HERA GR
FUE Mamuju 2X 25MW Beets
KRARW ATR
Mamuju 2x25MW Coal-Fired Steam Power Plant
Method Statement for Soot-blowing System Commissioning
EKG HBL BCA PRA a]
Jilin Electric Power Research Institute Company Limited
2017 476 A€ ee MS
Secret level: Secret
BELT: QRG.L / JDKY—01—2015,
co 7
TRA BPR: EVE Mamu ju 2% 25M HABER HAAR A SER,
Project name: Soot-blowing System Commissioning
Coal-Fired Steam Power Plant
STEAL EE HE DI PE FEB ATR A
Responsible department: Jilin Electric Power Research Institute
Company Limited
as PBR
Write:
wa Aas
Review:
fi ks re
Approval :
PLTU Mamuju2 x25 MW
REVIEW E APPROVAL
=necers
INFORMATR
Remarks
Pisces “Review or approval hal no Sy way
contractor rom responsibilty for errr or davaton
OAD
in Mamuju 2X 25MW1.0
2.0
3.0
4.0
5.0
6.0
7.0
TABLE OF CONTENTS Ft
General information
Resource
Preconditions and requirements
‘System commissioning
The duty of the test staff
Control measures of HSE
Appendixes1 General Information (A Hi28
1.1 Sphere of application 3/1204
This MS is applicable to the soot-blowing system commissioning in Mamuju
2x25MW coal-fired steam power plant.
AST RGGI F EW e SS ABAAME 2x25MW HEARED RST.
1.2. Reference documents sii (4
"Code of safety operation in power engineering construction Part 1: Steam power", DL
5009.1-2014
CATE Be THERA BS ABS}: 2k ALA DL 5009.1-2014
"Code for fossil power construction project from the unit commissioning to completed
acceptance", DL/T 5437-2009
(KAR ERT ARABELLA) CDLIT 5437-2009)
"Technical specification for thermal power erection and construction Part 2:Boiler unit",
(5190.2-2012)
CHEE Bhi CALNE 2 Mb: HAWLEY CDL 5190.2-2012)
"Emergency evacuation plan", CHEC
RST SH TE]
"MS for management of the commissioning process-PTW and LOTO"
“BUEN” Be CTR FET” ALAR
2 Resource FARE
2.1 Human Resouree AJ #8 iil
‘Type of work Quantity (people) | Remark i
TA at
Responsible for resources
Supervisor : coordination of the
WRT A commissioning
iia BE
Instructing operation according to
the technological requirements,
Technician : checking the integrity of
ABR A SH commissioning, recording the test
results
HET R, REWR TEMETE, RU MAR Ae
R
Responsible for resources
coordination of the unit tial
running Aiki Et NE
Shift engineerlif 1 1
RDM thi.
ration staft | Control room chief
epost | Com aa operator 5 oes
pe : runningHLAitiz RAR OF
453EHLAS | Control room vice operator 5 ge
BT) al é
‘Checking equipments locally
Local operatoritt 6 during the unit trial running#L41
Renee.
2.2 Commissioning equipment and material iff it vt 4
Serial Device name | Model Quantity Remark #15
NoJFS REUE a Sit
1 Interphone VX-210AU 2
TURAL
3 Preconditions and requirements MABWRERER
3.1 Road, civil, installation, drainage channel, handrail, trench, on-site lighting and
communication facility etc, have been completed.iHi. at, #248, fbyKyi, FUT.
YY AR, DUNHAM eM
3.2. The I&C Cinstruments & communication) instruments are installed and calibrated
properly, MTR OEMS, NAAT RHE BSH.
3.3. The relevant electrical equipments (switchboard, operating button, instrument ete.) are
installed with correct indication, proper operation and close power circuit 5% 4H FRAN HL
SURE CRE. PRA, TAR iPS IETS, HEAR IETA, PE RAL. HL
VERRALL SUA THER HT THE
3.4 Allair operated valves have good sealing permance, are qualified to open and close
properly, indicate signal and feedback correctly. All valves and equipments are numbered
and tagged. #5 HUSA, APB, TP. RR, BAMASRRREM. Ai
A, Be SS TEMS HE.
