You are on page 1of 5

NAWAZISH ALI KHAN

Postal Address: House No NW285/NW1028 Dhoke Khiloo Muree Road Rawalpindi


Permanent Address: Gilgit Baltistan P/O Sassi Haramosh Village Hanuchal
Mob: +923450020639
WhatsApp: +923153253579
Email: nawazish.dia@gmail.com
Skype ID: nawazish.dia2
CNIC# 71501-5092082-7
Passport #: FL4130821
Nationality: Pakistan

OBJECTIVE

To Serve and Learn.


EXPERIENCE
Designation: RF Engineer

Total Experience: 5Years


Working in NOKIA/SCT at Telenor ODS Project(PAC Clusters).

Worked in NOKIA/LCC at Telenor(MS/NPM Project).

Worked in Smart Cube Technologies (SCT) at Telenor, ZTE (MS/NPM), Project South
1and Moblink Rollout Central Region

Worked in TURNOTECH, TELENOR/ NSN at (IOBM) Project Nationwide, Ufone


Huawei 3G Rollout, Enigma (U 900), Swap and Zong Alcatel 3G Roll Out Projects
Central Region.

Worked in Gul Jan and Sons Moblink/ZTE Swap Multan.

3 Years teaching (SSC and HSSC Level).

Responsibilities:

Optimization

 Monitoring and improvement of degraded KPI


 Analyzing the rejected reports , recommendations to increase coverage and quality of
degraded KPI
 Escalating any suspected HW issues
 Prepare and release the report for the newly integrated site with the observations and
recommendations. Ensuring that new sites are smoothly integrated into the network.
 Proper Co-ordination with other depts. like NOC, Field service on the basis of daily
performance statistics and network availability, Drive Tests & RF Audit, whenever
necessary.
 Recommendation for network to improve poor Performance area and coverage holes
 Performing drive test analysis, suggesting physical changes on antennas,
electrical/mechanical tilts and azimuth as well as parameter tuning in order to improve
the network performance (Drop calls, HO fails , Pilot Pollution, RSCP/EcNo, cell
overshooting, Poor Coverage).
 Weekly progress report to customer
 Update all Pre-Launch Trackers.
 Customer meetings – working closely with customer to resolve all issues involving
their help

 Coordination/Post Processing
 Documenting report of Cluster Drives using TEMS Discovery/MapInfo/Nemo
analyzer
 Post Processing of 4G,3G and 2G Log files using TEMS Discovery/MapInfo
 Documenting report of 4G/3G /2G SSV using TEMS Discovery/MapInfo
 Documenting report of coverage sites (Split Cell, IBS etc.) Pre and Post.
 Resolving Customer Complain and Prepare Report.
 Documenting report of,B2B survey
 Coordination with DT Teams
 Daily Performance report and activity plan
 Resolving DT kit issues

 Walk Test (Customer Complaints) 4G/3G/2G using TEMS 16.3.6/GENEX Probe


3.15
 Voice calls/CSFB Testing
 Data throughputs(3G,4G)
 Verifying Handovers (indoor, outdoor).
 Analyzing log files and related issues.
 Femto device (VOIP)testing at no service area
 Cell fie device testing
 Repeater Testing
 Optimization patches to improve quality and coverage

 Cluster Drives
 IOBM (Benchmark)
 Scanning (PCTEL EX)
 Split Cell Testing
 Spectrum Analyzer
 Monitoring retainability and accessibility of network through short calls and long calls.
 Monitoring throughput (HSPA) , R99
 Verifying handovers (soft , softer ,IRAT)
 Trouble shooting
4G /3G SSV Drive Testing using TEMS 16.3.6(ASCOM)/GENEX Probe 3.15
 Sectors Swap testing
 Voice call testing/CSFB Testing
 SMS testing
 R99 test
 Data Testing’s
 Verifying CS IRAT(3G to 2G)
 Verifying soft handover, Softer handover
 Monitoring Events , PSC, RSCP, Ec/No , CQI , of 3G sites during DT
 Identifying Pilot pollution, RTWP, Handover Failures, antenna orientation, tilts and
antenna heights.
 Performing site audit (M-Tilt, E-Tilt and antenna azimuth).

 2G SSV Drive Testing using TEMS 8.0.3 (ASCOM)

 Identifying Sector Swap and Partial Swap


 TRX Testing
 Verification of planning data during the drive test e.g. MA list, HSN, BCCH
 Intra handover, Inter handover.
 EDGE and GPRS Testing and check over RLC Throughput (downlink &
Uplink), Time Slots and Coding Scheme.
 SSV of Pico sites.
 Responsible for verification of coordinates, physical audit.
 Identification of faults and issues during the drive test e.g. sector swap
 Making the thematic of the collected log files in MapInfo Professional for further
analysis after the drive test.
Worked in TURNO TECH as Trainee Engineer
 Learn 2G, 3G DT parameters.
 Learn Site Audit.

 Software’s and Related Tools


 NetAct
 TEMS Version 8.0 , 14.0.2 , 15.2.1 ,16.2.1,16.3.3,16.3.6
 Map Inf0 Version 10.0 , 11.0 , 12
 NEMO Outdoor
 Easy Map Downloader
 Microsoft Office/Word
 SnagIt

 Other Skills
 Team Lead
 Can adjust in every atmosphere
 Handling Work load
 Management

EDUCATION

Degree Institute/Board Year Division


ME Telecommunication NED Karachi 2019 Waiting for
Engineering Result
B.S Telecommunication SSUET,karachi 2013 1 Division
st

Engineering
Intermediate FBISE Islamabad 2009 1st Division
Matriculation FBISE Islamabad 2006 1st Division

FINAL YEAR PROJECT

Implementation of image processing algorithms on FPGA.

INTERESTS

Reading Books Swimming

Internet Surfing

REFERENCES

Will be furnished as desire

You might also like