Status of margins available at existing ISTS substations for proposed RE integration All figures are in MW (as on 31.10.

2019)

400/220kV
LTA
Existing / UC MVA Aditional Margin on Additional Margin with ICT No. of Trfs
Name of station Quantum Remarks
Capacity existing / UC system Augmentation required for
(MW)
RE integration

220kV level 400kV level 220kV level 400kV level

Gujarat
2x1500MVA,
765/400kV •For 600MW at 220kV, 2x500MVA,
2x500MVA, 400/220kV ICTs which are on hold need to be
Banaskantha
400/220kV 700 0 0 600 0 2 implemented
765/400 kV
(400/220kV ICTs not •LILO of 1ckt of Zerda-Ranchodpura at
taken up for Banaskantha to be expedited
implementation)

Pirana 400/220kV 2x315MVA, 400/220kV 0 300 0 0 0 0

Total Total GUJ: 300 0 600 0 2 900


Maharashtra
•No space at 220kV level
2x1500MVA,
•1 no. 400kV bay (shown along side) is
Solapur 765/400kV
0 0 1000 0 0 0 already allotted to M/s Toramba Renewable
765/400/220kV 2x315MVA+1x500MV
Energy Pvt. Ltd. (for Stage-II connectivity of
A, 400/220kV
300MW)

2x1500MVA,
Aurangabad
765/400kV 0 300 1000 0 0 0
765/400/220kV
2x315MVA, 400/220kV

400kV Switching With 220kV yard and 2x500MVA ICT


Kolhapur 400kV 0 0 0 300 0 2
Station augmentation

Parli (PG) 400/220kV 2x500MVA, 400/220kV 0 600 0 0 0 0


Total Total MAH: 900 2000 300 0 2 3200
Madhya Pradesh
2x315+1x500MVA, SECI has been granted Stage-I connectivity
Khandwa 400/220kV 0 600 0 0 0 0
400/220kV for 450MW at this S/s.
2x1500MVA
Jabalpur PS 765/400 0 0 1000 0 0 0
765/400kV
1x315+1x500MVA, SECI has been granted Stage-I connectivity
Itarsi 400/220kV 0 300 0 0 0 0
400/220kV for 300MW at this S/s.
SECI has been granted Stage-I connectivity
Seoni 400/220kV 2x315MVA, 400/220kV 0 150 0 0 0 0
for 150MW at this S/s.
Out of 300MW injection possible at 220kV
level of Rajgarh S/s, LTA for 200MW has
Rajgarh 400/220kV 2x315MVA, 400/220kV 200 100 0 0 0 0
already been granted. Hence, balance
100MW margin has been indicated.
2x1000MVA, SECI has been granted Stage-I connectivity
Satna 765/400/220kV 0 300 0 0 0 0
765/400kV for 300MW at this S/s.
Total Total MP: 1450 1000 0 0 0 2450
Chhattisgarh
Dharamjaygarh 2x1500MVA
0 0 900 0 0 0
765/400kV 765/400kV
6x1500MVA
Champa 765/400kV 0 0 1500 0 0 0
765/400kV
Bilaspur PS 3x1500MVA
0 0 1000 0 0 0
765/400kV 765/400kV
Total Total Chhat: 0 3400 0 0 0 3400
WR Total Total WR 2650 6400 900 0 4 9950
NIL (SECI)
4X500MVA,
NP Kunta 400/220kV 1500 LTA to 500 0 0 0 0
400/220kV
APSPDCL
Kurnool (New)
2X1500 MVA NIL 0 1000 0 0
765/400kV
Srikakulam
2X1500 MVA NIL 0 1000 0 0 220kV level not envisaged
765/400kV
(1) 220kV level not envisaged
Vemagiri 765/400kV 2X1500 MVA NIL 0 1000 0 0 (2) subject to commissioning of Vemagiri -
C'Peta 765kV D/c line.
Total Total AP: 500 3000 0 0 0 3500
400/220kV
LTA
Existing / UC MVA Aditional Margin on Additional Margin with ICT No. of Trfs
Name of station Quantum Remarks
Capacity existing / UC system Augmentation required for
(MW)
RE integration

220kV level 400kV level 220kV level 400kV level

Telangana
Karnataka
NIL (SECI)
5X500MVA,
Pavagada 400/220kV 2050 LTA to 350 0 0 0
400/220kV
KSPDCL
220kV level not envisaged.
Narendra New
Charged at 400kV NIL 0 500 0 0 0 Injection at 400kV allowed in case of no
765/400kV
generation at Kolhapur in WR
Raichur New
2X1500 MVA NIL 0 700 0 0 0 220 kV not envisaged
765/400kV
Total Total Kar: 350 1200 0 0 0 1550
Tamil Nadu

(1) Stage-II Connectivity of 1500 MW & LTA of


Tuticorin GIS 1200 MW has been granted against 3x500
(erstwhile 3X500MVA, MVA ICTs.
1200 0 0 225 0 1
Tirunelvelli (PG) 400/230kV (2) Beyond 2000 MW upgradation of
400/230kV) Tuticorin-Salem corridor to 765kV level along
with 5th 500MVA, 400/230kV ICT is required

