Professional Documents
Culture Documents
Team member involved in GSM/WCDMA system planning and frequency planning (sites for Coverage & Capacity planning)
PROJECTS
1) Project:
Customer: MPT
2) Project:
Customer: AIRTEL
3) Project:
Customer: AIRTEL
4) Project:
Responsibility
• Checking daily reports of KPI’s and Analyzing the worst performing cells based on high call drop rate(TCH drop),
SD drop rate, Handover success/failure rate, Poor uplink and downlink Quality in Network. To improve the overall
signed KPI’s of the area classes (Urban, suburban & rural).
• Measurement of physical parameter like Latitude, Longitude, Azimuth, Tilt and Configuration
• Primary optimization for verifying existing coverage, sites design objectives, pointing coverage holes.
• Identification of correct Handover Targets for sites on all major traffic arteries.
• Single Site Verification for acceptance and approval of new site
• Neighbor addition between 3G and 2G sites.
• Coordinate with customers to get parameters setting and KPI of existing network
• Reviewing network evaluation report on Frequency Plan provided by customer
• Generate and provide technical presentations to the customer
• Involve detail discussion with RNO team leader and customer for Route definition, Cluster planning, KPIs
acceptance criteria, Drive Test methodology and Initial tuning acceptance procedure
• Responsible to deliver daily project progress and weekly task report
• Analysis of network health reports, CBH & Work on Worst performing Cells.
• Updating BA List.
• EDGE and GPRS Data Drives.
• Analysis of cells with UL & DL limitations and recommending for installation of TMA’S.
• Frequency planning, BSIC planning for new sites and existing sites
• HSR (Handover analysis),Neighbor Addition and Deletions.
• Handling of Network related Customer complaints.
• Co-ordinating with O&M engineer for resolving BTS Hardware related issues.
• Updating Cell wise Tracker using CBH.
• Daily monitoring of cells for TCH Blocking/SD Blocking, Handover Reversals
BTS KNOWLEDGE
• Checking of IDB H/W Problem of Ericsson RBS (2964, 2954, 2111, 2204, 2206)
• Monitoring MO Fault Maps, Diversity, IDB inconsistency, Rx Path imbalance.
• Complete Knowledge about Connectors, antenna, Cable routing (site auditing for quality).
• VSWR measurement and Distance to fault measurement.
ACADEMIC QUALIFICATION:
Percentage/
Name of Institution/Board/University Year of Passing
CGPA/Div.
Graduation(B.C.A) Lucknow University 2009 69%
Nehru Academy, Gorakhpur
HSC(10+2 2006 68%
(U.P Board)
National Bal Mandir, Gorakhpur
SSC(10th) 2004 73%
(U.P Board)
Operating System
I.T.Skills
PERSONAL PROFILE:
Date:
Place:
Date:
Place: