You are on page 1of 57

#REF!

#REF!
#REF!
#REF!

(1)
Refference
#REF!

1 Satu 1 Satuan #REF!


2 Dua 2 Puluhan #REF!
3 Tiga 3 Ratusan #REF!
4 Empat 4 Ribuan #REF!
5 Lima 5 Puluhan Ribu #REF!
6 Enam 6 Ratusan Ribu #REF!
7 Tujuh 7 Jutaan #REF!
8 Delapan 8 Puluhan Juta #REF!
9 Sembilan 9 Ratusan Juta #REF!
10 Sepuluh 10 Milyar #REF!
11 Sebelas 11 Puluhan Milyar #REF!
12 Dua belas 12 Ratusan Milyar #REF!
13 Tiga belas 13 Trilyun #REF!
14 Empat belas 14 Puluhan Trilyun #REF!
15 Lima belas 15 Ratusan Trilyun #REF!
16 Enam belas
17 Tujuh belas
18 Delapan belas
19 Sembilan belas
#REF!
#REF!
#REF!
#REF!

(1) (2)

#REF! #REF!

#REF! #REF! 1 Satuan #REF!


#REF! #REF! 2 Puluhan #REF!
#REF! #REF! 3 Ratusan #REF!
#REF! #REF! 4 Ribuan #REF!
#REF! #REF! 5 Puluhan #REF!
#REF! #REF! 6 Ratusan #REF!
#REF! #REF! 7 Jutaan #REF!
#REF! #REF! 8 Puluhan #REF!
#REF! #REF! 9 Ratusan #REF!
#REF! #REF! 10 Milyar #REF!
#REF! #REF! 11 Puluhan #REF!
#REF! #REF! 12 Ratusan #REF!
#REF! #REF! 13 Trilyun #REF!
#REF! #REF! 14 Puluhan #REF!
#REF! #REF! 15 Ratusan #REF!

#REF!
#REF!
#REF!
#REF!
#REF!

(2) (3)

#REF! #REF! #REF!

#REF! #REF! 1 Satuan #REF! #REF!


#REF! #REF! 2 Puluhan #REF! #REF!
#REF! #REF! 3 Ratusan #REF! #REF!
#REF! #REF! 4 Ribuan #REF! #REF!
#REF! #REF! 5 Puluhan #REF! #REF!
#REF! #REF! 6 Ratusan #REF! #REF!
#REF! #REF! 7 Jutaan #REF! #REF!
#REF! #REF! 8 Puluhan #REF! #REF!
#REF! #REF! 9 Ratusan #REF! #REF!
#REF! #REF! 10 Milyar #REF! #REF!
#REF! #REF! 11 Puluhan #REF! #REF!
#REF! #REF! 12 Ratusan #REF! #REF!
#REF! #REF! 13 Trilyun #REF! #REF!
#REF! #REF! 14 Puluhan #REF! #REF!
#REF! #REF! 15 Ratusan #REF! #REF!
#REF!
#REF!
#REF!
#REF!

(4)

#REF! #REF!

#REF! 1 Satuan #REF! #REF! #REF!


#REF! 2 Puluhan #REF! #REF! #REF!
#REF! 3 Ratusan #REF! #REF! #REF!
#REF! 4 Ribuan #REF! #REF! #REF!
#REF! 5 Puluhan #REF! #REF! #REF!
#REF! 6 Ratusan #REF! #REF! #REF!
#REF! 7 Jutaan #REF! #REF! #REF!
#REF! 8 Puluhan #REF! #REF! #REF!
#REF! 9 Ratusan #REF! #REF! #REF!
#REF! 10 Milyar #REF! #REF! #REF!
#REF! 11 Puluhan #REF! #REF! #REF!
#REF! 12 Ratusan #REF! #REF! #REF!
#REF! 13 Trilyun #REF! #REF! #REF!
#REF! 14 Puluhan #REF! #REF! #REF!
#REF! 15 Ratusan #REF! #REF! #REF!
#REF!
#REF!
#REF!
#REF!

(5)

#REF! #REF!

