HPCL-Mittal Energy Limited
Guru Gobind Singh Refinery, Bathinda
SOP for Start-up & Shut Down of Boiler Feed Water Pump
2x300 TPH CFBC BOILER.
9112-575-0PR-704-00050 Rev:01
O&M By:
801 LEI~S
HEAVY ENGINEERING LTD
ISSU E
REV STATUS PREPARED REVIEWED CHECKED APPROVED CONCURRED
DATE
This document is confidential. Neither the whole nor any part of this document may be disclosed to any third party without the prior written con sent of HPCL·
MITT AL ENERGY LTD . The copyright of this document is vested in HPCL-MITT AL ENERGY LTD. All rights reserved . Neither the whole nor any part of this
document may be reproduced , stored in any retrieval system or transmitted in any form or by any means (electronic, mechanical , reprographic, recording or
otherwise) without the prior written consent of the copyright owner.. Format No, 9111·000-PCT -007 -00006 Rev-OO
HPCL-Mittal Energy Limited Revision 01
--_._---
Issue Date 23/06/2018
SOP for Start-up & Shut down of Boiler Feed Water Pumps
Next Review 23/06/2019
2X300 TPH CFBC Boiler
HMEL Page 2 of 24
9112·575·0PR· 704 ·00050
----- - -----
Note:
The Owner of this Document is Department OPERATION at BATHINDA_ Please Contact AGM 1 OPERATION Manager- for any clarifications,
I Updates or Revisions.
I
,- ~------ - ~"----- ------ ------- - --------------
HPCL-Mittal Energy Limited Revision 01
SOP for Start-up & Shut down of Boiler Feed Water Pumps Issue Date 23/06/2018
Next Review 23/06/2019
"
2X300 TPH CFBC Boiler
HMEL Page 3 of 24
9112·575·0PR· 704 ·00050
S. No. DESCRIPTION
1 Purpose
2 Scope
12 Performance indicators 19
13 Records
14 Change Register
The purpose of this procedure is to ensure the safestartup& Shut downof Boiler
feedpumps.
2. Scope:
a) The Operation Manager is responsible for the maintenance and Job cyclic review of
this procedure.
b) The Shift in Charge is responsible for execution all operation activity as per the
procedure.
c) Shift In charge will inform and take approval from Operation Manager for any
deviations in procedure.
d) The Assistant Shift In charge is responsible for execution the procedure through Field
engineer and shall personally reconfirm all the line-up are correct and as per
prescribed checklist.
a) -Motorola Communication Set for field Engineer, Control room Engineers, Assist.
Shift In charge and shift in charge for proper communication with Field Engineerl
Operator and DCS.
b) Mandatory PPE'S like Helmet, Full Cover, Hand gloves, Goggles, safety shoes, Ear
plug, Safety Belts.
c) Proper size of F-Key for opening the valves, if required.
d) Torch lights (24V DC) as per required standard.
5. Safety Precautions:
• Only trained and authorized personnel will carry out the activity.
• Before performing the activity, all work permits shall be cancelledl closed, system to
be normalized.
• Shift In-charge on duty during the progress of work should be fully aware of the
activities being carried out.
• All jobs shall be well planned prior to execution.
• Before clearing the work permit, inform all personnel who are involved in activity.
• Verify all piping, guards and instrument connections are made before starting the
activity.
• Verify that all valves, controls, trip mechanisms and safety devices are in good
operating condition.
HPCL-Mittal Energy Limited Revision 01
Issue Date 23/06/2018
SOP for Start-up & Shutdown of Boiler Feed Water
Next Review 23/06/2019
® Pumps2X300 TPH CFBC Boiler
HMEL Page 50f24
9112·575·0PR·704 -00050
• All interlocks & protections are in service, if any deviation, risk assessment &
necessary approval to be taken.
• Before initial charging, after maintenance or after an extended shutdown, ensure
leak check & purge has been done by nitrogen gas & all blinds have been removed
from the lines, which were provided for isolation.
6.2 Health:
51 No. Hazard Precaution ACTION BY
1 Ergonomics - Use standard valve keys. FE
Operating of valves Use hand gloves while operating
can result in back valves.
injury, injury to arms Use ladder, platform or stand for
operating valves at height.
2 Heat stress & Immediately shift victim under the FE
dehydration shed.
Take rest & drink plenty of water.
