Professional Documents
Culture Documents
9
Format for Trial Mix Design for RCC
Trial No. AD1_1 Time Date 18-Nov-19
RCC Design M15A50 Purpose Roller Compacted Concrete
Vee-bee time Air % 0.0 W/CM Ratio 0.60 FM of Sand
Type & Brand of cement OPC 43 Star Type of Coarse.Aggtt. Crushed RBM
Type of Sand Crushed RBM Type & Brand of Admixture Zentrament
Dose Admixture 0.30% Type & Brand of other chemical
Total Qty of Cementitious Material(kg) 210 CA:FA 73:27
Calcualtion for 1 cum concrete Cement (OPC 43) : 3.14 Sp. Gravity
Material SSD Wt. Vol. /cum Fly Ash : 2.30 Sp. Gravity
Cement 84 0.0268 Chemical Admixture : 1.17 Sp. Gravity
Fly Ash 126 0.0548 Sand (Crushed) : 2.66 Sp. Gravity
Water 126 0.1260 Aggtt. 40-20mm (Crushed) : 2.66 Sp. Gravity
Admixture 0.63 0.0005 Aggtt. 20-10mm (Crushed) : 2.68 Sp. Gravity
Total Volume (Cum) 0.2081 Aggtt. 10-4.75mm (Crushed) : 2.70 Sp. Gravity
Balance Volume (Cum) 0.7919 Fine Aggregate (%) 0.31
Coarse Aggregate (%) 0.69 NA
40-20mm aggregate
SSD Weight of materials 0.25
(Distribution)(%)
20-10mm aggregate
Wt. of 40-20mm aggregate Kg/cum 527 0.19
(Distribution)(%)
10-4.75mm aggregate
Wt. of 20-10mm aggregate Kg/cum 403 0.25
distribution (%)
Wt. of 10-4.75mm aggregate Kg/cum 535
Wt. of Crushedl Sand Kg/Cum 653 Mix Proportions
SSD wt.(Kg) / Free water Adjusted Wt.
Material Temp.oC
Cum
Free Moisture %
(kg) / Cum (kg) 0.03
Cement 84 84.00 2.52
Fly Ash 126 126.00 3.78
Water 126 36.68 89.32 2.68
Crushed Sand 653 3.91 25.55 678.57 20.36
A40-20mm 527 -0.19 -0.99 525.64 15.77
A20-10mm 403 -0.13 -0.52 402.73 12.08
A10-4.75 535 2.36 12.64 547.19 16.42
Admixture 0.630 0.63 0.019
Total Wt. 2454 2454.0853 159.516
Plastic concrete observations Compressive Strength Kg/Cm2
Indv.
Temp Atmosphere (Deg C): D.O. Cast D.O. Test Age (days) Strength Density (gm/cc)
(N/mm2)
Temp Water (Deg C): 18/Nov/19 2 Demoulding
Temp Concrete (Deg C) : 25/Nov/19 7
Vee-bee time (Sec) 16-Dec-19 28
Mix Start time 13/Jan/20 56
Finish time 16-Feb-20 90
Empty Wt. Of Vb mould W1 5.34 16/May/20 180
Wt. of Water + Mould W2 14.3 17-Nov-20 365
Wt. of Water / Volume of Mould
W3 8.96
(W2-W1)
Wt. of Mould + Part Concrete W4 23.95 7 D Normal - 7 D Hot bath - Equt. - 180 D
Wt. of Mould + Part Concrete +
W5 25.11 2-Dec-19 14
part Water
Wt. of Partial Water ( W5-W4) W6 1.16 7 D Normal - 14 D Hot bath - Equt. - 360 D
Wt. of Part Concret (W4-W1) W7 18.61 9-Dec-19 21
Vol. of Part Concrete (W3-W6) W8 7.8
Density of Concrete Kg/Cum
2385.9 Moisture content
( W7/W8)
Moisture
Absorpti
Water %
Water
on %
Total
Free
Absorpti
Water %
Water
on %
Total
Free
Absorpti
Water %
Water
on %
Total
Free
Absorpti
Water %
Water
on %
Total
Free
9
Data observation for setting time of admixture
Type of Mix RCC Name of admixture Zentrament
Type of cement Star Type of admixture Retarder
Trial no. AD-1 Dose of admixture 0.40%
1 6.35
9
Data observation for setting time of admixture
Type of Mix RCC Name of admixture Zentrament
Type of cement Star Type of admixture Retarder
Trial no. AD-1 Dose of admixture 0.50%