1 Satuan #REF! #REF! #REF!


2 Puluhan #REF! #REF! #REF!
3 Ratusan #REF! #REF! #REF!
4 Ribuan #REF! #REF! #REF!
5 Puluhan #REF! #REF! #REF!
6 Ratusan #REF! #REF! #REF!
7 Jutaan #REF! #REF! #REF!
8 Puluhan #REF! #REF! #REF!
9 Ratusan #REF! #REF! #REF!
10 Milyar #REF! #REF! #REF!
11 Puluhan #REF! #REF! #REF!
12 Ratusan #REF! #REF! #REF!
13 Trilyun #REF! #REF! #REF!
14 Puluhan #REF! #REF! #REF!
15 Ratusan #REF! #REF! #REF!
RENCANA ANGGARAN BIAYA

PROYEK #REF!
LOKASI #REF!
OWNER #REF!
Tanggal #REF!

G R AN D R E K A P I T U L A S I

JUMLAH HARGA TOTAL HARGA


NO URAIAN PEKERJAAN
Rp Rp
(1) (2) (3) (4)
### PEKERJAAN JEMBATAN #REF!
II PEKERJAAN LAIN -LAIN 2,423,469,578.90

JUMLAH #REF!
FEE 7,5% #REF!
JUMLAH TOTAL #REF!
PEMBULATAN #REF!

TOTAL #REF!
Terbilang :
#REF!
RENCANA ANGGARAN BIAYA

PROYEK #REF!
LOKASI #REF!
OWNER #REF!
Tanggal #REF!

G R AN D R E K A P I T U L A S I

JUMLAH HARGA TOTAL HARGA


NO URAIAN PEKERJAAN
Rp Rp
(1) (2) (3) (4)
Note: Semarang , 6 Januari 2018

( Harsono )
RENCANA ANGGARAN BIAYA

PROYEK : PEKERJAAN CAFÉ JALAN CAKRAWALA

LOKASI : Jl. Ckrawala Semarang

OWNER :

Tanggal : 24 November 2018

Volume
NO URAIAN PEKERJAAN SAT

(1) (2) (3) (4)

A PEKERJAAN LANTAI 1

I Pekerjaan Persiapan

1 Pek. Pembersihan sebelum dan Sesudah m2 840.00

2 Pek. Listrik Kerja Ls 1.00

3 Pek. Air Kerja Ls 1.00

4 Pek. Keamanan Bln 6.00

5 Material Hois dan Andang Ls 1.00


RENCANA ANGGARAN BIAYA

PROYEK : PEKERJAAN CAFÉ JALAN CAKRAWALA

LOKASI : Jl. Ckrawala Semarang

OWNER :

Tanggal : 24 November 2018

Volume
NO URAIAN PEKERJAAN SAT

(1) (2) (3) (4)

II Pekerjaan Tanah

1 Galian Tanah Pondasi m3 67.50

2 Galian Tanah Sloof m3 16.20

3 Urugan Tanah Kembali m3 27.90

4 Urugan Padas Peninggian Lantai 30cm m3 118.80

III Pekerjaan Pondasi


RENCANA ANGGARAN BIAYA

PROYEK : PEKERJAAN CAFÉ JALAN CAKRAWALA

LOKASI : Jl. Ckrawala Semarang

OWNER :

Tanggal : 24 November 2018

Volume
NO URAIAN PEKERJAAN SAT

(1) (2) (3) (4)

1 Pek. Pondasi Batu Kali m3 41.11

2 Pek. Pondasi Pancang 28x28x28 kedalaman 12m m1 480.00

3 Pek. Pecah Kepala Pancang Bh 40.00

IV Pekerjaan Beton

1 Pek. T Beam 0.5x0.5x0.7 m3 3.68

2 Kolom Pedestal 30x40 m3 3.78

3 Rabat Beton Sloof 5cm m3 1.89


RENCANA ANGGARAN BIAYA

PROYEK : PEKERJAAN CAFÉ JALAN CAKRAWALA

LOKASI : Jl. Ckrawala Semarang

OWNER :

Tanggal : 24 November 2018

Volume
NO URAIAN PEKERJAAN SAT

(1) (2) (3) (4)

4 Pek. Sloof 20x30 m3 11.34

5 Pek. Sloof Praktis 15/20 m3 2.16

6 Pek. Kolom Praktis 15/15 m3 5.18

7 Pek. Ringbalk Praktis 15/20 m3 5.36

8 Pek. Plat Lantai 2 tebal 12mm m3 52.29

9 Pek. Beton Tangga m3 3.47

10 Pek. Plat Atap Pos tebal 10cm m3 2.13


RENCANA ANGGARAN BIAYA

PROYEK : PEKERJAAN CAFÉ JALAN CAKRAWALA

LOKASI : Jl. Ckrawala Semarang

OWNER :