3.5 The sytem pressure test of the instrument compressed air system (>0.SMPa)is qualified,DAL ERS RMR
3.6 The limit switches of each soot blower ean be put into service properly acoording to
manual test. The soot blower operates smoothly even in the fully extending position. The
lances of soot blowers don't bend too much to work normally. ie 4485 }4 0 AR ABA AR AR
CLP RARER, WARE LAB GLA RH. WAGRHOAR2S H
3.7 Check each gearbox to ensure the oil level normal .A¢ 7 4 6 $e HMA.
3.8 Check the screw threads to ensure the lubricating grease normal Jc (tvifd HIE % .
3.9 Calibration of the safety valves record from manufacture must be complete. ‘ilifi) “HE (it
AYA METER ILE TOME
4 Procedures for test RIA
4.1 Soot-blowing system commissioning at static state "RAK REY as Mik
4.1.1 Drive the steam inlent valves and the drainage valves." RAMEE
185);
4.1.2 Drive soot-blowers to ensure the actual position in accordance with DCS, the
soot-blowers operate reliably. WARREN (LH, PREM AR SE Ibi BALA LEB, We
RESET, FARR
4.1.3 Simulate the program-controlled procedure of hot operating state by the cold state test.
PAAR INS, BUUGRAHUZ Aft, IAAT ULES, WOK R GRU ORTEEULT
4.2 Soot-blowing system commissioning at hot state WAR RAM ASIN
4.2.1 The pressure calibration of the safety valves for soot-blowing steam source: when the
boiler load reaches 20~30% of the rated load, the calibration of the safety valves can be
carried out by the manufacturer of the soot blower with cooperation (if necessary). However,
the safety valve is generally calibrated before leaving the factory and no need to do it again
in field according to the requirements of drawings. "WARIS U2 UNI EE: 4A TIA,
20~30%I, AIRC MKAR EET AHMET RATE CE COREE) 6 (AE
RET VE MT WS Bese eH, HCE HL ASE ME.
4.2.2. Adjust pressure and temperature of the soot-blower system. Control the pressure from
1.SMPa to 3.0MPa, control the temperature from 300°C to 350°C. Put the soot-blowers into
operation on-site one by one, check the mechanical and sealing performance in hot state.Make sure the soot-blower operating to the correct position.RAR RWIS J) FUL
6. FE JESSE 1.SMPa~3.0MPa, iA MERE ICHHYY 300°C ~350°C, HI —-BEA BE
FAURE, AASB MRAN (RL RE, THAR ORI AT As
4.2.3 Put the program-controlled function into service, and the soot-blowing system operates
properly, KARAS A, FIEDLER.
5 The duty of the test staff RMA RR
5.1 The staff has to abide the “Safety code” and the relevant safety rules strictly in
commissioning, to ensure trial running safe and reliable. NN itiz (IFA IEA USP
UT CRD) RWGAKRAME, WARMER.
5.2. Before commissioning, be sure to make the technical clarification to the site operators,
especially the considerations about the procedure. ZE WHR FFT, SEIALNSBME A DAT
BORSA DRE ERE.
5.3 All operation personnel should be familiar with system, equipment and "Operation
BARRAGE Vea wT Cis
Manual", qualified by training. Ar 45 WUAIZ4T A HUN
TMD, FARMER ON.
5.4 Inform the non-test personnel to depart from the site before the test . The staff know the
test responsibility, method and procedure well. The communication system between the
on-site and the control room is ready, so that good teamwork is guaranteed. i 32d Mis MITE
KARRI, RAAT NO HPA RAT, PR, ACHR EA Bait
LEE A RISK A, JRE, BEI BRIE
5.5. The operator on duty should report the equipment defect or abnormal situation to the
shift engineer as found. The operator should take part in defect treatment and make records
properly. (AJEA ARICA IR, MERRIE, IFES MURR, fee
WR.
5.6 The Operation of power outage and transmission must be executed by the electrical
personnel with operation tickets.4f3¢42/CIT. UE HEL BEF ii rh ACA DU RR ER BMAT «
5.7 Someone must be put in charge of keeping order, clearing sit and counting noses. IJ
AMS HIE, NG PTE BARCAEIN EAB
5.8 Ensure the commissioning personnel, the operation personnel and the installationpersonnel is on duty, so that the equipments safty can be guaranteed. ii 2S AINE
ENA TED, DARE BIB AT IN HEE
5.9 Sct up dedicated channel for the interphone to guarantee communication (#1 AHFHL,
AEE AS, UAE NG.
5.10 Keep sundries, garbage and waste ete, out of the site , keep the site clean during the test.
[RUGWIIRI ASP ELA Ze. SU. BERGE, PARR.
5.11 Apply the three-phase five wire system to the on-site power. The electric leakage
protection device is fixed in the switch box with electric grounding properly. Lighting at
night is sufficient. A} H\— ARH SMIHER A, TPR AAA REL, HPA
ENE, ACTER AA AL
5.12 The operator on duty should abide by the operational items of the soot-bloweing system
during testing and operating 4EiAS2 AUR VERLPE TT, (ADEN BA NCIR AR SEHR ARK 6
6 Control measures of HSE 34:. (8/86 9p S348: 4 iti
6.1 Clean the operator access ways. iii AY 7532 »
62. Establish safety ladders and scaffolds for operating valves. 928 (19 I T4422 8 #0
WER.
