You are on page 1of 1

2.

00

7.00

0.60

CONCRETE GUTTER

CARRIAGE WAY

1.00
CB-1

CL

ROAD LOT 5 ROADWAY SECTION ( 7 M )


NOT
TO
SCALE

SEE BEAM DETAIL

2.00
1.66

USE 2x2x14'' ANGLE BAR INVERTED


POSITION SPACED @ S = 100 MM

170x250 BEAM

1-50mm, 2-75mm
REST @ 100mm

0.55
170 mm THK. CONCRETE MANHOLE W/
PLASTER CEMENT FINISH INTERIOR

1.40

VARY
0.55

REINFORCED CONCRETE PIPE CULVERT


SAND TRAP (0.20)

0.85

0.85

0.15

2.00

GRAVEL BED (0.10)

STEEL GRATING DETAIL


NOT

Prepared by:
______________________________
BENUARDO A. MARALIT, CE.,MEng'g.
Project Manager
A.V. PAMATONG-GRANBY JV

TO

CATCH BASIN-3 BEAM DETAIL


NOT

SCALE

Checked & Verified by:


______________________________
JOSEPH S. ABELLAR
Senior/ Deputy Horizontal Team Leader
CONSULTANT

Noted by:
______________________________
LT. COL. THURMAN B. FANUGAO
Philippine Air Force End-User

TO

SCALE

Approved by:
______________________________
AHMED G. CUIZON
Project Manager
MCIAA-PMO