Professional Documents
Culture Documents
LSD 021
LSD 021
LVP/MDB/SMDB:MDB CONSULTANT : KAIZEN ARCHITECTS & ENGINEERS LOCATION OF LVP/MDB/SMDB: GROUND FLOOR ELECTRICAL
FLOOR
300A 300/5 CT
MDB-01 4P 35 4C XLPE/SWA/PVC/CU 185 1Cx95 0 52.073 49.913 50.273 152.26 129.421 0 0 1
MCCB METER
300A 300/5 CT
MDB-02 4P 35 4C XLPE/SWA/PVC/CU 185 1Cx95 0 48.413 49.413 49.913 147.74 125.579 0 0 1
MCCB METER
LVP/MDB/SMDB:MDB-01 CONSULTANT : KAIZEN ARCHITECTS & ENGINEERS LOCATION OF LVP/MDB/SMDB: GROUND FLOOR ELECTRICAL
FLOOR
300/5 CT
INCOMER 4P 300A MCCB 35 4C XLPE/SWA/PVC/CU 185 1Cx95 52.07 49.91 50.27 152.26 129.42 1
METER
OUTGOING:
LVP/MDB/SMDB:MDB-02 CONSULTANT : KAIZEN ARCHITECTS & ENGINEERS LOCATION OF LVP/MDB/SMDB: GROUND FLOOR ELECTRICAL
FLOOR
300/5 CT
INCOMER 4P 300A MCCB 35 4C XLPE/SWA/PVC/CU 185 1Cx95 48.41 49.41 49.91 147.74 125.58 1
METER
OUTGOING:
DB-GL TP 63A MCCB 25 4C XLPE/SWA/PVC/CU 16 16 7.85 8.85 9.35 26.05 22.14
SWIMMING POOL TP 200A MCCB 25 4C XLPE/SWA/PVC/CU 95 50 25.00 25.00 25.00 75.00 63.75 30mA-ELCB
FUTURE LOAD TP 80A MCCB 25 12.23 12.23 12.23 36.69 31.19
LANDSCAPE LIGHT TP 80A MCCB 25 4C XLPE/SWA/PVC/CU 10 10 3.33 3.33 3.33 10.00 8.50
40A TP
100mA ELCB 32 Y11 10 2.5 2.5 PUMP ROOM 10 50 500
6
40A TP
100mA ELCB 35 Y12 20 4.0 4.0 CHANGING ROOM 1 200 200
7
TOTAL 26.05 KW
CABLE SIZE : 1X 4C x 16 mm2 Cu /XLPE/SWA/PVC CABLE + 1 x 1C 16 mm2 Cu. G/Y, PVC, ECC
Ex. Fan= Exhaust Fan. Sh. S/O = Shaver Sockt - Outlet. W/M=Washing Machine
D=Dryer. W/H = Water Heater, H/D = Hand Dryer, D/W=Dish Washer. ISO=Isolator.
B+1+G VILLA
PROJECT: LOAD DISTRIBUTION SCHEDULE LOCATION OF DB:
AT FIRST FLOOR
40A TP 30mA
20 Y7 32 6.0 6.0 KITCHEN-01 1 1200 1200
ELCB 4
21 B7 SPARE 0 0
40A TP 30mA
23 Y8 32 4.0 4.0 GATE BARRIER 1 1500 1500
ELCB 5
24 B8 SPARE
40A TP
80 A TP ISOLATOR
28 R10 SPARE
TOTAL 39.60 KW
CABLE SIZE : 1X 4C x 25 mm2 Cu /XLPE/SWA/PVC CABLE + 1 x 1C 16 mm2 Cu. G/Y, PVC, ECC
Ex. Fan= Exhaust Fan. Sh. S/O = Shaver Sockt - Outlet. W/M=Washing Machine
D=Dryer. W/H = Water Heater, H/D = Hand Dryer, D/W=Dish Washer. ISO=Isolator.
