WECON CONSTRUCTION & ENGINEERING LIMITED
roe roped esd erdcpmenst PL 28 Yn
‘ASCOM- Kein Can WCE (AHF 8
a araenoya be 8 an
Tide; BS" Ragu formainet Tesarmer ro ayn amet BS cco
Im accordance with SpecetonPreliniary 5 your reply rien sequester te lowing srepances
randig information
rr ea
eening ai vod a RP on 26 ar 079, plese confi te tached dots dnt ror oto
Tals pager, page cil acorn ge markopdaving
Your reply within *77 14 ener
Saba by MCs sted Date eps >>|
TeevovmiDsM _
muster
12 -tewh io 1 rar fs Wt ame CLAICOM Ketch Cory
1 6 Speciation 1 tes (lease pei)
Wepled ys Date:
ce nD tench (Cowp-ngamsvinosk CEWD-Wusu Cl BYD-KeNe
Bowe aa A004 temCng CL RE-YNLNLee HoYi
Bee Ho Vin
ere: Jetrychan@iplcom
are 2 Sumas!
one
a eet ecercheung@sn con wasp noc 59009Pgreupcor
Eesepstayicom:ramajplcomjelv@picom, eenchancjpl.com bily.ee@aecon. com,
eithechngoncom com ipi228e@gmalicom plz, ecom@aecom.cor
‘aisplongerna com tplz26asinocom raymond yrn@sio com raeghio@sine com Gav
{fe ing Yos sat Yeung Ken Lamy Le Ho Vr Vie Tang: Damen Chow
BE roposesTansfermer Scorn Arencment or Ta Po Town Lot 225 a Pak Shek Kok, Ti Po
BovvorsTansfonmer room ayoutpa Transfer foam amendment pat
wae
ome
Dear Mr. Cheung,
Aspro acuson ody esd it he flonase Kr fox youd =
1) The transformer room layout will not be revised as the previous amendment is minor.
2) Standard drawings as stated onthe approved transfomer room shall be fllowed {ue.version 13 of COP
4301 for Distribution Substation Design shall be followed)
53) CLP has no objection on the inatrusion of structural beam inthe cable trench of Main switchroom,
Finally a transformer room layout with the aforesaid structural beam indicated and another layout with
‘the agreed amendment marked are attached again for your reference,
‘Much appreciated.
Regards,
serry
“~A—_
{ee attached file 20170719 Trarsformer room layout pee attached
file: Transformer room amendmert.paf)
Jerry han
25/03/2019 16:08
To: "Cheung, Ho Man” ,"dextercheung@sino.co
“cdextercheung@sino.com>,"watslupo@sino.com" ,
"5300@-t-group.com” ,"8646psk@rpl.com"
-<2646psk@jrplcom>, "ram@jrpL.com’ ,
"jayiu@irplcom”
cc: "Jerychan@rpl.com" , ‘destercheung@sino.com"
“dextercheung@sino.cor, "watsiupo@sino.com’ ,
"5200@P--group.com' , "tam@jep.com' ,
"jayliu@jepl.com" , Helen Chan/JRP_ASIA@IRP_ASIA
‘Subject: RE: Proposed Transformer Room Amendment for Tal Po Town Lot 228,
2
24hat Pak Shek ¥ok,TaiPo [Document ink: Jerry Chan)
Dear Mr. Cheung,
‘Tired to called this morning but invain. Regarding tothe main switehroom forthe captioned projec, due
teste condition and coordination itis fund that 1no, of sturcture beam would intrude into the able
trench ae at main switeheoom.
‘Thus, we would lke to enclose herewith 2 layout to indicate the extent of cable trench affected by this
‘beam for your comment/approval.
In addition, further to previous Email communications regarding the amendment forthe transformer
oom, since we will have no further changes, would you please kindly advise onthe issuance of a revised
transformer room layout. A cad fils forthe main switchroom is attached for your easy reference
Should your have any query please donot hesitate to contact me at 2590
19383 at your convenient time.