ORS may be provided if more
dehydration felt.
6.3 Environment:
S.No. Hazard Precaution ACTION BY
1 Water Ensure all the area is FE
Spillage paved.
LABEL DEFINITIONS
DANGER:
DANGERS alert you to an immediate hazard that causes serious injury or death and
requires special Precautions to be taken
CAUTION:
CAUTION alert you to a potential hazards that causes serious damage to equipment!
Pro ert under certain condition
WARNING:
WARNING alert you to a potential hazard that causes serious injury or death under
certain condition
I NOrQ NOTE:
Note emphasize or remind you of an important place of information
Abbreviation:
BFP: Boiler Feed Pump
FE: Field Engineer
CRE: Control Room Engineer
ASIC: Assistant Shift In-charge
SIC: Shift In-charge
A boiler feedpump is used to pump the feed water from De-aerator or FWST to a
steam drum in boiler.
9.1 Startup & Shut down Procedure for Boiler Feed pump-A
For AOP:
""-"
--- ---~~-~
Safety Interlock
Alarm
51. No. Description TAG No. Value Trip Value
1 Motor Winding Rl phase Temperature 14TI0301A 110 120° C
2
--------"
Motor Winding R2-phase Temperature 14TI0302A 110 120° C
--"
3 Motor Winding Vi-phase Temperature 14TI0303A 110 120° C
4 Motor Winding V2-phase Temperature 14TI0304A 110 120° C
5 Motor Winding Bl-phase Temperature 14TI0305A 110 120° C
6 Motor Winding B2- phase Temperature 14TI0306A 110 120° C
7 Motor Non Drive end Bearing Temperature 14TI0308A 95 105° C.
8 Motor Non Drive end Bearing Temperature 14TI03088 95 105° C.
9 ' Motor Drive end Bearing Temperature 14TI0307A 95 105° C.
10 Motor Drive end Bearing Temperature 14TI03078 95 105° C.
Pump Drive end Radial Bearing Temperature
11 14TI0309A 80 90 0 C
Transmiter-1
I
Pump Drive end Radial Bearing Temperature I
12 14TI0310A 90 100 0 C
Transmiter-2
Pump Drive end LHS Thrust Bearing
13 14TI0311A 90 1000 C
Temperature Transmiter-1
Pump Drive end LHS Thrust Bearing
14 14TI0311B 90 1000 C
Temperature Transmiter-2
15
i Pump Drive end RHS Thrust Bearing 14TI0312A 90 1000 C
I Temperature Transmiter-1
Pump Drive end RHS Thrust Bearing
16 14TI0312B 90 1000 C
Temperature Transmiter-2
Pump Non-Drive end Radial Bearing
17 14TI0313A 90 1000 C
Temperature Transmiter-1
--
HPCL-Mittal Energy Limited Revision 01
Issue Date 23/06/2018
SOP for Start-up & Shut down of Boiler Feed Water
Next Review 23/06/2019
® Pumps2X300 TPH CFBC Boiler
HMEL 9112·575·0PR-704 -00050 Page 8 of 24
9.2 Pre-checks:
S ACTION BY
DESCRIPTION
No FE CRE SIC
01 Ensure no work permit should be pending from any department.
2 Ensure that the cooling water pressure is above 3 kg/cm2. ~ ~
Observe the Cooling water floats in the view glass for flowing of ~
14
water.
Ensure that the Lube oil AOP suction valve (14-GTV-2808) &
15 MOP Discharge valve (shaft driven) (14-NV-2804) is in open ~
condition.
Ensure that the Lube oil AOP discharge valve (14-GTV-2015) &
16 MOP Discharge valve (shaft driven) (14-GTV-2011) is in open ~
condition.
Ensure that the header (14-GTV-0321) spray water attemperator ~ ~
17
valve will be closed.
Ensure that the (14-GTV-0368, 03150) (Bypass), (14-GTV-
18 03142/03151) (Bypass) valve Towards UB04 Existing feed water ./
discharge header valves will be closed.
Ensure that the SWAS line valves (14-GLV-03120, 03124) are ~
19
closed.
HPCL-Mittal Energy Limited Revision 01
Issue Date 23/06/2018
SOP for Start-up & Shut down of Boiler Feed Water
Next Review 23/0612019
Pumps2X300 TPH CFBC Boiler
HMEL Page 100f24
9112·575·0PR·704 ·00050
S ACTION BY
DESCRIPTION
No FE CRE SIC
Start the lube oil heater-(575-14-E-001) for initially raising of ./
1
the oil temp keeps the Heater in auto.