PROJECT: G+2 VILLA LOAD DISTRIBUTION SCHEDULE LOCATION OF DB: AT FIRST FLOOR
40A TP
100mA ELCB 20 Y7 20 4.0 4.0 BATH ROOM 1 200 200
4
40A TP
100mA ELCB 23 Y8 20 4.0 4.0 BATH ROOM 1 200 200
5
40A TP
100mA 32 Y11 20 4.0 4.0 CU AT ROOF 1 1200 1500 UVR+TIMER+CONT
ELCB7
33 B11
34 R12 700
40A TP
UVR+TIMER+CO
100mA 35 Y12 32 4.0 4.0 CU AT ROOF 1 2100 700
ELCB8 NT
36 B12 700
37 R13 700
40A TP
100mA 32 4.0 4.0 CU AT ROOF 1 2100
UVR+TIMER+CO
38 Y13 700
ELCB9 NT
39 B13 700
40 R14 700
40A TP
100mA 32
UVR+TIMER+CO
41 Y14 4.0 4.0 CU AT ROOF 1 2100 700
ELCB10 NT
42 B14 700
43 R15 1667
40A TP
UVR+TIMER+CO
100mA 44 Y15 32 6.0 6.0 CU AT ROOF 1 5000 1667
ELCB10 NT
45 B15 1667
TOTAL 33.38 KW
CABLE SIZE : 1X 4C x 16 mm2 Cu /XLPE/SWA/PVC CABLE + 1 x 1C 16 mm2 Cu. G/Y, PVC, ECC
Ex. Fan= Exhaust Fan. Sh. S/O = Shaver Sockt - Outlet. W/M=Washing Machine
D=Dryer. W/H = Water Heater, H/D = Hand Dryer, D/W=Dish Washer. ISO=Isolator.
PROJECT: G+2 VILLA LOAD DISTRIBUTION SCHEDULE LOCATION OF DB: AT SECOND FLOOR
14 Y5
17 Y6
40A TP
100mA 32 Y11 20 4.0 4.0 BATH ROOM 1 200 200
ELCB7
36 B12
40A TP
100mA 38 Y13 20 4.0 4.0 CU AT ROOF 1 1500 1500 UVR+TIMER+CONT
ELCB9
40 R14 700
40A TP
100mA 20 4.0 4.0 CU AT ROOF 1 2100
UVR+TIMER+CO
41 Y14 700
ELCB10 NT
42 B14 700
43 R15 1667
40A TP
UVR+TIMER+CO
100mA 44 Y15 32 6.0 6.0 CU AT ROOF 1 5000 1667
ELCB10 NT
45 B15 1667
TOTAL 31.28 KW
CABLE SIZE : 1X 4C x 16 mm2 Cu /XLPE/SWA/PVC CABLE + 1 x 1C 16 mm2 Cu. G/Y, PVC, ECC
Ex. Fan= Exhaust Fan. Sh. S/O = Shaver Sockt - Outlet. W/M=Washing Machine
D=Dryer. W/H = Water Heater, H/D = Hand Dryer, D/W=Dish Washer. ISO=Isolator.
