EAST COAST RAILWAY

Advance 4-Monthly Programme of Shri …E.V.K.Sivanand…Sr.TIA…CHE...….


Of ……Waltair………Division for the Period ending…31-3-2014…………..

Arrear Nil ARREAR


Balance Nil Sl.
Station DLC DOI TA
No.
Total Nil
Station due in Dec’13 24
Total 24
Available Mandays in Nil
23
Dec’13
Balance work in hand
25
at the end of Dec’13
Station due in Jan’14 19
Total 44
Available Mandays in
24 BALANCE MANDAYS
Jan’14
Balance work in hand Sl. Time Arr
20 Station DLC DOI TA
at the end of Jan’14 No Taken ear
1 CHE-Gds 15.6.13 7.09.13 4 1 3
Station due in Feb’14 19
2 VZM-Cog 8.08.13 13 12 1
3 CPP 1.6.13 4.10.13 8 8 0
Total 39
4 GVI 1.7.13 19.11.13 5 1 4
Available Mandays in 5 ULM 16.5.13 18.09.13 4 2 1
21
Feb’14
Balance work in hand 6 SGDM 12.3.13 13.09.13 4 3 1
18
at the end of Feb’14 7 VSKP/BO 10.10.13 12 4 8
8 CITC/VSKP 12.08.13 12 8 4
Station due in Mar’14 12
9 VNCW 22.07.13 6 5 1
10 VZP 16.08.13 12 10 2
Total 30
Available Mandays in
23
Mar’14
Position at the end of
+7
period ending Mar’14
Arrear Mar’14 Nil
Advance Nil
Total 24
Page - 2

Sl. TA Due for check in Re-


Station DLC
No A B C Dec13 Jan14 Feb14 Mar14 marks
1 CHE-Cog 3.9.13 8 8
2 CHE-Gds 7.9.13 4 4
3 VZM-Cog 8.8.13 13 13
4 VZM-Gds 22.8.13 4 4
5 CPP 4.10.13 8 8
6 Tilaru 12.10.13 4 4
7 GVI-Gds/Cog 19.11.13 5 5
8 Sigadam 13.9.13 4 4
9 Dusi 11.7.13 4 4
10 Alamanda 1.4.13 4 4
11 Nellimarla 18.5.13 4 4
12 Ponduru 14.11.13 4
13 Urlam 18.9.13 4
14 CHE-PRS 4.11.13 1 1 1 1 1
15 CHET-PRS 5.11.13 1 1 1 1 1
16 VZM-PRS 28.11.13 1 1 1 1 1

TOTAL 24 19 19 12

Date: - …………….. Signature of Dist TIA …………………………..


Approved Name …………………………E.V.K.Sivanand
Dist …………………………………………Sr.T.I.A/CHE
A.F.A(T)
E.Co.Rly/BBS
Page-3
ARREAR
Sl.
Station DLC DOI TA
No.

BALANCE MANDAYS
Sl.
Station DLC DOI TA Time Taken Arrear
No.