On November 11, 2019 (Monday) the educational plant tour of the BS mechanical
Philippines campus. The transportation is divided by 4 buses and 2 vans and each has
1 professor/advisor and 3 tour guide speaker. The day started with a tocilog breakfast
on board at 4am and a snack of monde mammon together with 1 bottle of water
(summit). Well it is not bad I should say to start a morning since it will be a long trip from
Manila to Bataan.
We arrive at Bataan nuclear power plant at 9 in the morning. It started with orientations
about safety and a brief history of the place. They introduce the different energy source
for renewable energy like the solar power plant, biomass energy, wind turbine,
geothermal energy, and the hydroelectric energy and for non- renewable energy are the
coals, natural gas, fossil fuel, and of course the nuclear energy which is their specialty.
They use uranium as their fuel and did you know that 1 pellet of this is can produce
300kw of power consumption that can light a single house for 8 months. The program
started in 1958 with the creation of the PAEC under republic act 2067 under the regime
of martial law, former Philippine president Ferdinand Marcos in July 1973 announces to
build a nuclear power plant. But the plant never opened due to issues regarding
corruption and safety, compounded by the fear following the Chernobyl disaster in 1986.
It was so compelling to know how much money wasted about this project and also the
TERMINAL CORP. this is where the majority of the cargos in subic went it is just a brief
introduction and we haven’t experience a tour inside due to their busy work at that time.
5pm departure and check in to VISTA VERDE 6pm manage buffet for dinner then
The day started at 4am wakeup call followed by 5am manage buffet for breakfast and
6am departure to pangasinan. The first stop of the tour was on pepsi cola products
Philippines. We’ve been oriented with some safety procedure before we start, first is the
pedestrian lane that you should follow to avoid getting in the way of the forklifts, second
is the dock, cover,and roll in case of earthquakes, they also introduce their evacuation
area just in case and their proper attire before you proceed to their working area like the
hairnets and ear plugs. The whole process in their vicinity is about recycling where they
are using the used bottles after rinsing. The first process is by supplying the bottles that
to be recycle on their warehouse then it will be sorted according to their brands and
types, next is uncasing, and then the pre-feeding inspection where the recycled bottle is
been checked if it is defective or if is still can be refilled, next is the bottle washing to
remove impurities, then another round for inspection but this time is using the electronic
bottle inspection, then if it passed through the inspection it will be sent to filling section
to refill the bottle, and then sealing, coading, fullinspection, casing then palletizing.
Due to the frequent power interruption in early 1990s the TARLAC POWER PLANT
CORP was introduced It was decided to put up a 30 megawatts power plant to offset
such scenario.It was registered with the securities and exchange commissions on
November 1993. It is a 9 hectare lot located at brgy. Sto. Nino, tarlac. On January 1994
was the start of foundation construction for engine unit 1 and 2 power plant building
auxiliaries. April 1995 power plant building, tank farm and deep well completed. October
1995 TPC two 6.3MW power generating sets are fully functional. June 1996
construction of engine 3 foundation and tank 3 began. June 1997 tank and engine 3
foundations completed.4pm departure then 6pm arrive back at VISTA VERDE 7pm
The day started with 5:30 am wakeup call and 6:30am breakfast also time to check out
water resources. The Philippine spring water resources produce 3000 different brands
of bottled water and it is divided by 3 types the purified, distilled and alkaline they are
not doing recycling here they also produce the10,000-12,000 plastic bottles per hour on
their manual machines process at 220 degree Fahrenheit and 30,000-35,000 for their
fully automatic process. It is just operated by 2 people one as the operator and the other
one is for quality check. After making the plastic bottles it will be sent to rinsing process
then cooling process, then refilling, next is capping then packaging they are ding
manual packaging to secure the quality of their products then for final phase is the
The ajinomoto Philippine flavor food, inc. was founded on 1909 by professor kikuna
ikeda in japan and it is establish at 1958 in bulacan. They already have 2 APF factory in
the Philippines which is located at bulacan and cebu. Each factory is runs by 300
employees and 2 shifts per day. The process start for MSG is by bulk msg and packing
machine then QC checking and inspection next is transferring the finished goods to
warehouse and for the PEMP(used as raw material for blended seasoning) starts by
receive packing and raw materials then quality check and lab analysis next is it is
transferred to the warehouse. 11:30am pack lunch then departure to the next resort
5:30pm we arrive At MONTE VISTA RESORT much earlier than the itinerary because
we are expected to arrive at 8pm then 8pm dinner 10pm lights off.
4th day
The day started at 5am wakeup call followed by 6am manage buffet for breakfast.
DISTILLERS INC.