Tanggal : 24 November 2018

Volume
NO URAIAN PEKERJAAN SAT

(1) (2) (3) (4)

V Pekerjaan Dinding

1 Pas. Bata tebal 1/2 Bata m2 303.03

2 Plesteran + Acian m2 606.06

3 Pas. Rangka Dinding Hollow m2 201.60

4 Pas. Dinding keramik 30x60 m2 88.20

5 Pek. Keramik 20x25 m2 14.81

6 Pengecatan Dinding ex catylac m2 606.06


RENCANA ANGGARAN BIAYA

PROYEK : PEKERJAAN CAFÉ JALAN CAKRAWALA

LOKASI : Jl. Ckrawala Semarang

OWNER :

Tanggal : 24 November 2018

Volume
NO URAIAN PEKERJAAN SAT

(1) (2) (3) (4)

VI Pekerjaan Lantai

1 Pek. Rabat Beton Bawah Lantai 5cm m3 15.76

2 Pek. Lantai Granit tile 60x60 m2 336.23

3 Pas. Keramik 40x40 (pos) m2 14.37

4 Pas. Paving Luar m2 548.00

VII Pekerjaan Plafond

1 Pek. Plafond Gypsume Rangka Hollow m2 201.86


RENCANA ANGGARAN BIAYA

PROYEK : PEKERJAAN CAFÉ JALAN CAKRAWALA

LOKASI : Jl. Ckrawala Semarang

OWNER :

Tanggal : 24 November 2018

Volume
NO URAIAN PEKERJAAN SAT

(1) (2) (3) (4)

2 Pek. Pengecatan Plafond ex. Maxilite m2 201.86

VIII Pekerjaan Kusen Pintu dan Jendela

1 Pek. Pintu Baja m2 9.20

2 Pek. Jendela Baja Bh 56.00

3 Pas. Pintu Multiplek m2 8.40

4 Pas. Kusen Alumunium 3" m1 51.90

5 Pas. Pintu Alumunium Bh 3.00


RENCANA ANGGARAN BIAYA

PROYEK : PEKERJAAN CAFÉ JALAN CAKRAWALA

LOKASI : Jl. Ckrawala Semarang

OWNER :

Tanggal : 24 November 2018

Volume
NO URAIAN PEKERJAAN SAT

(1) (2) (3) (4)

6 Pas. Jendela Alumunium Bh 2.00

7 Pas. Kaca 5mm m2 228.82

IX Pekerjaan Baja

1 Kolom WF 300 Kg 3,699.36

2 Balok WF 300 Kg 7,398.72

3 Balok WF 250 Kg 4,102.56

4 Balok WF 150 Kg 1,058.40


RENCANA ANGGARAN BIAYA

PROYEK : PEKERJAAN CAFÉ JALAN CAKRAWALA

LOKASI : Jl. Ckrawala Semarang

OWNER :

Tanggal : 24 November 2018

Volume
NO URAIAN PEKERJAAN SAT

(1) (2) (3) (4)

5 Plat Pedestal 12mm kg 588.00

6 Plat RIP 10mm kg 733.95

7 Bondex m2 409.50

8 Pengecatan Baja kg 17,580.99

X Pekerjaan Sanitasi

1 Pek. Instalasi Air Bersih Ls 1.00

2 Pek. Instalasi Air Kotor Ls 1.00


RENCANA ANGGARAN BIAYA

PROYEK : PEKERJAAN CAFÉ JALAN CAKRAWALA

LOKASI : Jl. Ckrawala Semarang

OWNER :

Tanggal : 24 November 2018

Volume
NO URAIAN PEKERJAAN SAT

(1) (2) (3) (4)

3 Pek. Saluran Air Hujan m1 76.00

4 Pek. Saluran Luar D40cm m1 133.35

5 Pek. Kloset Jongkok + Jetsower Ls 1.00

6 Pek. Kloset Duduk Unit 4.00

7 Pas. Wastfel Unit 4.00

8 Pas. Washbak Unit 2.00

9 Pas. Kran Air Unit 7.00

10 Pas. Floordrain Unit 5.00


RENCANA ANGGARAN BIAYA

PROYEK : PEKERJAAN CAFÉ JALAN CAKRAWALA

LOKASI : Jl. Ckrawala Semarang

OWNER :

Tanggal : 24 November 2018

Volume
NO URAIAN PEKERJAAN SAT

(1) (2) (3) (4)

