Congratulations on getting called for that all-important, career-changing civil engineering interview. But, now comes the hard part. The
most important part of preparing for an interview (https://www.monsterindia.com/career-advice/got-an-interview-call-read-this-
before-you-go-6488.html) is to be aware of what kind of civil engineering interview questions might be thrown in your direction. That way,
you will be in a great position to prepare your answers well in advance and feel confident that your responses will impress the interviewer.
Here’s a list of 8 must-know civil engineering interview questions and answers to ensure your next interview is a success.
Projection line can be described as the way in which the earth is displayed on a flat piece of paper.
2. Can you list out the various steps involved in the concreting process?
• Batching
• Mixing
• Transporting and placement of concrete
• Compacting
Here are also some non-technical aspects of the interview you should know about: 10 Tips to stay focused in an interview
(https://www.monsterindia.com/career-advice/10-tips-to-stay-focused-in-an-interview-6556.html)
3. List out the reinforcements that are used in the process of prestressing.
There are three primary types of reinforcements that are used in the prestressing process. They are:
• Spalling Reinforcements.
• Equilibrium Reinforcements.
• Bursting Reinforcements.
Cement soundness can be described as a property which ensures that the cement does not go through any appreciable expansion or
experience any change in volume once it has been set. This process helps get rid of any possibilities of the mortar or concrete from
getting disrupted.
In case you’re scheduled for a telephonic interview, here are some points to keep in mind: Phone Interview Tips: 10 Keys to succeed in a
telephonic interview (https://www.monsterindia.com/career-advice/phone-interview-tips-10-keys-to-succeed-in-a-telephonic-
interview-6485.html)
5. Explain Fatigue. Can you point out some of the structures that may be subjected to fatigue?
Fatigue can be described as the gradual damage to a structure that occurs when it is subjected to cyclic loading (repeated loading and
unloading). Some of the structures that may be subjected to fatigue include:
Slump tests are initiated to empirically measure the consistency of fresh concrete before it sets. They can also be used to check for an
improperly mixed batch of concrete as well. There are three different types of slumps that occur in slump tests listed as below:
• True Slump
• Shear Slump
• Collapse Slump
Along with these technical questions, check out some ways to showcase interpersonal skill too: How to win over your interviewer and get
the job (https://www.monsterindia.com/career-advice/how-to-win-over-your-interviewer-and-get-the-job-6559.html)
Built up area includes the carpet area as well as any space occupied by walls, pillars, and ducts. In most cases, the built-up area is
calculated as an excess of 10% of the carpet area.
The super built-up area covers the built-up area as well as any areas that used by building amenities such as life passages, lobby, stairs,
gym, clubhouse, etc.
There are several types of roofs available. Some of the commonly used ones include:
• Gable roof
• Gambrel roof
• Shed roof
• Half-hipped roof
• Dutch Hip roof
• A-Frame roof
• Skillion roof
• Folded Plate roof
• Gull wind roof
• Bell cast roof
• Sawtooth roof
Here is an additional list of eight civil engineering interview questions that may be asked by your interviewer during the interview.
You could also check out some generic interview questions in between here: How to answer 10 most common interview questions
(https://www.monsterindia.com/career-advice/how-to-answer-10-most-common-interview-questions-6495.html)