2 Ensure that the lube oil temperature above 420 C ./ ./
3 Ensure that the AOP (575-14-PM-011) is selected.manual. ./
Ensure that the AOP Emergency local push button is ./
4
released from Local.
After ensuring all the above conditions, start the (AOP 575- ./
S
14-PM-011) from DCS.
Ensure that the discharge lube oil pressure (14-PI-2802) is ./ ./
6
>5 kg/cm2.
Ensure that the Lube oil header pressure - (14-PT-2806 A, ./ ./
7
B, C) is 2 kg/cm2.
Ensure that the Lube oil (DP-14-PDT-2807) is normal like ./
8
below 0.5 kg/cm2,
9 Check for any lube oil leakages in the lines, flanges. ./
Check the view glasses for oil flow through the bearings ./
10
stuffing box.
Charge AOP oil cooler if the lube oil temperature goes ./ ./
11
above 450 C
S ACTION BY
DESCRIPTION
No FE CRE SIC
Open the BFP-A Casing drain valve (14-GTV-2612), Ensure that
1 the water is coming, in case when the De-aerator is not in charge ./
condition. Close the Casing drain valve (14-GTV-2612).
12 After attaining the BFP-A full RPM, Open the MOP priming valve ../
(14-NV-2807) for priming of the Shaft driven pump (MOP 575-14- ../
13
P-01O.)
Observe the Shaft driven MOP Discharge Pressure (14-PT-2804) ../ ../
14
if the pressure is above 5kg/cm2.
l~5__ (575-14-PM-011).
Close the priming valve (14-NV-2807); stop the Motor Driven AOP ../
Observe the Oil pressure will be maintained by BFP-A Shaft driven ../ ../
I 16 pump MOP.
17 Keep the Motor Driven AOP (575-14-PM-011) in Auto. ../
Open the BFP Discharge valve Bypass MOV-(14-MOV-0302),
after full opening of bypass MOV, open the Discharge Main MOV- ../
18
(14-MOV-0301), after full opening of Main MOV, and close the
Bypass MOV.
Check the vibrations of Motor & Pump and the bearing ../
19
temperatures.
-
Ensure that no abnormal sound, heating of bearings, water ../
, 20
I leakage from any flange jOints & glands.
Note down the Suction pressure, Minimum Recirculation line ../ ../
21
pressure, suction DP, Discharge Pressure.
22 If any abnormality found stop the Boiler Feed pump-A. ../
We can Charge the UB05, UB06 Feed water lines based on the ../ ../
23
requirement.
Observe the Motor winding Temperatures if the temperatures are ../ ../
24
increasing then check the motor cooling fan arrangement.
After ensuring all healthiness of BFP - A parameters & normalizing
the drum level of UB05 or UB06, Open the Feed Water ../ ../ ../
25
Interconnecting valve of CFBC & CPP after communication with
---
STEAG CRE & SIC
HPCL-Mittal Energy Limited Revision 01
Issue Date 23/06/2018
SOP for Start-up & Shut down of Boiler Feed Water
Next Review 23/06/2019
® Pumps2X300 TPH CFBC Boiler
HMEL Page 12 of 24
9112-575·0PR-704 -00050
S ACTION BY
DESCRIPTION
No FE CRE SIC
9.7SHUT DOWN:
S ACTION BY
DESCRIPTION
No FE CRE SIC
Close the Discharge MOV-(14-MOV-0301) by ensuring the feed ./
1
water requirement in the Boilers.
9.9 Pre·checks:
5 ACTION BY
DESCRIPTION
No FE CRE SIC
1 Check the Free rotation of the Pump and motor shaft. ./ ./
2 Ensure that the cooling water pressure is above 3 kg/cm2. ./
All main supply cooling water inlet valve (14-GTV-2630) & outlet valves- ./
3
(14-GLV-2629) are in open condition.
Cooling water inlet valves (14-GTV-2622, 14-GTV-2616) is in open ./
4
condition.
Ensure that the De-aerator air vents valves (14-GTV-0241, 0242, 0280, ./ ./
6
and 0281) are in open condition.