2X315MVA +
Malekottaiyur(Kalive
1X500MVA, NIL 500 0 0 0
ndapattu) 400/230kV
400/230kV
Nagapattinam PS With rearrangement of LILO at Nagapattinam
Charged at 400kV NIL 0 1000 0 0
765/400kV PS
Total Total TN: 500 1000 225 0 1 1725
SR Total Total SR 1350 5200 225 0 1 6775
Rajasthan
400/220 kV :
Neemarana 1x315MVA NIL 300 0 0 0 0
+1x500MVA
400/220 kV :
Jaipur (South) NIL 400 0 0 0 0
2x500MVA
400/220 kV :
Kotputli NIL 150 0 0 0 0
2x315MVA
Total Total RAJ 850 0 0 0 0 850
Punjab
Haryana
400/220 kV :
Kaithal NIL 150 0 0 0
3X315MVA
400/220 kV : 2nos 400kV bays available. 1x500MVA ICT
Panchkula NIL 0 0 0 500 1
2X315MVA+500MVA reqd
400/220 kV : 315MVA
Bahadurgarh NIL 150 0 0 0
+500MVA
400/220 kV :
Sonepat NIL 0 0 0 500 1
2x315MVA
400/220 kV :
Manesar NIL 250 0 0 0
2X500MVA
Total Total HARY 550 0 0 1000 2 1550
UTTAR PRADESH
765/400 kV :
Kanpur(New) NIL 0 1250 0 0 0 220kV Not available
2x1500MVA

765/400kV :
Fatehpur 2x1500MVA; 400/220 NIL 0 0 0 500 1
kV : 2X315MVA

400/220 kV :
Mainpuri NIL 150 0 0 0 0
2x315MVA +500MVA
400/220 kV :
Sohawal NIL 100 0 0 0 0
2x315MVA
765/400 kV :
Lucknow (new) NIL 0 500 0 0 0
2x1500MVA
765/400 kV :
Balia NIL 0 850 0 0 0 220kV Not available.
2x1500MVA
765/400 kV :
Bareilly(New) NIL 0 500 0 0 0
2x1500MVA
400/220kV
LTA
Existing / UC MVA Aditional Margin on Additional Margin with ICT No. of Trfs
Name of station Quantum Remarks
Capacity existing / UC system Augmentation required for
(MW)
RE integration

220kV level 400kV level 220kV level 400kV level

765/400 kV :
Varanasi NIL 0 500 0 0 0
2x1500MVA
Total Total UP 250 3600 0 500 1 4350
NR Total Total NR 1650 3600 0 1500 3 6750
Odisha
400/220kV:
Baripada 2x315MVA + 0 600 0 0 0 0
1x500MVA
Indravati 400/220kV: 2x315MVA 0 0 500 0 0 0

Keonjhar 400/220kV: 2x315MVA 0 300 0 0 0 0

Pandiabil 400/220kV: 2x500MVA 0 900 0 0 0 0

Rengali 400/220kV: 2x315MVA 0 200 0 0 0 0

Rourkela 400/220kV: 2x630MVA 0 300 0 0 0 0

Angul 765/400: 4x1500MVA 0 0 1500 0 0 0

Total Total Odisha: 2300 2000 0 0 0 4300


Jharkhand
Chaibasa 400/220kV: 2x315MVA 0 600 0 0 0 0

Daltonganj 400/220kV: 2x315MVA 0 200 0 0 0 0

Ranchi (New) 765/400: 2x1500MVA 0 0 500 0 0 0


Total Total Jhark: 800 500 0 0 0 1300
Bihar
400/132kV:
Banka 2x200MVA + 0 300 0 0 0 0 132kV level
1x315MVA
400/132kV:
Lakhisarai 2x200MVA + 0 200 0 0 0 0 132kV level
1x315MVA
400/132kV:
Motihari 2x200MVA + 0 150 0 0 0 0 132kV level
1x315MVA
Biharsharif-A 400/220kV: 2x315MVA 0 600 0 0 0 0
400/220kV:
Biharsharif-B 1x315MVA + 0 600 0 0 0 0
1x500MVA
Chandauti 400/220kV: 3x500MVA 0 600 0 0 0 0
400/220kV:
line corridor available for 2 lines; no space
Muzaffarpur 2x315MVA + 0 600 0 0 0 0
for ICT
1x500MVA
Saharsa 400/220kV: 2x500MVA 0 600 0 0 0 0

Sasaram 400/220kV: 2x500MVA 0 600 0 0 0 0 Line bays in GIS only.

Sitamarhi 400/220kV: 2x500MVA 0 600 0 0 0 0


Total Total Bihar: 4850 0 0 0 0 4850
West Bengal
400/220kV:
Subhasgram 0 300 0 0 0 0
2x315MVA +
Jeerat-New 765/400: 2x1500MVA 0 0 1500 0 0 0

Medinipur 765/400: 2x1500MVA 0 0 900 0 0 0


Total Total WB: 300 2400 0 0 0 2700
ER Total ER-Total 8250 4900 0 0 0 13150