11 Pas. Septicktank Ttk 3.00

XI Pekerjaan Elektrikal

1 Pas. Instalasi Titik Lampu Ttk 125.00

2 Pas. Saklar + Instalasi TTk 64.00

3 Pas. Stop Kontak + Instalasi Ttk 60.00

4 Pas Panel Ls 1.00


RENCANA ANGGARAN BIAYA

PROYEK : PEKERJAAN CAFÉ JALAN CAKRAWALA

LOKASI : Jl. Ckrawala Semarang

OWNER :

Tanggal : 24 November 2018

Volume
NO URAIAN PEKERJAAN SAT

(1) (2) (3) (4)

B PEKERJAAN LANTAI 2

I Pekerjaan Beton

1 Pek. Kolom Praktis 15/15 m3 9.64

2 Pek. Ringbalk Praktis 15/20 m3 11.88

3 Pek. Meja Beton (Dapur) m3 0.50

II Pekerjaan Dinding
RENCANA ANGGARAN BIAYA

PROYEK : PEKERJAAN CAFÉ JALAN CAKRAWALA

LOKASI : Jl. Ckrawala Semarang

OWNER :

Tanggal : 24 November 2018

Volume
NO URAIAN PEKERJAAN SAT

(1) (2) (3) (4)

1 Pas. Bata tebal 1/2 Bata m2 1,236.00

2 Plesteran + Acian m2 2,472.00

3 Pek. Keramik 20x25 (KM) m2 374.22

4 Pengecatan Dinding exterior ex mowilex m2 352.80

5 Pengecatan Dinding Interior ex catilac m2 2,119.20

III Pekerjaan Lantai

1 Pas. Keramik 40x40 (pos) m2 386.46


RENCANA ANGGARAN BIAYA

PROYEK : PEKERJAAN CAFÉ JALAN CAKRAWALA

LOKASI : Jl. Ckrawala Semarang

OWNER :

Tanggal : 24 November 2018

Volume
NO URAIAN PEKERJAAN SAT

(1) (2) (3) (4)

IV Pekerjaan Plafond

1 Pek. Plafond Gypsume Rangka Hollow m2 378.00

2 Pek. Pengecatan Plafond ex. Maxilite m2 378.00

3 Pek. Plafond Exterior GRC m2 68.00

4 Pek. Lis Plafond Gypsume m1 480.48

V Pekerjaan Kusen, Pintu dan Kaca


RENCANA ANGGARAN BIAYA

PROYEK : PEKERJAAN CAFÉ JALAN CAKRAWALA

LOKASI : Jl. Ckrawala Semarang

OWNER :

Tanggal : 24 November 2018

Volume
NO URAIAN PEKERJAAN SAT

(1) (2) (3) (4)

1 Pek. Jendela Baja m2 70.20

2 Pas. Pintu Multiplek m2 37.80

3 Pas. Kusen Alumunium 3" m1 217.56

4 Pas. Pintu Alumunium Bh 18.00

5 Pas. Kaca 5mm m2 73.17

VI Pekerjaan Baja Atap

1 Kuda-kuda CNP 150x2.3 Kg 1,208.79


RENCANA ANGGARAN BIAYA

PROYEK : PEKERJAAN CAFÉ JALAN CAKRAWALA

LOKASI : Jl. Ckrawala Semarang

OWNER :

Tanggal : 24 November 2018

Volume
NO URAIAN PEKERJAAN SAT

(1) (2) (3) (4)

2 Gording CNP 125x2,3 Kg 2,981.00

3 Plat Sepatu 6mm Kg 154.00

4 Plat Pedestal 10mm Kg 256.30

5 Beton Kress dan Trakstang 12mm kg 211.07

6 Pengecatan kg 4,811.16

7 Atap Galvalume 0.35 m2 633.60

8 Lisplank m1 100.00
RENCANA ANGGARAN BIAYA

PROYEK : PEKERJAAN CAFÉ JALAN CAKRAWALA

LOKASI : Jl. Ckrawala Semarang

OWNER :

Tanggal : 24 November 2018

Volume
NO URAIAN PEKERJAAN SAT

(1) (2) (3) (4)

VII Pekerjaan Sanitasi

1 Pek. Instalasi Air Bersih Ls 177.10

2 Pek. Instalasi Air Kotor Ls 228.80

3 Pek. Saluran Air Hujan m1 89.10

4 Pek. Kloset Duduk + Jet Sower Unit 18.00

5 Pas. Wastfel Unit 18.00

6 Pas. Washbak Unit 1.00

7 Pas. Kran Air m6 36.00


RENCANA ANGGARAN BIAYA

PROYEK : PEKERJAAN CAFÉ JALAN CAKRAWALA

LOKASI : Jl. Ckrawala Semarang

OWNER :