PROJECT: G+2 VILLA LOAD DISTRIBUTION SCHEDULE LOCATION OF DB:
3Cx6mmXLPE,SWA,ARMUR
1 R1 25 CU-MIAD ROOM 1 1700 1700 UVR+TIMER+CONT
D,PVC,1Cx6mmECC
40A TP
3Cx6mmXLPE,SWA,ARMUR
30mA 2 Y1 25
D,PVC,1Cx6mmECC
CENTRAL KITCHEN 1 2000 2000 UVR+TIMER+CONT
ELCB 1
3Cx6mmXLPE,SWA,ARMUR
4 R2 25 GUEST ROOM 1 2100 2100 UVR+TIMER+CONT
D,PVC,1Cx6mmECC
40A TP
3Cx6mmXLPE,SWA,ARMUR
30mA 5 Y2 25
D,PVC,1Cx6mmECC
DRIVER ROOM 1 1200 1200 UVR+TIMER+CONT
ELCB 2
3Cx6mmXLPE,SWA,ARMUR
6 B2 25 GAME ROOM 1 2100 2100 UVR+TIMER+CONT
D,PVC,1Cx6mmECC
3Cx6mmXLPE,SWA,ARMUR
7 R3 25 PUMP ROOM 1 1200 1200 UVR+TIMER+CONT
100 A TP ISOLATOR
D,PVC,1Cx6mmECC
40A TP
30mA 8 Y3
ELCB 3
9 B3
10 R4 1333
40A TP
4Cx6mmXLPE,SWA,CU UVR+TIMER+CO
30mA 11 Y4 25 GYM 1 4000 1333
,PVC,1Cx6mmECC NT
ELCB 4
12 B4 1333
13 R5 2500
40A TP
4Cx6mmXLPE,SWA,CU UVR+TIMER+CO
30mA 14 Y5 32 PACKAGE-01 1 7500 2500
,PVC,1Cx6mmECC NT
ELCB 5
15 B5 2500
16 R6 2667
40A TP
4Cx6mmXLPE,SWA,CU UVR+TIMER+CO
30mA 17 Y6 32 PACKAGE-02 1 8000 2667
,PVC,1Cx6mmECC NT
ELCB 6
18 B6 2667
19 R7 1000
40A TP 4Cx6mmXLPE,SWA,
30mA 20 Y7 25 CU,PVC,1Cx6mmEC BOOSTER PUMP 1 3000 1000 TP 30mA ELCB
ELCB 7 C
21 B7 1000
22 R8 1000
40A TP 4Cx6mmXLPE,SWA,
30mA 23 Y8 25 CU,PVC,1Cx6mmEC BOOSTER PUMP 1 3000 1000 TP 30mA ELCB
ELCB 8 C
24 B8 1000
25 R9 1000
40A TP 4Cx6mmXLPE,SWA,
30mA 26 Y9 25 CU,PVC,1Cx6mmEC TRANSFER PUMP 1 3000 1000 TP 30mA ELCB
ELCB 9 C
27 B9 1000
28 R10 1000
100 A TP ISOLATOR
40A TP 4Cx6mmXLPE,SWA,
30mA 29 Y10 25 CU,PVC,1Cx6mmEC SOLAR WATER HEATER 1 3000 1000 TP 30mA ELCB
ELCB10 C
30 B10 1000
31 R11 1000
40A TP 4Cx6mmXLPE,SWA,
30mA 32 Y11 25 CU,PVC,1Cx6mmEC SOLAR WATER HEATER 1 3000 1000 TP 30mA ELCB
ELCB11 C
33 B11 1000
3Cx6mmXLPE,SWA,ARMUR
34 R12 20 EXHUST FAN 1 200 200
D,PVC,1Cx6mmECC
40A TP
30mA 3Cx6mmXLPE,SWA,ARMUR
35 Y12 20 EXHUST FAN 1 200 200
D,PVC,1Cx6mmECC
ELCB12
3Cx6mmXLPE,SWA,ARMUR
36 B12 20 EXHUST FAN 1 200 200
D,PVC,1Cx6mmECC
3Cx6mmXLPE,SWA,ARMUR
37 R13 20 EXHUST FAN 1 200 200
D,PVC,1Cx6mmECC
40A TP
30mA 38 Y13 32 4.0 4.0 ROOF 6 200 1200
ELCB13
39 B13
TOTAL 48.00 KW
CABLE SIZE : 1X 4C x 35 mm2 Cu /XLPE/SWA/PVC CABLE + 1 x 1C 16 mm2 Cu. G/Y, PVC, ECC
Ex. Fan= Exhaust Fan. Sh. S/O = Shaver Sockt - Outlet. W/M=Washing Machine
D=Dryer. W/H = Water Heater, H/D = Hand Dryer, D/W=Dish Washer. ISO=Isolator.