You are on page 1of 5
‘PROJECT DESCRIPTION - MUTIARA CENTRAL PISSB LJurutora Perunding YS S18 |Pembinean Tou Sele 8/8 ae ome CONTRACTOR: a ) "Soar efor FSSSOPIES® ao rca prot Oe mt eect tnetcntinirbecoans Yee [swjec; Submision of Methed Statomont of NB Tench Rectfeaton Works [ceseiptan: We would ke sub document sper be tes for ound approval = Meth Statement er TNS Tench Reciicatlon Works ev. O1 sy exec oe: sestoe xpeced py dom _s43010 1 Ws Fo ana G Serer Ey et term ates Zp No see connen sn copter wh contact nya speteaon TS ae int Copy: ops Omg 18 o Cmalrie Doak Tentane Dever Penang Anon YS 8 Bm Ponesrp aan METHOD STATEMENT ‘TNB Trench Rectification Works Purpose 4. Thismethodof statement describe the procedure and inspection instruction tobe followed for rectction works and re-concreting the TMB tench RC Structure rebminary and Preparation Works 1. TW8 tench wal surface should be cea, sound an tree from ol grease, cement aac an all loosaly adhering particles, 2. Marling the rectification area that needed to be hack away following architecture construction drawing. 4 Marking for hacking area wil consderfor extend rebar lapping between the esting rebar and new extension rebar 4 The structure wil be prop using adjustable prop before hacking works is proceed 5. Consutant/0.N wil be al for inspection before hacking works Star. Hacking Works 1. Proceed Hacking works afer alo approval rom consultant 2 Hackand cut away ll the marked concrete unl the existing reba is exposed 3. The exposed rebar shouldbe cea, fee fom dst onal loosely adhering parties fecifiation Works 1h unused exposed rebar fr Beam TNB.OL THB.G2 and Trench sb wl be cut using ony-fue cutting torch to meet thedinensin athe architecture drawing. 2. A the cutfuused rebar il be removed fom the RC structure. 3 Extension of beam an sb rebartenforcement wile install with 400 lapping withthe existing ‘eam rebar and 200mm for BC A. 4. Consltant/.0.W wil be al for inspection before Formwork stars. Foonworks- General 2. sal plywood and tbe: formwork to al hacked area to follow te dimension of the TB Trench according the architecture crawing after relforcement work's done. 2 Consltant/.0.W wil bea for inspection before concreting works starts.

You might also like