Professional Documents
Culture Documents
Required:
a.) mt
b.) QSroom3 & QLroom3
c.) QLroom4
d.) Duct sizes
Solution:
a.) mt
mt = ρa ( Q1 + Q2 + Q3 + Q4 + Q5 )
From table 6-2 by Stoecker @20°C; ρ = 1.2061 kg/m3
For Q4:
Qs4
Q4 = 1.0062 (𝑡𝑠−𝑡𝑟)ρ
10kw
Q4 =
1.0062 (25−20)ρ
mt = 7.812 kg/s
b.) QSroom3
Qs3 = 1.0062(md3)(tr-ts)
Room 3: Q3 = 2.0m3/s
md3 = Q3ρa
md3 = (2.0kg/s)(1.204kg/m3)
QSroom3 = 1.0062(m)(tr-ts)
QSroom3 = 1.0062(2.4082kg/s)(25-20)
QSroom3 = 12.116Kw
QLroom3
QLroom3 = 1.0062(md3)(Wr-Ws)
Wr = 0.0126 kg/kg
Ws = 0.0058 kg/kg
QSroom3 = 1.0062(2.4082kg/s)(0.0126-0.0058)kg/kg
QSroom3 = 40.956Kw
c.) QLroom4
QLroom4 = 33.8095Kw
d.) Duct sizes of the ducting systems
H=0.4836Deqf
W = 4H
P / m = 1.5 Pa/m
QCF = QD + Q2 = 2.75m3/s
QD = Q3 = 2.0 m3/s
C = F+D = 2.75
B = C+G = 5.151
G = I+H = 2.401
A = E + B = 6.151
H=0.4836(0.83) = 0.401m
W = 4(0.401) = 1.606m
H=0.4836(0.78)=0.377
W=4(0.377)=1.509
H=0.276
W=1.103
H=0.314
W=1.257
H=0.251
W=1.006