Tanggal : 24 November 2018

Volume
NO URAIAN PEKERJAAN SAT

(1) (2) (3) (4)

8 Pas. Floordrain m7 18.00

VIII Pekerjaan Elektrikal

1 Pas. Instalasi Titik Lampu Ttk 62.00

2 Pas. Saklar + Instalasi Ttk 24.00

3 Pas. Stop Kontak + Instalasi Ttk 24.00


RENCANA ANGGARAN BIAYA

PROYEK : PEKERJAAN CAFÉ JALAN CAKRAWALA

LOKASI : Jl. Ckrawala Semarang

OWNER :

Tanggal : 24 November 2018

Volume
NO URAIAN PEKERJAAN SAT

(1) (2) (3) (4)

NB : Tidak Termasuk Perijinan IMB dll.


: Tidak Termasuk Interior
: Tidak Biaya sambung PLN
: Tidak Biaya Sambung Pam
NA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA TOTAL HARGA

( Rp ) ( Rp ) ( Rp )

(5) (6) (7)

1,410,902,650

26,060,000.00

9,000.00 7,560,000.00

4,000,000.00 4,000,000.00

4,000,000.00 4,000,000.00

1,250,000.00 7,500,000.00

3,000,000.00 3,000,000.00
NA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA TOTAL HARGA

( Rp ) ( Rp ) ( Rp )

(5) (6) (7)

20,079,000.00

65,000.00 4,387,500.00

65,000.00 1,053,000.00

35,000.00 976,500.00

115,000.00 13,662,000.00

95,664,500.00
NA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA TOTAL HARGA

( Rp ) ( Rp ) ( Rp )

(5) (6) (7)

600,000.00 24,664,500.00

145,000.00 69,600,000.00

35,000.00 1,400,000.00

249,182,711.25

3,885,000.00 14,277,375.00

4,850,000.00 18,333,000.00

850,000.00 1,606,500.00
NA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA TOTAL HARGA

( Rp ) ( Rp ) ( Rp )

(5) (6) (7)

3,885,000.00 44,055,900.00

4,850,000.00 10,472,726.25

4,850,000.00 25,142,400.00

4,850,000.00 25,971,750.00

1,700,000.00 88,893,000.00

4,850,000.00 16,815,435.00

1,700,000.00 3,614,625.00
NA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA TOTAL HARGA

( Rp ) ( Rp ) ( Rp )

(5) (6) (7)

217,026,495.00

120,000.00 36,363,600.00

60,000.00 36,363,600.00

500,000.00 100,800,000.00

285,000.00 25,137,000.00

135,000.00 1,998,675.00

27,000.00 16,363,620.00
NA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA TOTAL HARGA

( Rp ) ( Rp ) ( Rp )

(5) (6) (7)

185,288,508.75

850,000.00 13,398,656.25

285,000.00 95,825,550.00

145,000.00 2,084,302.50

135,000.00 73,980,000.00

21,195,562.50

90,000.00 18,167,625.00
NA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA TOTAL HARGA

( Rp ) ( Rp ) ( Rp )

(5) (6) (7)

15,000.00 3,027,937.50

72,345,240.00

650,000.00 5,980,000.00

350,000.00 19,600,000.00

650,000.00 5,460,000.00

90,000.00 4,671,000.00

1,000,000.00 3,000,000.00
NA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA TOTAL HARGA

( Rp ) ( Rp ) ( Rp )

(5) (6) (7)

800,000.00 1,600,000.00

140,000.00 32,034,240.00

354,738,132.00

16,000.00 59,189,760.00

16,000.00 118,379,520.00

16,000.00 65,640,960.00

16,000.00 16,934,400.00
NA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA TOTAL HARGA

( Rp ) ( Rp ) ( Rp )

(5) (6) (7)

16,000.00 9,408,000.00

16,000.00 11,743,200.00

145,000.00 59,377,500.00

800.00 14,064,792.00

68,422,500.00

5,000,000.00 5,000,000.00

5,000,000.00 5,000,000.00
NA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA TOTAL HARGA

( Rp ) ( Rp ) ( Rp )

(5) (6) (7)

