has been
removed must be barricaded off, and notices erected to warn of the
danger at each point of entry.
All stairs or installed ladders must be checked before use. Never
assume they are sound: it may have been years since they were used.
When in good condition, leave them as a means of access or egress for
as long as possible.
When dismantling pitched roof trusses, the last frame should be guyed
before the second to last truss is removed, because its stability
depends on the support from adjacent members. As supports and
buttresses are removed, bracing should be provided to stabilise the
remaining structure.
Avoid leaving free-standing walls by reducing the building in small
lifts. Never leave isolated walls or potentially unstable structures
unpropped, unless they are stable against wind and other forces likely
to affect them.
When demolishing a reinforced concrete floor, it may be necessary to
remove a small section first in order to determine the direction of the
main steel. Provide support for beams before cutting them free of
columns and walls, if necessary. Columns must be guyed before cutting
or weakening the base, so that their fall may be controlled. Clear
openings should be made in floors to allow debris to pass through.
Concrete
0-300 degree C fires Strength unaffected.
300-600 degree C fires The concrete may turn pink, it appears
sound but strength loss will have
occurred.
600-900 degree C fires The concrete turns whitish grey and
becomes weaker and more friable.
Above 900 degree C The concrete turns buff and is weak and
friable.
Reinforcing Steel
Generally OK unless the concrete has spalled off.
For prestressed concrete, the loss of strength can be substantial,
extreme caution is necessary.
Steel
Structural steels usually become weak in tension while the
compressive strength is affected less. High-strength steel is affected
more than mild steel. Take particular care when cutting steel after it
has been affected by fire. It may spring unexpectedly.
Timber
The strength is not affected but the loss of section reduces section
modulus, thus lowering its load capacity.
Masonry
The compressive strength is probably reduced and tensile strengths
substantially reduced.
7.1.2 INSPECTION
An essential factor of any equipment safety programme is the
enforcement of the daily, weekly, monthly, or regular, inspection and
maintenance of plant and equipment. The regular inspections are those
that are set out in the equipment manuals, and these should be
consulted. Records should be kept of all inspection and maintenance
activities. Inspections should be carried out by competent employees
who have a thorough knowledge of the equipment.
The daily inspections should include a thorough walk-around before
climbing aboard the machine. All fluid levels should be checked.
Missing bolts, pins, loose fittings and couplings, frayed cables and
hoses, loose tracks and so on should be identified and corrected.
Cracked paint can be evidence of underlying structural failure.
Equipment surfaces and the ground under the machine should be
checked for evidence of leaking fluids.
Windscreens should be kept clean. All warning alarms should be in
good working condition.
When the machine is under any form of maintenance, a tag must be
placed on the ignition to prevent the machine being started. Only the
person placing the tag may remove it.
The pre-ignition check should include removal of all personal items
which might obstruct the operator’s movement. Before ignition all
controls should be in neutral, and the controls checked to ensure there
is no “tag-out” on the ignition. Such a tag-out might indicate that
maintenance employees are under the machine. After start-up, the
equipment should be checked for proper readings and all controls
should be tested.
Any faults found during any of the checks should be reported to the
employer (person in charge) and corrected before work starts. No
7.1.3 MAINTENANCE
Maintenance can be hazardous unless carried out carefully and in
accordance with safe work practices. It should only be carried out in a
safe location. Before anyone crawls under any machine, the wheels
should be blocked and the ignition tagged out. All controls should be
in neutral and the brakes applied.
Adequate ventilation must be provided to ensure employees are not
poisoned by fumes.
Even common items such as batteries and tyres can be hazardous, and
safe practices must always be followed.
8.1 INTRODUCTION
Demolition work may include the cleaning up of sites that have been
chemically contaminated. The hazards of these sites can be
environmental or they may present a danger to human health and
safety. Contaminated sites can be of variable size and complexity, and
for a successful decontamination process, proper evaluation,
assessment and management will be required. Further information can
be found in the OSH document Health and Safety Guidelines on the
Cleanup of Contaminated Sites.