Ensure that the corresponding BFP-A suction valve-(14-GTV-0331, 14- ./ ./
7
GTV-0332) is in open condition.
HPCL-Mittal Energy Limited Revision 01
SOP for Start-up & Shut down of Boiler Feed Water Issue Date 2310612018
Next Review 2310612019
Pumps2X300 TPH CFBC Boiler
HMEL 9112·575·0PR·704 -00050 Page 16 of 24
14 Observe the Cooling water floats in the view glass for flowing of water. ./
Ensure that the Lube oil AOP suction valve (14-GTV-2829) & MOP ./
15
suction valve (shaft driven) (14-GTV-2825) is in open condition.
Ensure that the Lube oil AOP discharge valve (14-GTV-2837) & MOP ./
16 ./
Discharge valve (shaft driven) (14-GTV-2833) is in open condition.
18 Ensure that the SWAS line valves (14-GLV-03120, 03124) are closed. ./
A uXllary
T 0'1I pump-startsup:
S ACTION BY
DESCRIPTION
No FE CRE SIC
1 Ensure that the AOP (575-14-PM-013) is selected manual. ./
Ensure that the Pump Emergency push button released from ./ ./
2
Local.
After ensuring all the above conditions, start the AOP (575-14-PM- ./
3
013) from DCS.
Start the lube oil heater-(575-14-E-002) for initially raising of the oil ./
4
temp keep the Heater in auto.
5 Ensure that the lube oil temperature above 420 C. ./
Ensure that the discharge lube oil pressure (14-PI-2809) is >5 ./ ./
6
kg/cm2.
Ensure that the Lube oil header pressure-(14-TI-2808A. B, C) is 2 ./ ./
7
kg/cm2.
Ensure that the Lube oil DP (14-PDT-2814) is normal like below ./
8
0.5 kg/cm2.
9 Check for any lube oil leakages in the lines, flanges. ./
HPCL-Mittal Energy Limited Revision 01
Issue Date 23/06/2018
SOP for Start-up & Shut down of Boiler Feed Water
Next Review 23/0612019
® Pumps2X300 TPH CFBC Boiler
HMEL Page 17 of 24
9112·575·0PR·704 ·00050
Check the view glasses for oil flow through the bearings stuffing
box.
t rt up:
9118 01'I er f ee d pump- B sa
S ACTION BY
DESCRIPTION
No FE CRE SIC
Open the BFP-B Casing drain valve (14-GTV-2627), Ensure that the
1 water is coming, in case when the De-aerator is not in charge ./
condition. Close the Casing drain valve (14-GTV-2627).
In case when the De-aerator is charging condition, leave the Casing
drain valve (14-GTV-2627) open for some time for uniform heating of ./
2
casing. Close the Casing drain valve (14-GTV-2627) after attaining
the temperature.
3 Release the Emergency push button from the field. ./
4 Ensure that the BFP-B (575-14-BFPM-002) is selected manual. ./
5 Ensure that the BFP-B start permissive OK. ./
6 Ensure that the BFP-B Safety interlock OK. ./
7 Ensure that the BFP-B Process interlock OK. ./
Ensure that the BFP-B Discharge valve MOV-(14-MOV-0303, 4) is ./ ./
8
closed.
9 Start the BFP-B, and note down the shut off pressure. ./
10 Observe that any abnormal sound in the field. ./
11 Observe that the BFP-B starting Current in Amps, ./ ./
After attaining the BFP-B full RPM, Open the MOP priming valve (14- ./
12
NV-2828) for priming of the Shaft driven pump MOP (575-14-P-012).
Observe the Shaft driven outlet Pressure (14-PT-2811), if the
13 pressure is above 5kg/cm2, stop the Motor Driven AOP (575-14-PM- ./
013).
Close the priming valve (14-NV-2828); stop the Motor Driven AOP ./ ./
14
(575-14-PM-013).
Observe the Oil pressure will be maintained by BFP-B Shaft driven ./
15
pump.
16 Keep the Motor Driven AOP (575-14-PM-013) in Auto. ./ ./
Open the Discharge valve Bypass (MOV-14-MOV-0304), after full
17 opening of bypass MOV, open the Discharge Main (MOV-14-MOV- ./
0303), after full opening of Main MOV, and close the Bypass MOV.