45,000.00 3,420,000.00

150,000.00 20,002,500.00

450,000.00 450,000.00

3,250,000.00 13,000,000.00

1,250,000.00 5,000,000.00

1,000,000.00 2,000,000.00

125,000.00 875,000.00

35,000.00 175,000.00
NA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA TOTAL HARGA

( Rp ) ( Rp ) ( Rp )

(5) (6) (7)

4,500,000.00 13,500,000.00

100,900,000.00

400,000.00 50,000,000.00

350,000.00 22,400,000.00

350,000.00 21,000,000.00

7,500,000.00 7,500,000.00
NA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA TOTAL HARGA

( Rp ) ( Rp ) ( Rp )

(5) (6) (7)

1,012,566,929.40

105,202,125.00

4,850,000.00 46,749,150.00

4,850,000.00 57,596,175.00

1,700,000.00 856,800.00

416,726,100.00
NA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA TOTAL HARGA

( Rp ) ( Rp ) ( Rp )

(5) (6) (7)

120,000.00 148,320,000.00

60,000.00 148,320,000.00

135,000.00 50,519,700.00

35,000.00 12,348,000.00

27,000.00 57,218,400.00

56,036,700.00

145,000.00 56,036,700.00
NA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA TOTAL HARGA

( Rp ) ( Rp ) ( Rp )

(5) (6) (7)

56,276,720.00

90,000.00 34,020,000.00

15,000.00 5,670,000.00

145,000.00 9,860,000.00

14,000.00 6,726,720.00

107,494,830.00
NA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA TOTAL HARGA

( Rp ) ( Rp ) ( Rp )

(5) (6) (7)

500,000.00 35,100,000.00

650,000.00 24,570,000.00

90,000.00 19,580,400.00

1,000,000.00 18,000,000.00

140,000.00 10,244,430.00

124,511,454.40

16,000.00 19,340,640.00
NA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA TOTAL HARGA

( Rp ) ( Rp ) ( Rp )

(5) (6) (7)

16,000.00 47,696,000.00

16,000.00 2,464,000.00

16,000.00 4,100,800.00

16,000.00 3,377,088.00

800.00 3,848,926.40

65,000.00 41,184,000.00

25,000.00 2,500,000.00
NA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA TOTAL HARGA

( Rp ) ( Rp ) ( Rp )

(5) (6) (7)

104,719,000.00

25,000.00 4,427,500.00

40,000.00 9,152,000.00

45,000.00 4,009,500.00

3,250,000.00 58,500,000.00

1,250,000.00 22,500,000.00

1,000,000.00 1,000,000.00

125,000.00 4,500,000.00
NA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA TOTAL HARGA

( Rp ) ( Rp ) ( Rp )

(5) (6) (7)

35,000.00 630,000.00

41,600,000.00

400,000.00 24,800,000.00

350,000.00 8,400,000.00

350,000.00 8,400,000.00

TOTAL A+B 2,423,469,578.90


NA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA TOTAL HARGA

( Rp ) ( Rp ) ( Rp )

(5) (6) (7)

FEE 7,5% 181,760,218.42

GRAND TOTAL 2,605,229,797.32

Semarang, 24 November 2018


Harsono
BOQ
No URAIAN PEKERJAAN Ket Panjang Tebal tinggi qty btg berat/m' Volume
1 Lantai 1
Pekerjaan Persiapan
1 Pek. Pembersihan 18.00 36.00 648.00