6.3 Install enclosure and warning signs in the test area iNSR SILER ATMA.
6.4 Place the permanent fire extinguishers DHAKA TERA «
6.5. Putup the "No smoking" signs. 31: WALA «
66 Putonear plugs. R119.
6.7 Avoid working in high temperature enviroment for long time. WESCASIN HL HEML »
68 Keep hands form the rotating components, #811: Fa -F/eBUie eM «
See appendix B JSA. SUM BISA.7 Appendix (it
Appendix A [ftdé A
Mamuju 2x25MW Coal-Fired Steam Power Plant
Unit: Specialty: Boiler system: Soot-blowing system
Preconditions and requirements & MWA RER
oe Standards and requirements YES /NO
PERER sea
|, installation, drainage channel, handrail, trench, on-site lighting and|
|communication facility etc, have been completed.iiiit. kit. Je. He]
ie, RORR. AaHE A. TLIO. A a Ove
IThe I&C instruments are installed and calibrated properly. 48-T-0-R CE 2
eI, BEAT AN CALAN RS H
[The relevant electrical equipments (switchboard, operating button, instrument|
etc.) are installed with correct indication, proper operation and close power
circuit $5 ER AF IE LE AML, MEH AB RAF A |
ESM. AR ARIE. PRESRARL, LAR, SLA AINE NUE
Sti FH
[All air operated valves have good sealing permance, are qualified to open and|
lclose properly, indicate signal and feedback correctly. All valves and|
lequipments are numbered and tagged. #+" CANIRIE PM Aiki, SAFARI, IT.
PERI, Tai SRE. AMT. eee i ERE
The sytem pressure test of the instrument compressed air system (>0.5MPa) is
ual UGA aR BEA
The limit switches of each soot blower can be put into service properly
lacoording to manual test. The soot blower operates smoothly even in the fully]
lextending position. The lances of soot blowers don't bend too much to work]
Inormally.F-2) MEE ROK AR BF MER ORC RR RR, PR ASL OLY EVE
Lie eA WRASSE
[Check each gearbox to ensure the oil level normal itt # tafe MAINZ.
[Check ‘the screw threads to ensure the lubricating grease normal AR (i 7tH8|
ji A.
(Calibration of the safety valves record from manufacture must be complete. ‘i
SELB AY Se 4 PEER AE 7c EO 5
Remark:Hie ‘The system ready for trial test operation.
Conclusion GREA GRE RM
Acknowledged by,
HE LBRLRRUDRAZ (28%) + Date:
VARRAMILACAELEPRI C2EF) + Date:
FREMALRRICHEC CRF) Date:
ARAEARARA/RDM CE) + Date:
JUIEICARAUIELEMKA (45%) + Date:TLE EW = payajduicoun
pause 4 aHERPAT eres at See f oe ie
“EA BeM.L) ar “Shem ssoooe sopesado ay uea[Q | — sonyense>y suordaa ity | “yay Buyer as
BR at iad aes
SLi SsaySINBuNND aN WoABALOd 24 29eIg | osu | srauaueee
“HOLA TIE Rag | wowdnbg mann 207 | oneal
GH “MPGTERE O.LOT PUP AXLd * SuNsojoud jpeIsut ‘ous 94) UBD]. ‘i ~ oN,
* “asi ind 389 UO In, exe Saw
‘EALW “es10u donpar 0} (qpsg 4A0) sBnyd sea uo INE ‘ease uy sty ae adits Of
FT A sam0g; Kap Raa
HALA ses9r0 Mazes Suywoy ae BRE ehh A
SpE 2e Bw) “TojurOY Kozes BULAN BSH | paideoin
SSIS “ng Upon Ey HO] ! vida
“GIES “wonvonpo Kayes
z
“RUMANIA SIT “TORE “aU somod | iG eY LES RTE
a 0} d9efd [eUIsLI0 yl ye EIST soueyug | — sanpense>y suoiou [1 5 S101, ciate