18 Check the motor & pump vibrations and the bearing temperatures. ./
Ensure that no abnormal sound, heating of bearings, water leakage ./
19
from any flange joints & glands.
Note down the Suction pressure, Minimum Recirculation line ./
20
pressure, suction DP Discharge Pressure.
21 If any abnormality found stop the Boiler Feed pump-A. ./ ./
We can Charge the UB05, UB06 Feed water lines based on the ./
22
requirement.
Observe the Motor winding Temperatures, if the Temperatures are
23 increasing, open the Cooling water inlet & outlet valves of BFP-B ./ ./
Motor.
After ensuring all healthiness of BFP - B parameters & normalizing ./ ./ ./
24
the drum level of UB05 or UB06, Open the Feed Water
HPCL-Mittal Energy Limited Revision 01
SOP for Start-up & Shut down of Boiler Feed Water Issue Date 23/06/2018
Next Review 23/06/2019
® Pumps2X300 TPH CFBC Boiler
HMEL 9112·575·0PR·704 -00050 Page 180f24
9.12Shut down:
S ACTION BY
DESCRIPTION
No FE CRE SIC
Close the Discharge (MOV-14-MOV-0303) by ensuring the feed ..r
1
water requirement in the Boilers.
2 Ensure that the Motor Driven AOP (575-14-PM-013) is in Auto. ..r
Maintenance Mode Logic has been implemented as when any BFP A
or B goes for maintenance & its AOP is to be stopped in that case
3 before stopping the AOP activate its maintenance mode so that when
AOP is stopped its RTS will be unhealthy in that case any existing
BFP of CPP will not start in Auto mode.
After ensuring the safe activation of maintenance mode go for
4
stopping of BFP-A
5 Stop the BFP-B (575-14-BFPM-002). ..r
After stopping the BFP-B Priority Selection to be done as per
6
discussion with STEAG SIC
After stopping of the BFP-B ensure that the Motor driven AOP
7 (AOP575-14-PM-013) starts, & maintain the Lube oil pressure if BFP- ..r
B to be taken in Auto mode.
Open the Vent & Drain Valve of water box to drain out all water inside ..r
2
the tube & chamber
Full Open the Cooling water Outlet Valve. (Inlet valve will remain ..r
3
Close)
Crack open the Vent & Drain. Flush the Cooling water through Stan ..r
4
By Cooler 15 Min.
5 Observe the Water quality coming out from Vent & Drain. ..r
6 Inform the cooling water quality to CRE and SIC. ..r
After 15 Min flushing of Cooler Close Cooling Water Out let Vlv of ..r
7
stand By Cooler.
8 Charge the Cooler from cooling water Inlet V/v. ..r
Crack open the Vent & Drain for removal of Trapped Air through Vent ..r
9
& Drain.
10 Ensure the complete Trapped Air released from Cooler. ..r
HP L-Mittal Energy Limited Revision 01
Issue Date 23/06/2018
SOP for Start-up & Shut down of Boiler Feed Water Pumps
Next Review 23/06/2019
"
2X300 TPH CFBC Boiler
HMEL 9112·57 5·QPR· 704 ·00050 Page 19 of 24
I~·-
!I 11
1---
J~ -
--
Full Open the Cooling Water Out Let Vivo
Open Inlet & Outlet Cooling water line & after proper venting close
./
./
12
the vent
13 Inform the Status of Backwash to CRE & SIC. ./
I~
ACTION BY
DESCRIPTION
No FE CRE SIC
I~- Shift
charge
In
Degree/Diploma
7-12 years On
training
job Yearly
13. Record:
HPCL-Mittal Energy limited Revision 01
Issue Date 23/06/2018
SOP for Start-up & Shut down of Boiler Feed Water
Next Review 23/06/2019
® Pumps2X300 TPH CFBC Boiler
HMEL Page 20 of 24
9112·575·0PR·704 -00050
Field Log sheet, Log book.
SOP for Start-up & Shut down of Boiler Feed Water Issue Date 23/06/2018
Next Review 23/06/2019
® Pumps2X300 TPH CFBC Boiler
HMEL 9112·575·0PR·704 -00050 Page 21 of 24
SOP for Start-up & Shut down of Boiler Feed Water Issue Date 23/06/2018
Next Review 23/06/2019
® Pumps2X300 TPH CFBC Boiler
HMEL 9112·575·0PR·704 -00050 Page 23 of 24