You are on page 1of 6

RESUME

AZAD MANI TRIPATHI


RF Engineer (Drive Test and Optimization)
Mobile: WhatsApp No +919198945488, +95 9794594716
E-mail: tripathiazad188@gmail.com

Work Experience Summary - 3.5 Year

Team member involved in GSM/WCDMA system planning and frequency planning (sites for Coverage & Capacity planning)

and having active participation in Drive Test & Network Optimization .

PROJECTS
1) Project:

MPT – HUAWEI PROJECT

Company: TKS Co., Ltd.

Designation: RF Engineer (Drive Test & Optimization)

Tool: TEMS 16.3.3

Duration: 23 OCTOBER 2015 to Till the Date.

Customer: MPT

LOCATION: YANGOON (MYANMAR)

2) Project:

Airtel - Ericsson PROJECT, UP EAST.

Gorakhpur (Show case)

Company: Aerial Telecom Solution Pvt. Ltd.

Designation: RF Engineer (Drive Test & Optimization)

Tool: TEMS 13.O and AZENQOS

Duration: 15 November 2013 to 23 October 2015

Customer: AIRTEL
3) Project:

Airtel - Ericsson PROJECT, UP EAST.

Lucknow (3/11, show case)

Company: Telecom Network Solution Pvt. Ltd.

Designation: RF Engineer (Drive Test & Optimization)

Tool: TEMS 13.O and AZENQOS

Duration: December 2012 to 15 November 2013

Customer: AIRTEL

4) Project:

MTS - Ericsson PROJECT, UP EAST.

Company: Gauri Telecommunications Pvt. Ltd.

Designation: RF Engineer (Customer Support)

Duration: August 2011 to November 2012.

4) Project: Hindustan Times Pvt. Ltd. Lucknow

Designation: Support Engineer


Duration: February 2010 to July 2011

Responsibility

• Checking daily reports of KPI’s and Analyzing the worst performing cells based on high call drop rate(TCH drop),
SD drop rate, Handover success/failure rate, Poor uplink and downlink Quality in Network. To improve the overall
signed KPI’s of the area classes (Urban, suburban & rural).
• Measurement of physical parameter like Latitude, Longitude, Azimuth, Tilt and Configuration
• Primary optimization for verifying existing coverage, sites design objectives, pointing coverage holes.
• Identification of correct Handover Targets for sites on all major traffic arteries.
• Single Site Verification for acceptance and approval of new site
• Neighbor addition between 3G and 2G sites.
• Coordinate with customers to get parameters setting and KPI of existing network
• Reviewing network evaluation report on Frequency Plan provided by customer
• Generate and provide technical presentations to the customer
• Involve detail discussion with RNO team leader and customer for Route definition, Cluster planning, KPIs
acceptance criteria, Drive Test methodology and Initial tuning acceptance procedure
• Responsible to deliver daily project progress and weekly task report
• Analysis of network health reports, CBH & Work on Worst performing Cells.
• Updating BA List.
• EDGE and GPRS Data Drives.
• Analysis of cells with UL & DL limitations and recommending for installation of TMA’S.
• Frequency planning, BSIC planning for new sites and existing sites
• HSR (Handover analysis),Neighbor Addition and Deletions.
• Handling of Network related Customer complaints.
• Co-ordinating with O&M engineer for resolving BTS Hardware related issues.
• Updating Cell wise Tracker using CBH.
• Daily monitoring of cells for TCH Blocking/SD Blocking, Handover Reversals

Drive and Optimization


• Analyzing Interference, Call Drops, Handover failures, Common Pilot Channel Received Signal Code Power ,
Common Pilot Channel Interference Ec/No, Scrambling Code.
• Performing drive test and post processing of drive test data and performance analysis of each site and tuning of
each site after drive test analysis using MapInfo/MCOM tools for drive test route planning, data analysis, neighbors
list defining.
• Responsible for performing pre-drive test and post drive- test for New sites, BSC migration.
• Optimizing neighbor list, Handover control, RF parameter and frequency retuning.
• Generating Coverage plots, C/I plots, Rx Quality plot and reports generation for the customer presentation.
• Analyzing drive plots and log files of different sites and planning to overcome those issues which are collected on
log files.
• Monitoring some parameters of KPI’s (HSR, TCH Blocking, SD Blocking) and planning to keep those values with in
Bench Marks.
• Planning Frequency for New Sites maintaining minimum interference (C/I and C/A) in the existing network.

BTS KNOWLEDGE

• Checking of IDB H/W Problem of Ericsson RBS (2964, 2954, 2111, 2204, 2206)
• Monitoring MO Fault Maps, Diversity, IDB inconsistency, Rx Path imbalance.
• Complete Knowledge about Connectors, antenna, Cable routing (site auditing for quality).
• VSWR measurement and Distance to fault measurement.

• Clearing Punch points(cable labelling,connectors,water proofing)


Tools/Software used
TEMS 13.1.2
TEMS 8.1.3
TEMS 15.3.4
TEMS 16.3.3
MapInfo Professional 8.5.
MCOM
X-cal w p 3.2.11, XCAL-M
OMT R34_9
MIPT, MAPINFO2GOOGLE
GOOGLE EARTH
NET MONITOR

ACADEMIC QUALIFICATION:

Percentage/
Name of Institution/Board/University Year of Passing
CGPA/Div.
Graduation(B.C.A) Lucknow University 2009 69%
Nehru Academy, Gorakhpur
HSC(10+2 2006 68%
(U.P Board)
National Bal Mandir, Gorakhpur
SSC(10th) 2004 73%
(U.P Board)

Operating System

• W INDOWS 98, Windows NT, Windows 2000server/Professional, Windows XP professional and


Windows 2003 Server.

I.T.Skills

• Good command over Excel, Microsoft word & Power Point.


• Good command over internet, mailing & browsing.
• Good command on Data handling

PERSONAL PROFILE:

• Hobbies/ Interests : Meeting new peoples and communicating with them.


Travelling, Movies, Songs.
Name - Azad Mani Tripathi
Father name - Ramachari Mani Tripathi
Date of Birth - 01/07/1989
Sex - Male
Marital Status – Unmarried
Corresponding Address - E-1/128, Sector-B Aliganj, Lucknow
Pin Code 226024
Passport No - L2759457
I hereby confirm that the information furnished in this form is true and correct.

Date:
Place:

(AZAD MANI TRIPATHI)


I hereby confirm that the information furnished in this form is true and correct.

Date:
Place:

(AZAD MANI TRIPATHI)

You might also like