In terms of this code, the prevention of exposure to toxic chemicals is
the primary concern. Appropriate means to protect demolition
employees or the general public must be adopted. In New Zealand,
contaminated sites include:
(a) Sites where timber treatment chemicals were used;
(b) Sites where pesticides or agrichemicals were used or stored;
(c) Disused gas works;
(d) Uncontrolled landfill tips;
(e) Sites that contained underground storage tanks.
Occupational hazards associated with the cleanup of contaminated
sites may include:
(a) Fire and explosion;
(b) Hazardous substance exposure;
(c) Safety issues;
(d) Heat stress (associated with full body protective suits);
(e) Confined space hazards.
9.1 INTRODUCTION
House lifting or the lifting of buildings, as a prelude to either
excavation under the house or for relocation of the house, is extremely
hazardous unless properly planned and carried out taking the
appropriate precautions.
9.3 PIGSTIES
Pigsties can be constructed from timber bearers each measuring 200 x
100 x 900 mm. At least three bearers covering an area 900 mm square
should form the base of the sty. The height of the sty should not
exceed three times its minimum width. The timber used should be
sound and substantial enough not to crush, and have true faces to
uniformly support the load.
A.1.2 CHISELS
The safe use of chisels begins with the selection of a sharp instrument
of the right size for the job, and a hammer of appropriate weight.
Chisel heads that have begun to mushroom should be ground to avoid
the danger of flying chips. Goggles must always be worn when chisels
are in use.
A.1.3 CROWBARS
A safe crowbar has a point that grips the object to be moved, and a
heel to act as a fulcrum. Makeshift crowbars, such as pieces of pipe or
A.1.4 SHOVELS
Back injuries are the most serious injuries resulting from the use of
shovels. To avoid such injuries, proper attention should be paid to the
employee’s stance, their lifting technique, and the way they turn and
empty the shovel. Twisting the spine should be avoided: the legs,
rather than the arms, shoulders, and back should be used wherever
possible. Employees should use the ball of the foot rather than the
arch to push the shovel. That way, if the foot slips the shovel’s sharp
corner will not cut the ankle.
A.2.5 CHAINSAWS
Chainsaws may be used for cutting timber, concrete and masonry. The
chainsaw is one of the most dangerous hand tools used in demolition.
Serious injuries can result from the kickback reaction that occurs when
the nose of the chain comes in contact with a solid object. To avoid
being directly in the kickback path, the operator should position their
body entirely to one side of the saw. The operator should never reach
above chest height with the saw. A firm grip with both hands is an
essential basic handling precaution. Protective gear, including eye, ear,
head and hand protection, should be worn at all times. Protective
“leggings” (chaps) are available and should be worn by chainsaw
operators. Chainsaws must never be drop started. Special precautions
may be necessary if working at height.
B.3.5 HOSES
It is important that the regulators are used only for those gases listed
on the regulator. Oxygen fittings have right-hand threads and fuel gas
fittings have left-hand threads to prevent accidental switching. To
avoid confusion, oxygen, acetylene, propane and other fuel gases
should be called by their proper names, and not by “air” or “gas”.
B.3.6 LEAKS
A leak test can be performed to assure that fittings and valves are
correctly seated. The test involves pressurising the lines and applying
soapy water on each fitting and valve. Leaks, which show up as
bubbles, must be repaired. If, when the valve on a fuel gas cylinder is
opened, there is a leak around the valve stem, the valve should be
closed and the gland nut tightened. If this action does not stop the
leak, the use of the cylinder should be discontinued, and it should be
properly tagged and removed from the work area. If the fuel gas
should leak from the cylinder valve and cannot be shut off, the
cylinder should be tagged and removed from the work area. If a leak
develops at a fuse plug or other safety device, the cylinder should be
removed from the work area.
B.4.2 CABLES
Cables should be inspected regularly for wear and damage. Cables
with damaged insulation should be replaced or repaired. Lengths of
cable produce heat when in use, so cables should be neatly uncoiled
to prevent damage to the insulation.