Listrik Kerja

Air Kerja
Kemananan

2 Pekerjaan Tanah
Galian Tanah Pondasi 1.50 1.5 1.5 20 67.50

Galian Tanah Sloof 180.00 0.3 0.3 1 16.20

Urugan Tanah Peninggian Peil 396.00 0.3

Pekerjaan Pondasi
Pek. Pondasi Batu Kali 145.00 0.45 0.6

Pek. Pancang 28x28x28 480.00

Pekerjaan Beton
Tbeam 0.5x0.580.7 0.50 0.5 0.7 20

Kolom Pedestal 30x40 0.30 0.4 1.5 20

Rabat Beton Sloof 180.00 0.2 0.05 1

Pek. Beton sloof 20x30 180.00 0.2 0.3 1

Sloof praktis 15x20 68.55 0.15 0.2 1

Kolom Praktis 15/15 1.00 0.15 0.15 48 1.08


4.00 0.15 0.15 45 4.05

Ring praktis 15/20 170.00 0.15 0.2 1

Plat Beton 12mm 415.00 0.12

Pek. Beton Tangga 2.54 1.3 1

Pek Plat atap Beton Pos 4.50 4.5 0.1 2.03

Pekerjaan Dinding
Pasang Dinding Bata 60.00 1 60.00
76.20 3 228.60

Plesteran + Acian

Pasang Dinding Hollow + Kaca 60.00 3.2 192.00

Pas. Dinding Keramik 30x60 28.00 3 84.00

Keramik 20x25 6.00 1.5 9.00


5.10 5.10

Pas. Pengecatan Dinding

Pekerjaan Lantai
Rabat Beton Lantai 12.00 18 0.05 10.80
6.00 6 0.05 1.80
6.00 6 0.05 1.80
3.50 3.5 0.05 0.61

Pasangan Lantai Granit 60x60 12.20 18.2 222.04


6.20 6.2 38.44
6.20 6.2 38.44
1.30 12 15.60
21.71 21.71

Pasangan Keramik 40x40 Pos 3.70 3.7 13.69

Pekerjaan Plafond
Plafond Gypsyme Rangka Hollow 192.25 192.25

Pengecatan Plafond

Pekerjaan Pintu dan Jendela


Pas. Pintu Baja + Kaca 9.20
Pas. Jendela Baja + Kaca 17.28
Pas. Pintu Multiplek Lapis hPL 8.40
Pas. Kusen Alumunium 3" Coklat 51.90
Pas. Pintu Alumunium
Pas. Jendela Alumunium
Pas. Kaca 5mm 217.92

Pek. Baja
Kolom IWF 300 80.00 6.67 7 8 440.4 3,523.20
sumpil 1

Balok IWF 300 180.00 15.00 16 440.4 7,046.40


Balok IWF 250 132.00 11.00 11 355.2 3,907.20

Balok IWF 150 66.00 5.50 6 168 1,008.00

Plat Pedestal 12mm 2 280 560.00

PlatRip dan Sambung 10mm 12mm 3 233 699.00

Bondex 12.00 30 360.00


6.00 5 30.00
Pek. Sanitasi
Pek. Instalasi Air Bersih

Pek. Instalasi Air Kotor

Pek. Saluran Air Hujan 60.00

Pek. Saluran Luar d40cm 127.00

Pas. Kloset Jongkok

Pas. Kloset Duduk

Pas. Wastafel

Pas. Wasbak

Pas. Kran Air

Pas. Floordrain

Pas. Kurasan Bak

Pek. Elektrikal
Pas. Lampu + Instalasi
Pas. Stopkontak + Instalasi
Pas. Saklar + Instalasi
Pas. Panell

Lantai 2
Pekerjaan Persiapan

Pekerjaan Tanah

Pekerjaan Beton
Kolom Praktis 15/15 0.15 0.15 4 102 9.18

Ring praktis 15/20 377.00 0.15 0.2 1 11.31

Plat Meja Beton 0.48

Pekerjaan Dinding
Pasang Dinding Bata 309.00 4
Plesteran + Acian

Pas. Dinding Keramik 20x25 6.60 3 18

Pas. Pengecatan Dinding Eksterior 84.00 4

Pekerjaan Lantai
Pasangan Lantai Keramik 40x40 386.46

Pekerjaan Plafond
Plafond Gypsyme Rangka Hollow 12.00 30
Pengecatan Plafond
Plafond Eksterior GRC 68.00
Lis Plafond gypsume 21.20 18 381.60
76.00 76.00

Pekerjaan Pintu dan Jendela


Pas. Pintu Baja + Kaca
Pas. Jendela Baja + Kaca 70.20

Pas. Pintu Multiplek Lapis hPL 37.80

Pas. Kusen Alumunium 3" Coklat


Pas. Pintu Alumunium
Pas. Jendela Alumunium
Pas. Kaca 6mm

Pek. Baja Atap


Kuda-Kuda CNP 150 216.00 36.00 37 29.7 1,098.90
Gording CNP 125 576.00 96.00 100 27.1 2,710.00
Plan 6mm sepatu 1 140 140.00
Beton 12mm kres dan trakstang 210.00 17.50 18 10.66 191.88
Plat Pedestal 10mm 1 233 233.00
Pengecatan Baja 2
Atap Galvalume 18.00 32 576.00
Pek. Sanitasi
Pek. Instalasi Air Bersih 161.00
Pek. Instalasi Air Kotor 208.00
Pek. Saluran Air Hujan 81.00