Af SURG Butso wor Kprsuaruy i xl ‘ay ume Ayana i
AEBA vonvonpa Aes quostog suotiar [Ty uoneradostyy Yet
ew ex
TE Hh tod Sunpeoy umays aedoy ue ~
ALP REELIA BUG Ym Suosiod pouty Suv waxy, | BARA rel ig ung | One orssqut09
SEOGEM | — Teuosieg suorBo4 [TV aBeyeal wears, woiss Bu
“Jha Severpourunt woysks Sumoyg-10os a4p uMopINyS 1§0]9-1008
Pred BM $0 oon wey met fee
sneay neg simgaim | MPV | ssa esting | sais a na
PEG MSE Be 0 MLA SE SA) 2 MOUssossy ysIY 40 /sisAfeuy Aes qor
a 2ef @ xTpuaddyWHEE Bw now TaN
“ARATE HA " LYRE
“aun Suo] J0j quouuos}AUD sunfesOdw} YBIY J9pUN SuBON a eed | sanqeiadwoy
‘Bhs 4A Artpaw pam moeery. SMONSFH | yoique — yatH
PGT SE
“P4SBH MN
“vou qSoy auf Ul SUIS HUNUBAS pu aINSOjaUD [TRISH]
[HE Aa HEME
w
Ms BisEAMG Th BW AG 7 3UO1 a apis pur V apis Ug
SEMA LE Lf BV LE _ | PONY a oPIS pur y apis ues
REMAN Sy THM AV FEZ PONY 1 aPIS pur Vy apis EIS
HEMORU SS € fh BV JE € POXY @ aPIS pur y apis uEIg
HOPURLELS Pf) BV AEF PeXU a ePIs pue V apis UES
SELMA ELE § fi BV HE _$ POXY L9PIS Pur y apIs EIS
BGO 9 fil) BV FE 9 PAXY a apis pue vy apis UES
fu cwag AV 3 _Searea uIEHp pres pue V IP ASOID
LITRE SATA fay ssaud wreays uado
LITRE anten wears uado
INCA) AV Lé _seatea ureap q pis pue Vy opis odo
LUVIS WVADOUd WALSAS DNIMOTE-LOOS:
IWALSAS DNIMOTS=LOOS : TIWGLLI
RIVA L1nsaa NOLIONAA IDOT | TIVNDIS LOANI
BRAG
uIND
uaTIog
RUVITIXOY YOLOW AOOTAALNI FP AONANOAS
NOITU LSAL ALIS
AMIN STxT APNIAVIN LTE
ANVTd YIMOd GIL TVOD.
22h O xTpueddy"
ava,
: aN
: ARULLVNOIS
waa yuWaTa Px ite) zvua raaae
:@GLV1dWOD
AdagAOuddy | Ad GasIANadns AS SSINLIA Ad GALSaL
FALLON
LISTARIRDSE Mea ray ssard wears 28019
LIE RAMRLARE —aTea usweNs 26012)
HEMT
av de
1 8uo| 2p pu v2pis 1g| LTRS Lid V_ euUOU | Buoy apis | CISSDH-Sd| TL
TR AMAS TGV eMU0UZ Bu] yapis | CISSDHSd] 1
BIR MAE | fig V_ BaUOU | pexy Vv opis (oad | ot
BALOMALEG Tf VY leuuoU Z poxy v opis (coma | 6
ARATE fy Cf V_euOU ¢ poxy V aPIS waa) 8
ETRE GARE v HV_TeUU0N y poxy Vy 2pIS aaa) 2
BTW MMELE $ fig V UUOU ¢ poxy V apis. (aaa 9
MTB MBG 9 fig V ULOU 9 paxy V apis. (coa)aa s
SETLITANHELA TeuwoU anqea cary ssasd wreang ’
SPSTL| Cees wuoU o9yea rears €
SCAT ACAEHIG A yeustoU sonrea urEap « opEs z
SATIN AAEHIG V__TeUIOU sonea uNEAp V OPIS 1
syreursy ynsay ae aan wor] oak ne
APE YE wLA0y ys99 Buoy
Aopog +Aypepads
wiayss BUIMO]G-00g :ta}sKs
u09 W9)sh65
snug,
Jue]d A9Mog WEA'S PAt-THOD AAIASTXZ nfmmEAL
a2¢ fd @ XTpueddyae. + (ER) VANITY ERS
males * GER) WOME AW EAR
bert + CER) OSHOREN TIE
area * GER) RTA abe vet
£4 podpaynouyoy
SATAWEG Ya uso ues urEsTosd waysks Fumojqoog Iz
BARN fib d UO | Zuo} Gapig | (IS-SAH-SA]} Oz
HARON fi A wusOU ZBu0] g apis | (ISSDH'Sd | 61
MATS WOALIELS 1 fi @_ TeUNOU | paxyy @ apis (o@aa} 81
EET CARLELf T | | eUUON Z poxY ef 2PIS @aaa} 1
YATE MRLENS € fi TPUMOU ¢ paxy a apIS @aaa] 91
SEILER Gv fil @_TeUUIOU p Paxy G PIS aaa} si
euUOU § paxty g aPIS aaa} rr
HATE ARTL 9 i _YECUOU 9 paxy € ePIS (oMaa} etSSS MEER Ae OTP
BETA ae Sete
Hat
ill
ail
Se
AEM A xtpueddy