‘Much appreciated
Best Regards
Jerry Chan
{Roger Preston Ltd
(852) 25909333 Ext. 105
F: (852) 2590 9897
E:jerrychan@ eplcom
4. Roger Preston Limited
Level 11, Tower 3, Millennium City 2, 388 Kwun Tong Road, Kwun Tong, Kowloon, Hong Kong
7 52} 2590 9333 | F: (852) 2590 9897 | E:infowjrp-group.com | W:
svwiep-eroup.com
Hong Kong | Bejing | Shanghai | Shenzhen | Macau | Singapore | Kuala Lumpur | Ho Chi Minh City
"Cheung, Ho Man"
ce: "dextercheung@sino.com" , “watslupo@sino com"
“ewatsiupo@sino,com>,"5300@P-t-roup.com" <5300@P-tgroup.com>,
“B64psk@irpl.com" ,"tamajrplcom"
-eram@irpl.com>,"aviu@rpLeom’
Subject: RE: Proposed Transformer Room Amendment for Tl Po Town Lot 28
3
aEat Pak Shek Kok Tal Po
Dear serry
\We have no comment forthe revized of column inside the transformer room af your attached drawing.
Regards!
HM
—-Original Message
From: jerrychan@irplcom
Sent; Tuesday, January 22, 2019 721 PM
“To: Cheung, Ho Man
Ce: dextercheung@sino.com; watsupo@sino.com; 5300@P-t-group.com; B646pSK@Irpl.com;
‘tam@jep.com; jayiu@\rpl.com
‘Subject: Re: Proposed Transformer Room Amendment fr Tal Po Town Lot 228 at Pak Shek Kok, Tai Po
Dear Mr. Cheung,
Further to our tele-converstion today, enclosed please find the revised markup on the proposed
amendment on the transformer rcom fo you reference.
In addition, due ta the changes onthe main switch room extent, a detall showing the proposed mounting
‘method of CLP cables inthe switch room is also attached for your consideration.
Detail design ofthe steel rack wl be submitted for approval at later stage of the development's
Should there be any query, please feel free to contact me at 2590 9333,
Regards,
Jerry
(See attached fle: 20170719 Transformer roam layout péfSee atached
fie: Detail Apdf(See attached file: Revised Main Switch Room.pdf)
Bask
15/01/2019 18:29
Sent by: Jerry Chan
To: chris63@clp.comhk
cc: dextercheung@sino.com, watsiupo@sino com, S300@P-tgroup.com,
_8646psk@jepl.com, Raymond Tam/IRP_ASIAGIRP_ASIA, Jay
LiyARP_ASIA@IRP_ASIA Jerry Chan/JRP_ASIAGIRP_ASIA
ase‘subject: Proposed Transfrmer Room Amendment for Tai Po Town Lot 228
*
ak Shale ok, Ta Po
Dear Mr cheung,
|We would like ta introduce us as te ERM consultant fr the captioned residential development.
‘Through recent coordination within our project team, it was realized that an amendment on the current
‘transformer room layouts required to suit other E&M services
“Thus, we Would like to enclosed herewith a mark-up transformer room layout, indlcating the size and
location of the amendment, fr yur consideration
In addition, apart plan ofthe current main switch room is also attached for your reference,
Should you have any query, pleas do feel free to contact me or my colleague Mr, Jy Liv at 2590 9333 at
Your convenient tim.
‘Thank you very much for your kind attention
best Regards
Jerry Chan,
‘Roger Preston ted.
{852} 25909333 Ext. 105,
F: (852) 25909897
E:jerrychan@rplcom
J. Roger Preston Limited
Level 13, Tower 4, Millennium Chy 1, 388 Kwun Tong Road, Kwun Tong, Kowioon, Hong Kong,
1: (852) 2590 9333 | F: (852) 2590 9897 | €: info@rp-roup.com | W:
rw rp-group.com
Hong Kong | Beijing | Shanghal | Shenzhen | Macau | Singapore | Kuala Lumpur | Ho Chi Min City
{see attached file: 20170719 Transformer room layout pdl}see attached
file: Revised Main Switch Room. pa)
Pleace consider the environment before printing ths eal,
Disclaimer: The information crtained in this e-mail originating from
Roger Preston Limited is intended solely forthe specified addressees.
‘Any further use, copying and dissemination of he information without permission of. Roger Preston
Limited s prohibited. Ifyou have received this message in eror, please notify the sender and delete the
message immediately
"The World in Our Hands'- Thine before you print
This ema is fo the sole use ofthe Intended recipients) and may contain confident information.
5
sftUnauthorised use, disclosure or detribution of this email o ls content is prohibited. f you have received
this emall in errr please delete itand notify the sender.
CLP Holdings Limited GERIATR
htps//wclpgroup.com
Please consider the environment before printing this e-mail
Disclaimer: The information cortaine in this e-mail originating from J. Roger Preston Limited Is intended
solely for the specified addressees.
‘Any further use, copyingand dissemination of the information without permission of. Roger Preston
Limitedis prohibited. Ifyou have received thismessage in eror, please notify the sender and delete the
message immediately.
od