Pas. Kloset Jongkok


Pas. Kloset Duduk
Pas. Wastafel
Pas. Kran Air
Pas. Floordrain
Pas. Kurasan Bak

Pek. Elektrikal
Pas. Lampu + Instalasi
Pas. Stopkontak + Instalasi
Pas. Saklar + Instalasi
Pas. Panell
Gran VOL sat 10% VOL RAB PANJANG GRANDp btg bruto

67.50 m3 3.38 70.88


- -
16.20 m3 0.81 17.01
- -
118.80 m3 5.94 124.74
- -
- -
39.15 m3 1.96 41.11
- -
480.00 m1 24.00 504.00
- -
- -
3.50 m3 0.18 3.68
- -
3.60 m3 0.18 3.78
- -
- -
1.80 m3 0.09 1.89
- -
10.80 m3 0.54 11.34
- -
2.06 m3 0.10 2.16
- -
5.13 m3 0.05 5.18

- -
5.10 m3 0.26 5.36
- -
49.80 m3 2.49 52.29
- -
3.30 m3 0.17 3.47
- -
2.03 m3 0.10 2.13
- -
- -
288.60 m2 14.43 303.03
- -
- -
- -
577.20 m2 28.86 606.06
- -
192.00 m2 9.60 201.60
- -
84.00 m2 4.20 88.20
- -
14.10 m2 0.71 14.81
- -
- -
577.20 m2 28.86 606.06
- -
- -
15.01 m3 0.75 15.76
- -
- -
- -
- -
336.23 m2 16.81 353.04
- -
- -
- -
- -
- -
13.69 m2 0.68 14.37
- -
- -
192.25 m2 9.61 201.86
- -
192.25 m2 9.61 201.86
- -
- -
9.20 m2 0.46 9.66
17.28 m2 0.86 18.14
8.40 m2 0.42 8.82
51.90 m1 2.60 54.50
3.00 Bh 0.15 3.15
2 Bh 0.10 2.10
217.92 m2 10.90 228.82
- -
- -
3,523.20 176.16 3,699.36
- - -
- - -
7,046.40 352.32 7,398.72
- -
3,907.20 195.36 4,102.56
- -
1,008.00 50.40 1,058.40
- -
560.00 28.00 588.00
- -
- -
699.00 34.95 733.95
- -
390.00 m2 19.50 409.50
- -
- -
- -
- -
- -
- -
60.00 3.00 63.00
- -
127.00 6.35 133.35
- -
1 0.05 1.05
- -
- -
4 0.20 4.20
- -
4 0.20 4.20
- -
2 0.10 2.10
- -
7 0.35 7.35
- -
5 0.25 5.25
- -
1 0.05 1.05
- -
- -
64.00 3.20 67.20
60.00 3.00 63.00
50.00 2.50 52.50
1 0.05 1.05
- -
- -
- -
- -
- -
- -
- -
- -
9.18 0.46 9.64
- -
11.31 0.57 11.88
- -
0.48 0.02 0.50
- -
- -
- -
- -
- -
1,236.00 61.80 1,297.80
2,472.00 123.60 2,595.60
- -
356.40 17.82 374.22
- -
336.00 16.80 352.80
- -
- -
386.46 m3 19.32 405.78
- -
- -
- -
360.00 m2 18.00 378.00
360.00 18.00 378.00
68.00 m2 3.40 71.40
457.60 m1 22.88 480.48
- -
- -
- -
- -
70.20 m2 3.51 73.71
- -
37.80 m2 1.89 39.69
Bh - -
207.2 M1 10.36 217.56
18 Bh 0.90 18.90
- -
69.69 m2 3.48 73.17
- -

1,098.90 109.89 1,208.79


2,710.00 271.00 2,981.00
140.00 14.00 154.00
191.88 19.19 211.07
233.00 23.30 256.30
4,373.78 437.38 4,811.16
576.00 m3 57.60 633.60
161.00 16.10 177.10
208.00 20.80 228.80
81.00 8.10 89.10
- - -
- - -
18.00 1.80 19.80
18.00 1.80 19.80
18.00 1.80 19.80
18.00 1.80 19.80
- - -
- - -
- - -
62.00 6.20 68.20
24.00 2.40 26.40
24.00 2.40 26.40
1.00 0.10 1.10
btg net
Siku 5x5x5 25.77 4.295 5 22.68 113.4
44 6.22 1.036667 1 14.5 14.5
127.9 11500 1470850